CITY OF HOUSTON PUBLIC WORKS AND ENGINEERING July 17, 2008.

Slides:



Advertisements
Similar presentations
Introduction 5 Case Studies Impervious Cover (%) for Various Land Uses [2] [2] Low Density Residential 10 Medium Density Residential 30 High Density Residential.
Advertisements

CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
Preliminary Design of Galvez Estates Subdivision.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Cascade Charter Township
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Workshop for Rain Barrel Workshop Franklin County Stormwater Act 167 INFORMATION and how Rain Barrels can help ! By Nancy Cisar 3/10/09.
Texas Commission on Environmental Quality URBAN DEVELOPMENT AND WATER QUALITY Texas Commission on Environmental Quality October, 2008.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Better Site Design Sustainability & Stormwater
Western Washington Hydrology Model Version 3
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Stormwater Outlets Effectiveness of the Options. Stormwater Outlets Several options are available, such as the infiltration basins under the parking lots.
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
Sanitary Engineering Lecture 16
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Implementing Low Impact Development in Utah - An Engineer’s Perspective PRESENTED BY: CRAIG BAGLEY, P.E., CFM BOWEN, COLLINS & ASSOCIATES.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Modeling Green Infrastructure Components in a Combined Sewer Area Robert Pitt, Ph.D., P.E., D.WRE, BCEE Department of Civil, Construction, and Environmental.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Integrating LID Into the Development Planning Process.
Jason R. Vogel, Ph.D., P.E. Stormwater Specialist Biosystem and Agricultural Engineering Oklahoma State University.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Design of Infiltration Practices
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Discussion of Proposed MS4 Permit Design Standards Language.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Houston Land/Water Sustainability Forum David W. Peters, P.E., CFM, D.WRE February 6, 2008.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Local Plans, Regulations, or Policies Supporting Green Infrastructure City and County of Honolulu Department of Facility Maintenance – Storm Water Quality.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
LOW IMPACT DEVELOPMENT John Blount, P.E. Director Planning & Operations.
City of Dunnellon Comprehensive Plan Amendment  Future Land Use Element  Conservation Element  Concurrency Management System.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
City of Clarksville Storm Water Management Manual Revisions 2014.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Flood Damage Prevention Code Update
Huntersville’s LID Ordinance
Low Impact Development Practices
LOW-IMPACT DEVELOPMENT
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
Regulation Amendment AM April 3, 2018.
Northern California LID Hydrology and Hydraulics
Kickoff example Create a new file
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Presentation transcript:

CITY OF HOUSTON PUBLIC WORKS AND ENGINEERING July 17, 2008

General Topics  Chapter 9 Changes – Infrastructure Design Manual  Chapter 13 Changes – Infrastructure Design Manual  Proposed Chapter 19 Changes – City Code of Ordinances

Abbreviations  IDM – Infrastructure Design Manual  LID – Low Impact Development  FEMA – Federal Emergency Management Agency  NFIP – National Flood Insurance Program  BFE – Base Flood Elevation

Infrastructure Design Manual (IDM) vs. Code of Ordinances vs. International Building Code  IDM issued by Director of Public Works & Engineering  IDM provides design standards for public infrastructure  Code of Ordinances adopted by City Council to govern City, for example Chapter 19 – Flood Plain Chapter 40 – Streets and Sidewalks Chapter 42 – Subdivisions, Developments & Platting  International Building Code administered by Building Official for private property permitting

2008 Changes to Infrastructure Design Manual  Chapter 9 – Storm Water Design  Chapter 13 – Storm Water Quality Design  Culmination of 1 year of reviews, comments and discussions.  Part of Five Year PWE Technical Review Cycle

Chapter 9 – IDM Storm Water Design Requirement Changes  Allows for consideration of alternative drainage designs for Evacuation Routes and Emergency Services Routes

Chapter 9 – IDM Storm Water Design Requirement Changes  Allows for use of another pipe material, HIGH DENSITY POLYETHYLENE (HDPE) SOLID AND PROFILE WALL PIPE, for storm sewer installations in public right of way.

Storm Water Technical Specifications  Specifications for Backfill for Utility Excavations – Updated Industry References  Specifications for Frames, Grates and Covers – Updated Industry References  Included specifications for HDPE pipe material

Chapter 9 – IDM Storm Water Design Requirement Changes  Requires stormwater detention for INCREASED impervious cover on all sites Less than 1 acre: 0.20 acre-feet per acre Over 1 acre: 0.50 acre-feet per acre Removes 15,000 sf Single Family Residential Exemption for detention of increased impervious cover

Chapter 9 – IDM Storm Water Design Requirement Changes  Changes are now effective October 1, 2008  Designs submitted prior to October 1, 2008 will be approved using current or proposed requirements  Reviewing additional filters/screens for smaller, single family improvements with limited increases in impervious cover

Chapter 9 – IDM Storm Water Design Requirement Changes  Development of series of “how to” documents for various stormwater detention techniques including LID  Goal is not to increase engineering requirements for single family residential property owners  Goal is to address additional stormwater runoff from increasing impervious cover

Chapter 13 – IDM Stormwater Quality Design  Included information for use of Low Impact Development (LID) techniques for stormwater quality/quantity applications  Include: Bioretention, Infiltration Trenches, Porous Pavement, Vegetative Swales, Green Roofs, Hard Roofs, Rain Barrels

Bioretention Basin

Using in-situ or new soils, design the bioretention area to empty within 48 hours. This may be accomplished through infiltration, evapotranspiration, and/or the design of a subsurface drainage system. Mitigating detention volume requirements can be reduced by the volume in the bioretention area below its maximum design water surface.

