International Equipment Reliability Index (I-ERI) Subcommittee Update

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

SIM Delivery System Reform Status FFY Q1, SIM Delivery System Reform Driven by Maine Quality Counts Overall Delivery System Reform Status:Green.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
January 24, SA12-PE-04 Purpose and Scope The purpose of this self assessment is to conduct a multi-discipline team review (deep dive) of the Feedwater.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
TASK PACKAGING Module 1 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair.
1 Supporting materials for RMS Recommendations for improvements from EDIM team (ESI ID Data Integrity Management team)
The Reactor Oversight Process: Development and Results Tom Houghton Nuclear Energy Institute September 20, 2005.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Presentation EMAL Equipment Status Dashboard. 1.User has to type HOURS UNPLANNED DOWNTIME and the %OA as per the formula agreed (next slide). The spreadsheet.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
CCSSO Task Force Recommendations on Educator Preparation Idaho State Department of Education December 14, 2013 Webinar.
Network Reliability and Interoperability Council Focus Group 3 April 14, 1999 Ray Albers- Bell Atlantic Focus Group III Chair.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
Where Module 04 : Knowing Where the Project Is 1.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
March 24, 2015 New York Hospital Queens DSRIP PPS PAC Meeting.
Air Pollution Control Program Regulation Update Presented to City Council Public Safety and Health Subcommittee Mamie Colburn, M.S, R.S. Missoula.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Role of Advisory Groups David Markwell Head of Education E-Learning Advisory Group meeting
Bow Basin Watershed Management Plan Revised Terms of Reference
Recommendation of Texas Test Plan Team to RMS
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
DROPS Focus Groups Human Factors
Status of the Planning Working Group’s (PWG) Efforts
DCPP Performance Based on NRC Performance Indicators
2012 Operating Experience for Feedwater and Related Systems
International Equipment Reliability Working Group Performance Monitoring sub-group Update from Suzhou meeting 12th-13th Sep 2017.
Industry Guidance on Part 21 Evaluation and Reporting
International Equipment Reliability Working Group AP-913 Harmonisation sub-group Update from Suzhou meeting 12th-13th Sep 2017.
International Equipment Reliability Working Group AP-913 Harmonisation sub-group Update from Prague meeting 4th-5th Apr 2017.
Committee on Earth Observation Satellites
Change Assurance Dashboard
Configuration Control and the Standard Nuclear Performance Model
Amendment Invoice Task Force Progress Report
Exit Capacity Substitution and Revision
Amendment Invoice Task Force Progress Report
Release 3 Scope & Proposed Plan
Pancreas Transplantation Committee
Potential Minor Release Drop 4 Timeline & Scope
Inputs Regard to “Test Phase” to TFCS
DS407 CRITICALITY SAFETY 20th TRANSSC - Agenda Item 4.11
Transport Safety Standards Committee 38th Meeting
Presentation transcript:

International Equipment Reliability Index (I-ERI) Subcommittee Update International ERWG Subcommittee April 2015

I-ERI Subcommittee Team James Purss (EDF-Energy UK) Chair Ted Broadbent - (EDF-Energy UK) Acting Chair / Lead Patrick Ryckaert (Electrabel - Belgium) Miroslav Zelenay (ENEL – Slovakia) Fernando Mirallas (ANAV (Vandellos) Lubos Cvrcek (CEZ – Czech Republic) Sheng Zhang (CGN (Suzhou Nuclear Power Research Institute) Mark White (INPO – USA) I-ERI Subcommittee Team

I-ERI Subcommittee Status @ Oct 14 Reviewed the US ERI Revision 10 (including previous and proposed future revisions) Discussed as a diverse group, which sub-indicators would be of value for the IERWG to use as an indicator Put them in Four Categories – Accept as is (Green) Accept with minor differences (White) Accept with major differences and further review (Yellow) Remove completely (Red) I-ERI Subcommittee Status @ Oct 14

