Project By:. 2 Agenda Introduction Problem Definition Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software Requirements.

Slides:



Advertisements
Similar presentations
--- IT Acumens. COMIT Acumens. COM SNMP Project. AIM The aim of our project is to monitor and manage the performance of a network. The aim of our project.
Advertisements

WEB AND WIRELESS AUTOMATION connecting people and processes InduSoft Web Solution Welcome.
Galileo Integrated Data Source ( Galileo IDS or GIDS) November 2007.
Yummy. Introduction A WAP-based restaurant finder For client Search by Keyword and Category Mobile Booking System Colorful Map and Coupon For restaurant.
Traffic Manager is a flexible and powerful solution of Traffic and Billing System for radio stations. It also Provides flexible Rate card and Automatic.
Project Supervisor: Dr. Sanath Jayasena Project Coordinator: Mr. Shantha Fernando Athukorala A.U.B Dissanayake C.P. Kumara M.G.C.P. Priyadarshana G.V.J.
Adding SMS functionality to WhatsUp Gold
WEB USAGE MINING FRAMEWORK FOR MINING EVOLVING USER PROFILES IN DYNAMIC WEBSITE DONE BY: AYESHA NUSRATH 07L51A0517 FIRDOUSE AFREEN 07L51A0522.
Lecture 2: Servers and Services Network Design & Administration.
©Centre for Development of Advanced Computing 1 State e-governance Service Delivery Gateway (SSDG)‏ A Messaging Middleware for.
Bonrix WebSMS Enterprise Edition (A Web Based Application) Bonrix Software Systems
DREAM DARE DELIVER. SMART MOBILE TICKETING LOCAL TRAIN BOOKING SYSTEM THROUGH MOBILE APPLICATION Travel made easy.
Idea Execution Document for Making the Elevator Pitch
A Cellular Fare Collection System for Suburban Railways in India Pratik Kotkar, Kumar Mayank, Suyog Deshpande Indian Institute of Technology Guwahati.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to SysAid.
Take advantage of the SMS technology in your organization today!
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to Sharepoint.
FTP. SMS based FTP Introduction Existing System Proposed Solution Block Diagram Hardware and Software Features Benefits Future Scope Conclusion.
Online Job Portal with Exam
Chapter 1 Introduction Outstanding Features About This Book 1. A novel writing style is adopted to try to attract students’ or beginning programmers’ interesting.
ABSTRACT Before the evolution of computers, all the details in a banking systems used to be maintained manually. This is not advisable because maintenance.
Acceleratio Ltd. is a software development company based in Zagreb, Croatia, founded in We create innovative software solutions for SharePoint,
6/1/2001 Supplementing Aleph Reports Using The Crystal Reports Web Component Server Presented by Bob Gerrity Head.
Ihr Logo Data Explorer - A data profiling tool. Your Logo Agenda  Introduction  Existing System  Limitations of Existing System  Proposed Solution.
Project By:. 2 Agenda Introduction Problem Definition Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software Requirements.
Credit Card Fraud Detection
Global File Reader. Agenda Introduction Current Scenario Proposed Solution Block Diagram Technical Implementation Hardware & Software Requirements Benefits.
Group Members: Group Members:.  Introduction  Current Scenario  Proposed Solution  Block Diagram  Technical Implementation  Hardware & Software.
TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY
LOGO Server. Contents Introduction 1 Problem Definition 2 Proposed Solution 3 Architecture Diagram 4 Server Technology 5 Hardware and Software.
SMS to Converter - A new approach to send .
CS480 Computer Science Seminar Introduction to Microsoft Solutions Framework (MSF)
Group Members:  Group Members: . A GENDA Overview Current Scenario Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software.
EZee iCafe System. Contents Introduction Current Scenario Proposed Solution Architecture / Block Diagram Hardware / Software Requirements Features Benefits.
Network Monitoring Through Mobile (MOBTOP) Developed By : Akanksha Jain. (102199) Deepika Reddy (102210) Team Name: Beans Guided By: Prof. Robert Zhu SUBMITTED.
Overview Computer Training: Custom Training At Business Location At Training Center General Enrollment Computer Classes Available to Businesses and Individuals.
Quality Computer Training. Overview Computer Training: Computer Training: Custom Training Custom Training At Business Location At Business Location At.
Middleware for FIs Apeego House 4B, Tardeo Rd. Mumbai Tel: Fax:
Contents Introduction Problem Definition Proposed Solution
Sale system Expected system: Web-base, Software Application, 2 tiers Application – data, Stand alone database for client, Database engine for Server, Client.
University of Palestine Faculty of Engineering and Urban planning Software Engineering department Software Engineering Group Project Design Document for.
Agenda Introduction Current Scenario Proposed Solution Block Diagram Technical Implementation Hardware & Software Requirements Benefits / Advantages Features.
Member 1Member 2Member 3Member 4. Agenda Introduction Current Scenario Proposed Solution Block Diagram Technical Implementation Hardware & Software Requirements.
Group Members: Group Members:. Agenda  Introduction  Current Scenario  Proposed Solution  Block Diagram  Technical Implementation  Hardware & Software.
Re- Evaluation System Marks Marks Re-Evaluation System.
Customer Identification system based on Smart Card for PDA shops.
LOGO Intellisense Notepad Member 1 Member 2 Member 3 Member 4.
VIGNAN'S NIRULA INSTITUTE OF TECHNOLOGY & SCIENCE FOR WOMEN TOOLS LINKS PRESENTED BY 1.P.NAVEENA09NN1A A.SOUJANYA09NN1A R.PRASANNA09NN1A1251.
I NTRODUCTION TO N ETWORK A DMINISTRATION. W HAT IS A N ETWORK ? A network is a group of computers connected to each other to share information. Networks.
Introduction TO Network Administration
I NTRODUCTION TO N ETWORK A DMINISTRATION. W HAT IS A N ETWORK ? A network is a group of computers connected to each other to share information. Networks.
ANA Custom Websites & Software Solutions Presented by : Naineesh Burde Akshay Anaokar Rehan Ahmed.
Personal Expense Tracker Ajmera Aneri S. ( ) Developed At : Developed By :
SharePoint Saturday SharePoint 2010 BI Insights Saturday, 16 th October, 2010 MIC - Kuwait.
BLOOD BANK MANAGEMENT SYSTEM I.MOHAMMED IRFAHN ( ) A.ARUN CHARLES ( ) S.JAYA PRAKASH ( ) S.KARTHIK( ) M. ARAVINDA DE SILVA.
APARTMENT MAINTENANCE SYSTEM M.Tech( Ph.D) HOD of C.S.E & I.T Dept.
Online School Management System Supervisor Name: Ashraful Islam Juwel Lecturer of Asian University of Bangladesh Submitted By: Bikash Chandra SutrodhorID.
GOVT. ENGINEERING COLLEGE, AJMER PRESENTATION ON GUIDED BY: MR. SANJAY SINGH PRSENTED BY: CHANDRASHEKHAR GARG KIRTI KUMAR VALIYA VIJAY SHARMA.
UNIVERSITY MANAGEMENT SYSTEM
Speed Cash System. Purpose of the Project  online Banking Transaction Information.  keeping in view of the distributed client server computing technology,
GEMTEK Management Center
Lecturer: Dr. Koh Ean Teng
Quality Computer Training
ROBUST FACE NAME GRAPH MATCHING FOR MOVIE CHARACTER IDENTIFICATION
APARTMENT MAINTENANCE SYSTEM
Introduction to Enterprise Systems
Introduction to Databases Transparencies
Cloud computing mechanisms
Healthcare Technology Management Solution
Saranya Sriram Developer Evangelist | Microsoft
Presentation transcript:

