PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.

Slides:



Advertisements
Similar presentations
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
Advertisements

Common Customer Issue: I2C Cable Glitches
B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana BARC-TIFR INO meeting, TIFR, Mumbai November 9,
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Electronics. Solid snap together electronic connectors.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Glenair Micro-D Connectors: New Product Offerings.
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
Soldering Jumper Wires SPIRIT Strip about ¼” of insulation Apply solder until wire appears soli d “Tin” the wire.
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
PACS IIDR 01/02 Mar 2001 PACS Mirror Specification1 Mirror Specification D. Kampf KAYSER-THREDE.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Bringing Gigabit Ethernet to the Masses Supervisor: Dr. Martin.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
INSTALLATION. PURPOSE To learn the basic steps of installing DS200 systems.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
1 / 13 05/2002 Electrical/Component Testing. 2 / 13 V + – H Menus (wiggle test) Connector check Harness (visual) Harness check (supplies and ground) Component.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Installation Guide for AC-1000RF & SA V1.6 Installation Guide for AC-1000RF & SA V1.6 Version Eng1.10 Jul., Union Community Co., Ltd.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Long distance cable ( ) –Double DB9-to-DB9 cable (2x10 shielded twisted pair cable) SCEM –AWG28, Impedance 113 Ω –9.6 CHF/m.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
HF-Protection of Electronic Circuits Thomas Losert.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Skip 6 positions from the high end. Locate Pin #1 Crimp the cable with one end extending 9 1/2” to the left and 4” to the right. Separate the wires in.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
Mauro Citterio - Mi meeting
This picture shows what the wiring of a new alternator looks like
Meeting on Services and Power Supplies
Mediabridge cables at mediabridgeproducts.com
HVI HIPOT TEST SET Pft sERIES.
Visual Instructions.
HCAL HV splice box.
Differential Signal Path for 64 ch ZTF Mosaic
Twinax A Twinax is a dual coaxial cable with a common shield (“Extension” of TWP). 3 custom prototypes were produced for R&D purposes. Currently Cu wire.
After service guide for changing PCB
Presentation transcript:

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board2 FPU Harness Diagram

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board3 Specification Harness AWG 28 twisted shielded Copper wire, insulator PTFE Redundant cables in different cable bundle Connectors without gasket MDM connectors supplying power have pin contacts

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board4 Harness Status Design finished (except pin assignment) Measurements of IR-Transmission of Insulation and Potting Material of ITT CANNON MDM connectors Length of harness not defined yet

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board5 IR-Transmission Measurement ITT Cannon MDM connectors Insulation old Potting Material Insulation new

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board6 IR-Transmission Measurements GLENAIR and MALCO Connectors Potting Material MALCO Potting Material GLENAIR Insulation Material MALCO

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board7 Connector Set-up Potting Material –Female: 0.7 mm –Male:0.7 mm Isolation Material –Female:1.7 mm mm ( gap 0.13 mm 2 / pin) –Male:1.7 mm mm ( gap 0.13 mm 2 / pin)

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board8 ITT CANNON MDM Connector

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board9 ITT CANNON MDM Connector (old) Insulator 51 pin old material Socket (wall removed) Insulator Gap Pin

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board10 ITT CANNON MDM Connector Transmission for new ITT Cannon design, two connectors (seems to be acceptable)

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board11 FPU Distribution Board 2 Electronic Boards First Electronic Board, Detector side: –25 x 31 pins MDM Connectors for Detectors –1 x MDM 9 pins Connector for Heaters (only blue Detector) –128 capacitors (WMA MKS2 1MicroF 50V) Second Electronic Board, Connector Bracket side –5 x 31 pins MDM Connectors –4 x 25 pins MDM Connectors

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board12 FPU Distribution Board Flex-wire (165 tracks per flex layer) between both board Flex-wire shielded on both sides 6 to 8 layers per board Shielding layers in between the layers Board and Flex wire material: Polymide

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board13 FPU Distribution Board 130 mm

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board14 Position of Distribution Board for Red Detector

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board15 Position of Distribution Board for Blue Detector

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board16 FPU Distribution Board Open Points Detailed Specification of the Board –Numbers of capacitors –Required separation / distance for noise sensitive lines –Thickness of layers –No triax harness possible on boards and flex cable –Grounding requirements

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board17 Filter Wheel 1, Cable C01

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board18 Filter Wheel 1, Cable C02

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board19 Filter Wheel 2, Cable C03

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board20 Filter Wheel 2, Cable C04

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board21 Calibration Source 1 and 2, Cable C05

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board22 Chopper, Cable C07

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board23 Temperature Sensors 1 and 2, Cable C08

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board24 Temperature Sensors 3 and 4, Cable C06