US ERI Revision 10 Sub-indicator Review ERI Sub-Indicators No. Data Type Notes Forced Loss Rate (INPO Definition – 18/24 month Running Average) 1.1 Lagging Use WANO Definition of Forced Loss Rate (will include 12 month Fueling Cycles) Unplanned Power Reductions per 7000 hrs Critical (NRC Indicator) 1.2 Remove – This is a US NRC performance indicator Quarterly Forced Loss Events 1.3 Keep as is Unplanned Shutdown LCO Entries (in Last 3 months) 2.1 Only include ≤ 72 LCO entries caused by equipment failures (prev and future ERI rev) Operator Work Arounds 2.2 Consequential Failure Events (No. Events in Last 3 months) 2.3 Mitigating System Failure Margin (MSPI) 3.1 Use old ERI revision – WANO safety system unavailability indicators System Health Improvement Effectiveness 3.2 Leading Review what is best for the IERWG Corrective Critical Work Backlog (Non-Outage) 4.1 Combine with Deficient, include Outage work? Deficient Critical Work Backlog (Non-Outage) 4.2 Combine with corrective, include Outage? Deferral of Critical PM’s (Outage and Non-Outage) 4.3 Timely Completion of PM’s (1st Half of Grace) 4.4 Work Week Scope Survival (Average of Last 3 months) 5.1 Critical Only - combine with schedule completion Work Week Schedule Completion (Average of Last 3 months) 5.2 Critical Only - combine with scope survival Long Range Plan Implementation Effectiveness 6.1 Age of Red & Yellow Systems 6.2 Older than a cycle (allow 12 month cycles) Chemistry Effectiveness 7.1 Use WANO Chemistry Indicator PM Change Backlog (AP-913 Critical and Non-Critical > 60 Days) 8.1 Use old ERI revision of % of PM Feedback US ERI Revision 10 Sub-indicator Review

Path Forward Agreed @ Oct 14 Share with full IERWG group, subcommittee suggestions and receive feedback Create a IERWG guidance document for IERWG approval in April Meeting Pilot the I-ERI to determine were the point thresholds should be to adequately measure, compare performance, and drive equipment reliability improvements Path Forward Agreed @ Oct 14

Progress since Oct 14 meeting Creation of a draft I-ERI guidance document complete Sharing of guidance document with sub-committee members for review and approval Items not completed Resolution of all sub-measures for inclusion within I-ERI hence document is not ready for approval Point thresholds have not been adequately trialed to measure, compare performance, and drive equipment reliability improvements Progress since Oct 14 meeting

Adopt phased approach to producing an approved I-ERI measure over the next 12 month period Phase 1 – focus on established and agreed sub-measures Forced Loss Rate (WANO definition) Unplanned Automatic Scrams per 7,000 Hours Critical (WANO UA7) Unplanned Shutdown LCO Entries ≤ 72 hours (in last 3 months) Safety System Unavailability (WANO indicator) Work Week Critical Scope Survival and Completion Chemistry Performance (WANO CPI) Phase 2 – focus on sub-measures with minor changes required Phase 3 – completion of sub-measures with major differences with potential incorporation of INPO ERI revision 11 successes – such as Unmitigated SPVs or Maintenance Rework Index. Proposed forward path

Proposed action timeline Phase 3 Full Deployment December 2016 (4.1, 4.2, 5.2, 6.1) + 22 points = 100 / 100 points Sept 16 I-ERWG Presentation and approval of phase three analysis Phase 2 results published Mid-2016 (1.3, 2.2, 2.3, 3.2, 4.3, 4.4, 4.5, 6.2) + 45 points = 78 / 100 points Apr 16 I-ERWG Presentation and approval of phase two analysis Phase 1 results published January 2016 (ERI sub-measures 1.1, 1.2, 2.1, 3.1, 5.1, 7.1) 33 / 100 points Sept 15 I-ERWG Presentation and approval of phase one analysis 8 I-ERWG Sub-committee, Nuclear Generation, NOT PROTECTIVELY MARKED

Questions?