for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack

Slides:



Advertisements
Similar presentations
Tree Jack Copyright by B&B Oilfield Services, Inc
Advertisements

Frequently requested Parts. Complete Intensifiers As replacements for worn out top works For upgrading of existing intensifiers As exchange top works.
Fundamentals of Pressure Relief Devices
Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Environmental Drilling By: Josh Humphreys October 8,2006.
Wellhead Recovery System The wellhead system that fits the application. (Patent Pending)
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Drilling Engineering – PE311 Circulating System
HYDRAULICS & PNEUMATICS
Evolution Oil Tools Inc. (EOT) was formed in January of 2011 Headquarters in Calgary, Alberta, Canada Manufacturing, Assembly and Testing shops are in.
1Furmanite Confidential - 1/9/04 Pressure Systems Integrity Management.
Trouble Shooting How to Recognize Improper Installation May 2009 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages Tubing.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
Northwest Copper Works, Inc. Disc Spring Technology, LLC – Presentation DST Members: Bart Makadia, P.E. James Taylor Klaus Redmann Portland, Or August.
Underbalance Drilling
"AIR COOLER" Heat Exchanger
GL 18-3/4” 5,000 psi Annular Blowout Preventer
5/20/20151 TORUS ANNULAR BLOWOUT PREVENTER. 5/20/20152 Design Criteria The Torus Annular Blowout Preventer is Designed To Close Around Different Sizes.
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
BASIC MUD LOGGING.
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
STEAM HEATING.
Petroleum Engineering 406 Floating Drilling
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.
“ Where SERVICE is everything, but SAFETY is first ”
Floating Head Heat Exchanger
Features & Benefits The Ultimate Contamination Control Tool Quick Installation & Ease of Usage Eliminate Hydraulic Oil Spills & Clean up Industry Acclaimed.
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
MECH1200 SEALS, GASKETS & SEALANTS. MECH1200 WHAT CAUSES LEAKS Causes of leakage –Worn or damaged seals –Worn or damaged gaskets –Worn or bent parts or.
PAL PLUNGERS® BY PAL PLUNGERS, LLC.
USA ZAMA BASIC BIS. USA ZAMA What is BIS ?  What does BIS mean? – BIS is an acronym for B alanced I dle S ystem – The BIS system is part of the idle.
“Fix Tube Sheet” Heat Exchanger
Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.
Petroleum Engineering 406 Floating Drilling
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent.
AQUAGUARD Keeping drillers out of hot water Case Study.
Trouble Shooting How to Recognize Improper Installations January 2013 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages 1 -
International Perforating Symposium (IPS) 2016 Mitigating the Problems in Select-Fire Perforating Operations.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Contents Click a Section Tab.
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
REDA Production Systems
Valves.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Line Blinding/Blanking Options
Oil-Field Hydraulics Chapter 2 Production Equipment
Air Pak Drying Systems Presented By: Dry Air Systems, Inc. Innovator of Unique Regenerative Desiccant Air Dryers For Compressed Air & Fluid Power Controls,
Engine Lubrication Systems
CASING.
Optimum Pump Performance for Process Applications
Using an Inflatable Element
MAGM 262 Hydraulic Seals Mr. Conrado.
HYDRAULICS & PNEUMATICS
Engine Lubrication Systems
774X 21/2”, 6”, 8”.
SB Packing Automatic Downpuller Power Unit
Ram Blowout Preventers
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Welcome! Drafting 2323: Pipe Drafting
Floating Head Heat Exchanger
e-UBDTM Operations by ABEL Engineering/Well Control Co.
Industry leading completions execution and service quality
Presentation transcript:

for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack The Tomcat Tool for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack

What does it do? Crosses over large BOP to small bore for wireline, coil tubing, snubbing or pumping Rig up and rig down time is minutes Achieves full working pressure of the annular preventer

Benefits? Has a full working pressure primary seal A full working pressure back up secondary mechanical flow barrier Enhances safety for the crew and operation Saves time and money