Porous/Pervious Concrete

 The pavement surface may either be soft (grass) or hard (concrete, asphalt or advance gravel systems). The underlying permeable layer serves as a storage reservoir for runoff and/or infiltration.  Porous Pavement is applicable for both water quality and water quantity control practices.  Shall be limited to lightly traveled surfaces such as parking pads in parking lots, trails and sidewalks.  Porous pavement is not permitted for residential driveways (area of pavement likely to be coated or paved over because of a lack of awareness) and commercial areas designed for heavy traffic volume and/or vehicles.

Infiltration Trenches  Trenches or basins that temporarily detain a design water quality volume while allowing infiltration to occur over a prescribed period of time. Trenches are applicable for both water quality and water quantity control practices.  In-situ subsoil shall have a minimum infiltration rate of 0.5 inches per hour.  Subsurface drainage systems are required where the in- situ subsoil rate is less than 0.5 inches per hour or where the project is constructed on fill soils.  Mitigating detention volume can be reduced by the amount of infiltration into the subsoil and the volume of voids within the trench area.

Dry Swale

Dry Swales  Flow depth should be less than 4 inches for water quality treatment.  Flow velocity should be less than 1 fps for water quality, less than 5 fps for 2-yr storm (non-erosive velocities for grass and soils).  Length should yield a 10 minute residence time.  Side slopes should be flatter than 3:1.  Maximum ponding time should be < 48 hours.  Mow dry swales as required during growing season to maintain grass heights in the 4 to 6 inch range.

Wet Swale

Wet Swales  Flow depth should be less than 4 inches for water quality treatment.  Flow velocity should be less than 1 fps for water quality, less than 5 fps for 2-yr storm (non-erosive velocities for grass and soils).  Length should yield a 10 minute residence time.  Side slopes should be flatter than 3:1.  Maximum ponding time should be < 48 hours.  Wet swales, employing wetland vegetation or other low maintenance ground cover do not require frequent mowing.

Rain Barrel

Rain Barrels  Gutters and downspouts carry water from the rooftops to rain barrels  Rain barrels should be equipped with a drain spigot.  Overflow outlet must be provided to bypass rain barrel from large rainfall events.  Rain barrel must be designed with removable, child resistant covers and mosquito screening.  Empty rain barrel after each rainfall event.  Rain barrel should be inspected annually.

Hard Roofs/Green Roofs Hard Roofs  Detention volume can be controlled in several ways,  Typically, simple drain ring is placed around roof drains.  Flow into the roof drains is controlled by orifices or slits in the drain ring.  The roof deck must be designed to withstand the live load and be properly waterproofed. Green Roofs  A green roof, in simplest terms, is a vegetated roof.  Installation generally consists of a waterproof membrane installed over a suitably constructed roof deck.

Chapter 19 – Floodplains City of Houston Code of Ordinances  Implemented for participation by City of Houston in National Flood Insurance Program (NFIP)  Floodplain studies managed by Harris County Flood Control District  Floodplain maps prepared and issued by Federal Emergency Management Agency (FEMA)  In effect since 1985 with revisions in 2006

Project Location and the SFHA Address/Property Location Tools for determining location in the SFHA zone:  View/viewer.htm  er1.htm  Call the Floodplain Management Office at  Value of Proposed Improvements  Market Value of Structure before Improvements WHAT DO YOU NEED?

Basic Floodplain Requirements  Basic Permit Requirements  Floodplain Fill Mitigation Plans  Conveyance Zone Requirements  Floodway Requirements  Variance Requirements

Basic Development Permit Application Requirements  New construction, additions, substantial improvements lowest floor/all utilities elevated or floodproofed (non-residential only) ≥ 12 inches above the BFE  Mitigate Loss of Floodplain Storage Volume  Special requirements for projects in floodway and conveyance zones  Development permit expires if development has not commenced within 18 months of issuance

Improvements to Existing Structures  Substantial vs Non-Substantial Single improvement project Value of proposed improvements to market value of structure before improvements Market value by HCAD, RSDE or independent appraiser (Texas Certified)  Substantial means Full Compliance

2008 Revisions to Chapter 19 o Define an area of Lake Houston where boathouses/piers can be permitted without calculation requirements of floodway zone designation o Removes “10-year accumulation of flood related improvements” from definition of “substantial improvement”

 Codifies requirements for permitting of reconstruction, renovation and repairs of existing structures in the floodway.  Currently, requirements are included in the Chapter 19 Guidelines 2008 Revisions to Chapter 19

 Allows for issuance of development permits to vertical construction on vacant land in the floodway.  Establishes performance standards and criteria necessary for compliance to build on vacant land in the floodway 2008 Revisions to Chapter 19

Contact Information Mark L. Loethen, PE City Engineer City of Houston 611 Walker, 19 th Floor Houston, TX City of Houston Floodplain Management Office 3300 Main Houston, TX Duane Hengst, PE Managing Engineer – Floodplain Management Office 3300 Main Street Houston, TX

Questions/Answers