Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008.

Slides:



Advertisements
Similar presentations
Risk Assessment Refinement BARRIERS TO MIGRATION Aerial Imagery Capture and Processing Derive Channel TypologiesDevelop Remote Sensing Methods Fieldwork.
Advertisements

The European Eutrophication Activity and the UWWT and Nitrate Directives Ana Cristina Cardoso.
NGO work with the implementation of the Water Framework Directive in Finland Hannele Ahponen Water project coordinator Finnish Association for Nature Conservation.
Marine Strategy Framework Directive: Goals and Challenges
1 What happens next? November Contents WFD timetable & consultations The River Basin Management Planning Process Applying classification Making.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
Are there any Supplementary Measures? Tom Stafford 5 February 2013.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Marine Strategy Framework Directive Consultation on Good Environmental Status Descriptor 7 – Hydrographical Conditions Dr Alejandro Gallego Marine Scotland.
Overview of WFD key issues and research needs in Europe Activity leaders: NL and ES Marc de Rooy, RIZA, NL Jornadas sobre la Aplicación de la Directiva.
End users of MIDA – a government perspective Trevor Harrison Environment and Heritage Service Department of the Environment Northern Ireland.
MSFD - POMS Consultation Descriptor 1 – Biodiversity Descriptor 4 – Food Webs Descriptor 6 – Sea-floor integrity Simon Greenstreet, Marine Scotland Science.
Advisory Council 10 th Council Meeting - 3 rd September 2008 Strategic Environmental Assessment (SEA) Ray Spain.
Water Framework Directive Programme of Measures River Basin Management Plans Milan Matuška Ministry of the Environment Slovak Republic Water Protection.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Daniel Baláž, Ján Černecký State Nature Conservancy of the Slovak Republic Nature Conservation and River Monitoring in Slovakia.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
WWF & Heritage Lottery Fund QUESTOR Centre, QUB. Introduction River Basin Districts Lough Neagh Ballinderry River & Management Area RIPPLE What is it?
German Guidebook on the Implementation of the EC Water Framework Directive Dr. Harald Irmer Germany.
Forest and Water POMS Study. Forest now constitutes 10% of land cover in Ireland (from 1% in 1920) –43% is on peat soils –Objective to expand forest cover.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
IPPC Discharges Monitoring Workshop Water Framework Directive Overview (and its implications for Industry) Peter Webster Regional Chemist (EPA Cork)
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
1 EU Water legislation PEIP National Workshop – Montenegro Budva, May 2008 Dagmar Kaljarikova Policy Officer for Turkey, Montenegro, NGOs and REC.
Fish migration from a Water Framework Directive perspective
Date/event: EEA EIONET Freshwater Workshop 27-28th Sept 2010, Copenhagen Author: Dr Manuel Lago (Ecologic Institute, Berlin) ETC/Water 2010 Overview of.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Water Framework Directive Implementation and Risk Analysis John Sadlier Water Quality Section.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Management of the coastal and marine environment: The legal framework of the European Union from the first EEC Directives to the Water Framework Directive.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
River Basin Management Plan Steps, Status and Objectives.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012 Almaty, Kazakhstan The EU Water Framework.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Environmental Services Training Group
Áine O Connor National Parks and Wildlife Service Ireland
Relationship between EUROWATERNET and the Water Framework Directive, and for broader water reporting Steve Nixon ETC/WTR.
Principles and Key Issues
Environmental Services Training Group
Project Coordination Group (PCG) for the implementation of the MSFD
Marine Strategy Framework Directive (MSFD)
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
EU Water Framework Directive
River Basin Planning & Flood Risk Management in Scotland
Marine Strategy Framework Directive (MSFD)
Preparing a River Basin Management Plan WFD Characterisation Manager
LIFE and the implementation of the Water Framework Directive
on a protocol for Intercalibration of Surface Water
Project 2.7 Guidance on Monitoring
DG Environment, Unit D.2 Marine Environment and Water Industry
Fitness Check EU Water Policy
Strategic Steering Group on Agriculture & Water Framework Directive
The New Biogeographic Process General info – December 2011
Finalisation of study report
DG Environment, Unit D.2 Marine Environment and Water Industry
Frequently asked questions Part II: Coordination of monitoring under WFD and BHD Workshop: Biodiversity and Water - Links between EU nature and water.
DG Environment, Unit D.2 Marine Environment and Water Industry
Item 7. Paving the way for WFD in Cross Compliance
Finalisation of study report
EU nature, marine and fisheries policy:
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008

