UNCLASSIFIED JTEN Reduction Plan Mr. Steve Kostoff DD JS J7 JCW Environment Development 15 February 2012.

Slides:



Advertisements
Similar presentations
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Advertisements

SADDLEBACK VALLEY UNIFIED SCHOOL DISTRICT BUDGET PLANNING.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
LAO State Budget Update Jennifer Kuhn Legislative Analyst’s Office Presented to: CCSESA February 24,
USJFCOM UNCLASSIFIED 25 Aug Joint National Training Capability - Corporate Board FY 10 JNTC Budget Al Lawver JNTC Program Director.
Page 1 Non-Assurance Services Caroline Gardner IESBA December 2013 New York, USA.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
How Do Army Personnel obtain DoD Decals? Issue: Recently the Department of the Army has cut funding for and the use of, Army DoD decals for admittance.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Pacific Warfighting Center (PWC)
PRJ566: Project Planning and Management
1 Low-Income Housing Tax Credit Legislative Update Robert Rozen Washington Council Ernst & Young June 2011.
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
K-20 Education Network Update for the NWESD Districts May 9, 2013.
Server Virtualization: Navy Network Operations Centers
TECHNOLOGY AND THE BOND PROGRAM TECHNOLOGY PLAN
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
School Construction Plan Review What you need to know.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.
Progress Update: Evaluation of Federal Facilities in WIPs and Milestones CBPO Management Board March 6, Jim Edward, EPA Greg Allen, EPA.
The University of Texas at San Antonio The Office of Information Technology Network Upgrade Overview.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
United States Joint Forces Command UNCLASSIFIED JNTC Accreditation and Certification Update March 2009.
1 Determining the High-level Direction of Information Systems Part 2.
Open Budget Meeting Budget and Finance Budget Reduction for FY13 FY 2013 FY 2013 State Appropriations $ 22,799,099 FY 2013 Special Funding Initiative-Nursing.
UNCLASSIFIED SEP07 Soldier and Family Assistance Center Briefing Colleen Tuddenham SFAC Program Manager Installation Management Command December.
Louisiana Library Connection Network August 2004.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
ALMA Archive Operations Impact on the ARC Facilities.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
Issue : Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant.
August 21, 2009 Mr. Keith Hagenbuch DeCA West Acting Director.
Simplifying the Budget Process
Administrative Services EVANSTON October 19, 2015 FY 2016 Proposed Budget Presentation Martin Lyons Assistant City Manger / CFO 1.
Connecticut Education Network “Forum” June 14, 2001.
An Application of VoIP and MPLS Advisor: Dr. Kevin Ryan
Facility Consolidation Proposal IEM 5121 July 21, 2003 Robert Volk.
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
SunSatFriThursWedTuesMon January
Network Topologies Created by: Ghadeer H. Abosaeed June 22, 2012.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Agency for Persons with Disabilities Update House Health Care Appropriations Subcommittee February 18, 2014 Barbara Palmer Director Rick Scott Governor.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Budget Cuts and Their Consequences Mark Grey Assistant Superintendent, Business Services.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
West Contra Costa Unified School District April 13, Budget Update Board Meeting.
1 Future of the Exchange Network Whad’ya Node? Exchange Network Node Mentoring Workshop Presented by Molly O’Neill New Orleans, Louisiana February 28-March.
UNCLASSIFIED Research Development Test & Evaluation (RDT&E) Infrastructure Division 1 Pre-Solicitation Conference N R-0003 June 4, 2015.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
Oxnard College Campus Budget Forum Presented by: Richard Duran, President John al-Amin, VP Business Services Scott Corbett, President Academic Senate April.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
New Information 1 Governor’s proposed budget Basic Education Funding $200 million increase (Includes Right to Learn funding) Special Education.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Networks Physical Infrastructure Rick Finnegan April 22, 2008.
POLICE PROTECTION IN SPRINGFIELD TOWNSHIP. Lucas County Sheriff.
INFRASTRUCTURE INVESTMENT
ACGU Training Integration and Interoperability Work Group 22 September hrs Worldwide Joint Training & Scheduling Conference UNCLASSIFIED.
Sewer User Rate Increase PUBLIC HEARING
(Additional materials)
ESB Networks Market Release Meeting of the IGG, 1st October 2009
SmartMeterTM Steering Committee Update – March 2013
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2017
SmartMeterTM Steering Committee Update – February 2013
Budget Reduction for FY13
West Contra Costa Unified School District May 18, 2011
Presentation transcript:

UNCLASSIFIED JTEN Reduction Plan Mr. Steve Kostoff DD JS J7 JCW Environment Development 15 February 2012

UNCLASSIFIED Abstract In response to budgetary pressure, ED asked to consider ways to reduce costs accrued by JNTC technical infrastructure –JTEN one of the largest JNTC cost drivers As a result of previous budget cuts, most cost reductions taken with regard to JTEN have already been taken Therefore the best place to consider cost reductions now is in the size of the network itself 2

UNCLASSIFIED Method Based on work begun 2 years ago in the JTEN Recapitalization project, there are a number of sites on the JTEN that have low utilization rates These sites could be removed to save equipment maintenance costs and their needs for JTEN satisfied by the deployment of a JTEN pod Recommended cut list based on JTEN Recapitalization metrics Projected savings by proposed reduction approx. $750,000 OM/ year 3

UNCLASSIFIED JTEN Reduction List NumberSiteTotal Exercise Days Oct Present Remarks 1Keesler AFBN/AHub site –not needed w/ 2.0 2Camp Roberts (HUB) N/AHub site –not needed w/ 2.0 3Orlando (JDIF)765Recommend backside connection to JCW/McDill 4Schofield Barracks 591Recommend backside connection to Pearl Harbor 5Camp Courtney137Recommend backside connection to Pearl Harbor 6Shaw AFB26 7Fort Belvoir0 8Fallon NAS0 moving to NCTE 9Ft Sam Houston 12 10SOUTHCOM 16 11Fort Stewart 29 12Ft Campbell Davis-Monthan AFB36 14Ft. Sill Des Moines ANG – DTOC61 No connections to ARCNET permitted, thus no reason for JTEN 4

UNCLASSIFIED Two sites will be eliminated as no longer necessary under JTEN 2.0 (JTEN 1.0 hubs without local customers) Several sites can be made local backside connections to nearby JTEN nodes – JTEN node at such a site is eliminated and local network connected as backside to neighbor node –SITE PICKS UP REMAINING COSTS Remaining sites nominated on basis of low utilization, except in cases of special interest (link to another network, etc.) 5

UNCLASSIFIED Deployment Deployment phase begins upon completion of the Operational Acceptance Test in April assuming test is passed –Site surveys begin in April –Site installations begin in June –JTEN 2.0 upgrade complete June 2013 if schedule holds 6

UNCLASSIFIED 7

8

9