What is it? Two (2) pieces: - shooting nipple - hold down flange

Initial rig up of Hold down Flange Install the hold down flange with the stack with standard studs Test flange with the stack (e.g., upper BOP) Full bore for drilling operations

How does HPSN rig up? When you need small bore BOPs install the HP Shooting Nipple (HPSN) to hold down flange Installs with acme threads (12 turns at low torque)

How does it work? Upward or downward forces are supported by the flange Primary seal is annular element Secondary seal is lip seal

Hold-down flange assembly Forces absorbed by threads Pressure is sealed by lip seal and ring gasket

What is it good for? WL work on drilling stacks Coil tubing on drilling stacks Snubbing operations Pumping operations

What are the advantages? Saves lots of time and costs Operations are safer for personnel and rig Reduces climbing to install conventional systems System is properly pressure tested

Cost advantage? Conventional method with a requires removal and reinstallation of bell nipple and a crossover = 10 hrs Tomcat Tool = 1 hour Savings 9 hours per run At $1500/hr for rig time savings = $13,500 per run (before rental costs)

Testing Detail? 1) Install flange 2) Install bell nipple 3) Run test plug in wellhead 4) Run flange test plug 5) Pressure test whole system (which pressure tests cap and upper ring gasket seal)

Test integrity? Upper ring gasket is tested Lip seal in annular cap is tested Tomcat system is full rating of the annular BOP Has secondary seal not provided in conventional system

Proto type test Upper ring gasket is tested Test plug Upper ring gasket is tested Lip seal in annular cap is tested Tomcat system is full rating of the annular BOP Has secondary seal not provided in conventional system Hold-down flange 10m test

Normal Operations Full working bore Thread is protected Seal area is protected Protector is removable

Design loads 11” 5m version Thread 1130kip Studs 2000kip HPSN connections in body 2000kip tension or compression HPSN body 2000kips tension 500kips compression Burst 14,000 psi WP = 5,000 psi Test pressure 10,000 psi Lip seal WP = 5,000 Test 10,000 psi

Specifications SF according to AISC Mgf by API 6A PSL-3 H2S spec to NACE MR-01-75 Materials ASTM 4130 22 Rockwell C hardness Welding according to AWA All outlets flanges to API 6A PSL-3 Material traceability and accountability Protected under USA Patent law (use and equipment.

Features Forces (up/down) are supported fully Two (2) flow barriers Quick and efficient rig up and rig down Tests the upper BOP section (not done normally) Flange is full bore when not in use BOP is fully functional (can close blind)

Risk Reduction Indonesian blowout during logging 2001 Cost of control $44m Loss of one year of drilling

Wireline Blowout

Total Parts Required

R-BOP + Tomcat Tool Bell nipple is a R-BOP housing If well is unstable run R-BOP assembly Drill ahead at balance

R-BOP that will match up with HPSN system Star Rotating Head Rotating head system WP = 1000 psi Test 2000 psi No lubrication system required

TomCat Tool Patented Process The TomCat Tool TM has U.S. Patents awarded for “High Pressure Adaptor Assembly for use on Blow Out Preventers” and “Method for Rapid Installation of a Smaller Diameter Pressure Control Device Usable on Blow Out Preventers”. U.S. Patent Number 7,267,179 U.S. Patent Number 7,334,634 U.S. Patent Number 7,383,887 U.S. Patent Number 7,464,751

Contacts ABEL Engineering/Well Control Co. Houston, Texas USA L. William "Bill" Abel PE President Office: +1-713-355-3838 Fax: +1-713-355-438 Cell: +1-713-204-0294 Email: billabel@aol.com Worldwide GSM: +1-713-204-0294 Web: www.abel-engr.com Skype name: BillAbel_ABEL_Engineering Skype-In Tele: (rings direct to Bill's PC) +1-713-893-3367 Mailing: 2907 West Lane Dr. Houston, Texas 77027 Office: 4740 Ingersoll Suite 102