Freshwater Pearl Mussel Lives in nutrient-poor, acid to neutral waters of rivers flowing over granite or sandstone rock, mainly in the western part of Ireland, but also in areas of the south and south east where geological conditions allow They have a complex life cycle and mature between 7 & 15 years of age. The larvae (glochidia) initially attach to the gills of salmonid fish hosts which provide nourishment, before they become large enough for independent development in the river bed.

Background Key objective of the Water Framework Directive –to achieve compliance with any relevant standards and objectives for water dependent habitat and species protected under the Habitats Directive. Freshwater pearl mussels (Margaritifera margaritifera and Margaritifera durrovensis) are on Annex II of the Habitats Directive Because they are particularly sensitive to environmental pressures, may require catchment specific measures in sub-basin plans supporting basic measures. Regulations containing environmental quality standards are being developed

Quadrat Searches Photos by Dr Eugene Ross

This is what shell length profiles should look like

Background The 2007 Habitats Directive Article 17 Conservation Assessment Report –concluded that all of the 27 SAC populations, listed in Annex II are in unfavourable condition –deterioration in water quality and, in particular, to the loss of juvenile habitat in the substratum through eutrophication and siltation –Programmes of Measures for these 27 SAC populations to restore the water- and substrate-habitats to the quality required by fully functioning recruiting freshwater pearl mussel populations.

Location of the 27 FPM Catchments designated

Sub-Basin Plans Undertake a detailed assessment of pressures in the catchments of the 27 freshwater pearl mussel populations, identified in Annex II, Develop the necessary catchment specific measures and sub-basin plans to meet the water related needs of the species. Plans must comply with the proposed European Communities Environmental Objectives (Freshwater Pearl Mussel) Regulations 2008 Plans developed in two phases Part of NS 2 contract

National Co-ordination National Committee established by DEHLG –to provide guidance for freshwater pearl mussel sub- basin plans standard set of measures which can form the basis of the POMs Consultants role –provide advice, reviews and studies as necessary Establish Freshwater Pearl Mussel Committee in each RBD with FPM site

Methodology

FPM Sub-basin Plans: September 2008 – December 2009 FPM experts - 55 years of planning & fieldwork experience Robust evidence needed to justify plan changes Phase 1 Database & GIS – collation of datasets Desk study – comprehensive review of pressures and indicators Monitoring programme – based on WFD class systems tailored to FPM habitats & prioritised to fill key data gaps in 2008 Legislative & policy review – informing measures development Methodology

Assess key impacts Develop generic/strategic measures: –minimise pressures –prevent poaching –purchase subcatchments –captive breeding programmes –augment/remediate habitat Develop pilot plans for prioritised subcatchments Phase 2 Monitor – to complete pressure & indicator datasets Consultations – Phase 1 plans feeding into Phase 2 plans Tailored catchment specific measures for each sub-catchment Further consultations on specific sub-basin plans Final recommendations data, monitoring etc Methodology

FPM Sub-basin Plans - Fieldwork Qualified surveyors Margaritifera, macroinvertebrates, phytobenthos, macrophytes, morphology, siltation, fish physico-chemical support via LA programmes Bundorragha River, Co. Mayo

FPM Sub-basin Plans – Write-up Introduction Status Nationally and in the Catchment Pressures Affecting Status in the Catchment and Measures –Modification of cultivation practices (agriculture, afforestation etc) –Taking / removal of fauna –Peat / Sand and gravel extraction / Mines –Urban and Industrial Discharges –Pollution –Communications networks –Sport and leisure structures (fishing) –Drainage –Erosion –Interspecific faunal relations –Climate change Summary of Catchment Management Plan

FPM Sub-basin Plans and WFD River Basin Plans Details from the FPM Sub-basin plans will feed into the RBMPs This will allow for more effective consultation both through the RBMPs and the NS II FPM consultations which begin in January 2009 Public participation is also a key element in relation to the Freshwater Pearl Mussel Plans