Navarro to Houston Presentation to ERCOT RPG August 27, 2013.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Houston Region Import Capacity Project Planning for Reliable Power.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Regional Planning Group Project
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Strength Discussion
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
July 13, 2012 Transmission Needs Analysis Scenario 1 Update: BAU All Technologies.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Lyndonville Electric Department Feasibility Analysis Review December 2,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Houston Import Project – ERCOT Independent Review
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Freeport Area Master Plan Project -
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Warren Lasher Manager, Long-Term Planning and Policy
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
I-5 Corridor Reinforcement Project
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Presentation transcript:

Navarro to Houston Presentation to ERCOT RPG August 27, 2013

2 Need for Houston Import North to Houston (N-H) flows increased to 3,100 MW –Summer 2012, 75% quartile for N-H, 3,102.9 MW Current grid –G-1 case results in more constrained conditions in terms of Houston load deliverability prior to running into thermal/voltage stability concerns –Singleton – Zenith double circuit line overload observed as most limiting element Additional overloads observed along the existing N-H corridor –Thermal constraints observed to be more limiting than voltage stability constraints Independent studies by three TSPs identify a need for additional North to Houston injection In Summer 2012, North to Houston flows exceeded the ERCOT expected 2018 flows 27% of the time

3 Need for Comprehensive Analysis With 3 proposals for Houston import, ERCOT has the unique opportunity to: –perform a comprehensive, comparative analysis of the various options –identify a solution that will provide lasting reliability benefits for the fast-growing Houston area –coordinate major studies in development related to oil and gas load and Panhandle wind with Houston import to achieve benefits both to Houston and to the larger grid ERCOT should endeavor to provide long-lasting benefits for Houston that also strengthen the larger grid

4 Screening Criteria Lone Star analyzed the Houston area and ERCOT grid with the goal of identifying projects that would provide the following: –Increased incremental import capability into Houston –Route diversity and grid security –Access to North Zone generation –Strong link to CREZ renewable generation Evaluation Methodology Navarro projects meet each of the above criteria

5 Navarro Substation Benefits Navarro options provide higher incremental import capacity to Houston Navarro is strongly connected to over 10 GW of existing North Zone generators Navarro connects nine existing 345 kV lines and would create routing diversity versus existing Houston connections Navarro is the eastern terminus of CREZ and offers the most direct path for CREZ wind to reach Houston Navarro is state-of-the-art and readily expandable Navarro Substation should be considered for the northern terminus of any Houston Import Project

6 Recommended Houston Import Solutions Navarro to King 345 kV with 50% Series Compensation –High incremental transfer, 3,238 MW –Strong Alternate Routing –Strong link to CREZ and North Zone generators Navarro to King 500 kV –Highest incremental transfer, 3,558 MW –Strong Alternate Routing –Strong link to CREZ and North Zone generators –Start of 500 kV backbone –Requires the fewest upgrades to obtain >3,500 MW of incremental transfer –Can initially operate at 345 kV Navarro to Gibbons to Zenith 345 kV –2,700 MW of incremental transfer –Strong link to CREZ and North Zone generators Three Navarro options merit careful consideration for their benefits

7 500 kV Advantages Highest incremental Houston import capability Lower line losses Lower impedance: can divert bulk power to unload and relieve constraints on underlying lower voltage systems Expandable backbone connecting two major load centers (Dallas and Houston) to renewable and thermal generation Lone Star’s Navarro substation has room for expansion and uses 500 kV breakers on the existing lines at Navarro, Sam Switch, and West Shackelford Lone Star’s affiliate has expertise building and operating over 1,100 miles of 500 kV A 500 kV line would provide strong benefits to Houston and the entire ERCOT grid

Appendix

9 Navarro Substation is a strong connection point to multiple North Zone generators and CREZ Navarro Big Brown Trading House Sandy Creek Limestone Twin Oak Freestone Midlothian CREZ Bosque County Jewett STP TNP One Gibbons Crk Jack Crk Singleton Zenith King Hillje WA Parish O’BrienHolman Fayette Lost Pines Temple Sandow

10 Historical North to Houston Flow

11 Study Model Development Included WA Parish Addition (NG): 90 MW Included Channel Energy Center (NG): 190 MW Removed Pondera King (NG): 1,380 MW Removed Deepwater Energy Storage: 40 MW Removed Deer Park Energy Center (NG): 192 MW Removed Agrifos Steam Unit (NG): 0 MW Removed Tenaska’s switchable Frontier units (NG): 885 MW The studied base case reflects ERCOT existing generation and load projections

12 Reliability Criteria ERCOT Criteria per Planning Guide (1) (b) “With any single generating unit unavailable, followed by Manual System Adjustments, followed by a common tower outage or the contingency loss of a transmission circuit or transformer, all Facilities shall be within their applicable Ratings, the ERCOT System shall remain stable with no cascading or uncontrolled Islanding, and there shall be no non- consequential Load loss. “ Thermal Analysis used the loss of the largest unit inside Houston – Cedar Bayou 2: 745 MW Voltage Stability Analysis used the loss of the Gibbons Creek unit: 470 MW The studied base case reflects ERCOT existing generation and load projections

13 Voltage Stability Evaluation N-1 and N-1+G-1 analysis with loss of Gibbons Creek unit Houston Import Capability limited to 1,810 MW Voltage Stability Limit was not observed to be the binding constraint on North to Houston import in comparison to thermal constraints Thermal analysis was used as the primary gauge of evaluation of the studied transmission options The studied base case reflects ERCOT existing generation and load projections

14 Houston Import Projects sorted by Incremental Import Capability Proposer - Option Number Option DescriptionIncremental Houston Import Capability (G-1) (MW) Transmission Option Length (miles) Cost Estimate ($ MM)* MW/$MM LST-17Navarro - King (500 kV) LST-7Navarro - King (50% SC) LST-13Navarro - Tomball (345 kV) LST-5Navarro - King (345 kV) LST-10Navarro - Gibbons Creek - Zenith 345 kV CNP-15Twin Oak - Zenith 345 kV CNP-25Limestone -Ragan Creek - Zenith 345 kV GP&L/CTT-9Limestone - Gibbons Creek - Zenith 345 kV GP&L/CTT-4Gibbons Creek - Tomball 345 kV GP&L/CTT-1Gibbons Creek - Zenith 345 kV CNP-24Ragan Creek - Zenith 345 kV All Preferred Options from CNP, GP&L/CTT, and Lone Star *Cost Estimates include substation costs and required upgrades. *Cost estimates submitted by CNP, GP&L/CTT, and Lone Star are not made on the same basis.

15 Detailed Cost Estimates of Lone Star’s Preferred Options