G.Barber Tracker Planning & Mechanical Preparation June 2009 1 Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Cap Sewing with HCS-1201 Voyager
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Installation. Indoor Unit Installation Typical Installation.
MU 7 Mak Fu Shun Kong Yau Choi Lee Man Kit Poon San On Zen YKK Project: Automatic adhesive machine.
MyLock 644D Service Seminar.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
G.Barber Mice Tracker Integration Jun Tracker integration.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Mitsubishi RA90 4 axis Wire EDM
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Installation. Indoor Unit Installation Typical Installation.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
LINEAR MEASUREMENT.
Installation. Indoor Unit Installation Typical Installation.
Election Commission of India
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
General Instructions for “KidWind Light” wind tunnel.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Main Parts of a Drilling Machine
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
Drilling Machine… MATROJA PRITENDRASINH K. GUIDED BY: PROF.N.K.PRAJAPATI BE SEM 3 RD MECHANICAL SUB:MP I.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Fixture.
UNIT-I SLOTTING MACHINES
Helium Balloon for the SHIP Decay Volume
LumiCal mechanical design, integration with LDC and laser alignment
2.2 Gallon TourTank Installation
Presentation transcript:

G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried out to integrate the trackers into the MICE experiment Alignment of the Tracker into the Solenoid bore Fitting of the Hall probes Replacement of known ‘BAD’ light guides Trial assembly of the blackout tent in the available space Assembly of the fibre support trellis Gas system Helium Window

G.Barber Tracker Planning & Mechanical Preparation June Tracker Alignment into Mice An outline into the procedure for aligning the fibre trackers into the Spectrometer Solenoids in the Mice experiment

G.Barber Tracker Planning & Mechanical Preparation June Carbon Fibre Stations The carbon fibre stations are key to the alignment, they have all been machined on a CNC. The planes were added using this machined accuracy therefore we know the mean axis of the tracker with relation to points on these stations

G.Barber Tracker Planning & Mechanical Preparation June Tracker Support Feet The tracker is supported at 4 points in the bore of the solenoid, these 4 points are adjustable using eccentric cams to give the required position. Support Points Adjustable Cam Mounts

G.Barber Tracker Planning & Mechanical Preparation June X & Y Alignment Tool Knowing that the stations are accurately machined means we can use this to set the position of the tracker inside the bore of the solenoid. To do this we make a replica of the bottom half of the station, this includes the mounting positions. It has a Ø2mm hole at the known centre of the stations which can be surveyed. The alignment tool has similar adjustable cams to allow the Ø2mm hole (centre of station) to be positioned on the beam line axis. This is done at both support positions along the solenoid bore as the bore concentricity is not guaranteed. Once this is done and because the tool is an exact copy of the station profile a measurement can be taken of the distance between the cam edge that the tool sits on and the profile. This measurement is duplicated on the actual station and when pushed into the solenoid to the correct position the tracker will be on axis. Cams sit on Bore Wall 3 rd Steady Measurement to Replicate Adjustment Ø2mm Hole (Center of Station)

G.Barber Tracker Planning & Mechanical Preparation June Phi and Z Alignment The phi and Z alignment relies on a hemispherical bracket on the tracker being pulled into a Vee block that is mounted and fixed from the patch panel. This block needs to be aligned then doweled, Z is just a straight measurement but phi will need to be surveyed. To do this a bar with Ø2mm hole is held in the Vee block as the diagram shows. The alignment bar is pulled into the Vee Hemisphere Bracket pulled into Vee to locate tracker This end of the bracket is fixed and doweled to the patch panel after alignment Ø2mm Hole

G.Barber Tracker Planning & Mechanical Preparation June Fitting of the Hall Probes There are a series of hall probes installed into the bore of the solenoid. The positions are yet to be defined but at least two are on the bore, fitted to collars and the remainder are fitted to brackets attached to the tracker space frame. Hall Probe support plate (G10) W Section to strengthen bond to space frame Collar to attach the Hall Probes into the bore of the solenoid. These are removable to allow the tracker to be withdrawn The connections to the outside world are via a connector block that fits into the 26 th position in the patch panel.

G.Barber Tracker Planning & Mechanical Preparation June Replacement of the ‘BAD’ Waveguides Perhaps ‘BAD’ is to strong a word but during the assembly for the cosmic ray testing it was noticed that 2 of the internal waveguides were damaged. Both were on the same assembly and as we have a spare waveguide it should be a simple matter to replace it. The bad channels are Station 15-connector C28-Fibres 21 & 22

G.Barber Tracker Planning & Mechanical Preparation June Trial Assembly of the Blackout Tent As the layout in the hall has evolved it is apparent that the existing tent (6M x 3M with a 1.5M x 1.5M entrance porch) will not be a comfortable fit. What I am proposing is to erect the tent in situ during a suitable time slot. This will enable us to make any modifications needed. We may need to include and seal cut-outs for trunking, racks etc and emergency routes will need to be considered. 2.5M

G.Barber Tracker Planning & Mechanical Preparation June Assembly of the Fibre Support Trellis Due to the unpredictable ‘lay’ of the external waveguides and changes to the height of the cassettes, the trellis that supports the waveguides is likely to need modifying to suit. As it is constructed from Minitec section (big boys Meccano) this is easy to do. The protection covers will be fabricated from mesh so this again can be manufactured in situ.

G.Barber Tracker Planning & Mechanical Preparation June Helium Gas System There is a need to lower the Xo in the tracker volume and so the air will be replaced with helium. As the volume will not be gas tight due to the nature of the connectors it will be necessary to bubble the helium at a low rate. At this rate it would take a while to purge the air from the system so we use a two setting system. Using standard air valve that are linked mechanically we can purge at a much higher flow rate and then switch to the run flow rate. The mechanical link ensures that both input and output switch at the same time.

G.Barber Tracker Planning & Mechanical Preparation June Helium Gas Window The helium window is not yet fully designed, and will need to be FEA ’d as it is a pressure window. It is to be fitted to a set of holes that are the same as the holes that seal the patch panel at the opposite end. It appears that these holes have not been drilled at Wang and will need to be drilled in situ by hand. This can be done using a template that is clamped in place.

G.Barber Tracker Planning & Mechanical Preparation June Conclusions There are still a number of things to do, many of them can be done only after the cosmic ray tests are completed or when the solenoid arrives. It is therefore important to prepare as much as possible, for example mods that may be required to the blackout tent. This may be carried out during a period when the area is less busy.