4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
STFC Technology Helical Undulator Status and 2009 Progress Dr Owen Taylor On behalf of the Helical collaboration Collaboration members ASTEC: J.A. Clarke,
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration Nov 2008.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Quench study Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Amanda Brummitt, Steve Carr, Andrew Lintern, James Rochford STFC Technology RAL HeLiCal.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
BNG Industrial experience on Superconducting Undulators C. Boffo, T. Gehrard, B. Schraut, J. Steinmann, W. Walter, Babcock Noell GmbH T. Baumbach, S. Casalbuoni,
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Magnet designs for Super-FRS and CR
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Big Magnet Design II: a) solenoid and cable concept b) short section test V.V. Kashikhin and A.V. Zlobin.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Helical Undulator Programme J Rochford T Bradshaw On behalf of the HeLiCal collaboration.
LCWS11 WG4 Fully featured accelerating structure engineering design
SPL RF coupler: integration aspects
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
HFM Test Station Main Cryostat
Yury Ivanyushenkov for the UK heLiCal Collaboration
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
LARP Vertical Test Facility
Far Detector Activities Late 2017 – Early 2018
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
iSHELL Design Review Cryostat & Optics Bench
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-1
Alignment of Main Linac Cryomodule (MLC)
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
IR Beam Transport Status
Status of QQXF cryostat
Presentation transcript:

4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration

2 Specification for 4m Undulator Magnet On axis field0.9 T Peak to peak variation<1% Pitch11.5 mm Nominal Current<300 A Nom current as % of Short Sample80% S/C wireNb Tn 0.4mm dia. SC:Cu ratio 0.9:1 Winding Cross Section7 wires wide x 8 high Number of magnets per module2 (powered separately) Length of magnetic field2 x 1.74 m

3 Specification for 4m Undulator Module PoleIron (BS080A15) with a square section groove Beam/winding tubeCopper (6.35od x 0.56wall) with a non polished bore. Beam Stay Clear4mm Diameter Central Beam pipe connection Plain butt joint Beam pipe connection at ends Tapered 1:10 out to 10mm dia No Beam Collimators or Beam Pipe Vacuum pumping ports in the beam pipe

4 4m Module Overview Stainless steel vacuum vessel with Central turret 50K Al Alloy Thermal shield. Supported from He bath Stainless Steel He bath contains100L liq He. Supported by 4 rods attached to the vacuum vessel U Beam used to support/align the magnet. U beam Support rod Magnet cooled to 4.5K by liq He in bath. Beam Tube

5 Magnet Design Concept Mild steel former 1.8 m long machined with 2 start helical groove. Beam pipe (Cu tube) soldered into bore of the former Superconducting ribbon wound on to the copper tube

6 Magnet Design Concept 8 Piece iron yoke. Provides support for the former and increases the magnetic field PC board for S/C ribbon connections Revised Ribbon in/out guides

7 Central Clamp The two magnet assemblies are joined via an Indium seal. This is held together using a 3-way clamp which is assembled before the magnets are installed into the U-beam. To prevent movement of the joint, the 4m magnet assembly is bolted to a handling beam which also ensures correct orientation of the two magnets. Handling beam attached to 4m magnet assembly

8 U-beam layout Exploded View Intermediate adjusters End adjuster Folded U-sections Central clamp adjuster The completed magnet is supported and aligned within a stiff U beam

9 Alignment Once installed into the U-beam the magnet itself can be aligned using the U-beam adjusters. An alignment telescope will be used to look down the bore of the magnet and ensure that it remains coaxial between the two ends within the tolerances set out in the specification. Magnet central clamp Intermediate adjuster with magnet in position. Sliding joint between the yoke and adjuster block to allow for contraction in Z-axis.

10 Cryostat Cross Section Cold bore (Beam tube) He bath. Precooled to 77K via N 2 cooling pipes on OD. Filled with 100L liq He from dewar. Liq He level topped up during operation from He condensing pot in turret. No external cryogens required during operation. 50K Thermal Shield cooled by conduction from cryogenic cooler 1 st stage Vacuum vessel Services turret contains cryogenic cooler, 4 HTC current leads, He / N 2 pipes and Instrumentation

11 Cryogenic Cooler Cryostat Turret Liq He Condensing pot. Cooled to 4.5K from cooler second stage He bath Top plate Instrumentation Lead thro’ 4 off HTC current leads. Cooled to 50K from cooler 1 st stage 36mm dia He vent pipe 50K Thermal shield

12 Support systems Two support System required – 1.U Beam within He bath (Shown) 2.He Bath within vacuum vessel Conceptually the two systems are identical – Adjustable in X and Y to allow the beam pipe to be centred within the vacuum vessel. Fixed at the magnet mid position to allow for thermal contractions of ~6mm at each end.

13 Y Support rods He vessel Mechanical support Vac vessel 50K shield Vac vessel neck tube 50K shield neck tube Vac cover 50K anchor He bath supports shown. U beam supports similar but without thermal intercept. Support rod material will be determined by heat leak and thermal contraction. Carbon fibre Thermal contraction <0.1mm Stain Steel Thermal contraction ~0.6mm

14 X constraint He Bath Vacuum Vessel Tongue and groove system constrains in X but allows thermal contraction in Z. (Similar system for U beam)

15 Beam Tube He Bath Copper insert with tapered bore soldered into iron former as part of the beam tube assembly 10mm bore shielded bellows Vacuum VesselThermal shield with 50 K Thermal Intercept

16 Bellows Bellows design still being worked on, parameters are to – Accommodate thermal contractions of 6mm in Z and up to 0.6mm in Y. Minimise any steps/cavities in the beam pipe. 10mm ID for bellows between magnet former and He bath. Maximise the ID of the bellows between He bath and vacuum vessel

17 Envelopes and Interfaces Overall length of cryostat – 4m Beam pipe vacuum interface - TBD Alignment system – TBD Turret Services interfaces – TBD Beam Height - TBD Vacuum vessel – Girder Interface - TBD