Project By:

2 Agenda Introduction Problem Definition Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software Requirements Features Benefits Application Future Enhancement

Introduction  Mumbai Suburban Railway (MSR) carries about 7.24 million passengers daily.  The existing ticketing system is causing a considerable increase in the travel time due to a major drawback- “long queues ‟, which absorbs a significant portion of the travelling time.  On an average, a commuter spends around 15 minutes in the queue at the suburban booking office windows of Mumbai.  ATVMs (Automatic Ticket Vending Machines) and (CVM) Coupon Validating Machines; technologies are already implemented in the Mumbai Suburban Railways. 3

Existing System (1/3)  On 10th October, 2007, “ATVM (Automatic Ticket Vending Machine) ‟ technology was introduced in the Mumbai Suburban Railway in order to curb the long queues for tickets.  The major drawback with the existing ATVM is the scalability issue. Only 6-7 tickets can be issued per minute through a ATVM.  Another major issue with this system is the cost of installing the machine. Each machine costs around 175,000 INR excluding the maintenance costs which vary according to the usage intensity.  Another issue is that there are various public grievances reported regarding the functioning of the ATVM. Instead of hopping from machine to platform, passengers have to hop from one machine to another as most are non-functional. 4

Existing System (2/3)  Another major issue is that each machine occupies 2m x 3m x 3m which is a major concern in existing densely populated railway stations of Mumbai.  Also ATVM is not eco-friendly as it issues “paper” ticket. Around 100 meters of paper per 2000 tickets are used. Nearly tickets in WR and 110,000 tickets in CR are issued per day through the machine. 5

Existing System (3/3)  Another technology currently under use is the CVM (Coupon Validating Machine). CR has 343 CVMs while WR has 230 CVMs and it issues around 100,000 tickets per day in WR and 291,000 in CR.  Major drawback with this system is that fraudulent coupons can be pushed into circulation as CVM network is not linked with Centre for Railway Information System (CRIS) operated unreserved ticketing system that accounts for all the transaction done through booking windows and ATVMs. 6

Proposed Solution  Keeping all the problems discussed in mind, we decided to go one step further by having a system where the suburban ticket will be in the form of SMS.  The aim of our project is to ease the suburban ticket issuing system. This will help people to easily book the suburban tickets without any problems.  With “M-Suburban Train Ticket System ‟, any number of tickets can be issued as it involves use of commuter’s computer and mobile phones for booking and issuing a ticket.  With M-Suburban Train Ticket System the cost of hardware only includes installation of gateways and server. 7

Implementation (1/2)  M-Suburban Train Ticket System basically is structured in the form of two modules which can be broadly categorized in the following: –Role of Commuter –Role of MSTTS (M-Suburban Train Ticket System) 8

Implementation (2/2)  Role of Commuter Need to create an account Refill account with appropriate amount Ticket can be booked through SMS or Web application  Role of MSTTS Will have central database storing all the information Accepts the incoming request for Ticket Process the request and sends the SMS 9

Architecture Diagram 10

Technology Front End ASP. Net C# Back End MS Access SQL SMS AT Commands 11

Hardware / Software Details  Hardware  Software 12 Pentium Dual Core or above Processor 1 GB RAM20GB HDDGSM Modem Windows XP/ Windows Vista / Windows 7.NET Framework 3.5 Microsoft Visual Studio 2008 Nokia PC Suite

Features Book ticket for Mumbai Suburban Trains (Western, Central, Harbour)Web based applicationEasy to use interfaceTicket through SMSBook ticket in less than a minuteTrain timings info 13

Benefits Cost EffectivenessEco FriendlyEasy to use interfaceTicket through SMSBook ticket in less than a minute 14

15 Applications Train Ticket BookingsBus Ticket Bookings