Ranney Collector Construction

Slides:



Advertisements
Similar presentations
Sources of water (RAIN)
Advertisements

CONSTRUCTION DRILLING INC.
V-backed stainless steel screen pump intakes: The following Evolution Oil Tools inc product is a screen assembly to prevent large solids from entering.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid.
Environmental Drilling By: Josh Humphreys October 8,2006.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Parts of typical slab formwork
Ground-Supported Slabs • Exterior Flatwork
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Diaphragm Wall Construction
Reinforced Concrete Flexural Members
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
OSHA Subpart Q Concrete and Masonry Construction.
Open Channel Flow May 14, 2015 . Hydraulic radius Steady-Uniform Flow: Force Balance  W  W sin  xx a b c d Shear force Energy grade line Hydraulic.
COWLITZ FALLS NORTH SHORE COLLECTOR REQUEST FOR QUALIFICATIONS PRE-PROPOSAL MEETING DESIGN REVIEW OCTOBER 9, 2014 Slide 1 October 9, 2014 BY KIRK KESSLER,
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Aqueducts.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Chapter 18 Foundations.
Construction Dewatering
Lecture 11 Advance Design of RC Structure Retaining walls
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
6.4 Arc Length. Length of a Curve in the Plane If y=f(x) s a continuous first derivative on [a,b], the length of the curve from a to b is.
Sources of water (RAIN)
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Wes Marshall, P.E. University of Connecticut March 2007
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
© Irrigation Association Effect of Irrigation. © Irrigation Association Calculate Hydraulic Requirements Chapter 4:
Stormwater Management: TCNJ Townhouses South
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Groundwater Flow to Wells
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Hydraulic Fracturing (Fracking)
Soil mechanics and foundation engineering-III (CE-434)
S.T.B.S. College of Diploma Engineering
Construction Methodology for Suramadu Main Bridge.
Irrigation Systems and Components. Overview Types Layout Components Hydraulics Design Considerations.
Underground Pipelines Module #8 Prepared by Dr. Randy R. Rapp July 2005.
Life Cycle Assessment Assessing local impacts María del Mar Pintor
Ranney Collector Rehabilitation Program
WATER – WASTEWATER TREATMENT EXPERIENCE
IN TAKE WELL.
INTRODUCTION TO TRENCHLESS TECHNOLOGY
What is an on-lot sewage system?
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Water Department has Six Divisions
Arch205 Materials and building construction 1 foundation
Private Septic Systems
Vertical Pressure Filters
Arch205 building construction foundation
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Ramar-Hall Addition: 2017.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Private Septic Systems
Concrete A structural material made by combining cement, sand, aggregate, and water.
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Presentation transcript:

Ranney Collector Construction

Ranney Collector Overview Pump Station Central Reinforced Concrete Caisson Horizontal Well Screens

Collector Well Construction Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

Caisson Construction STEP 1 STEP 2 STEP 3 L1 L1 L2 Grade Grade Grade

Initial Caisson Lift with Cutting Shoe, Toledo Bend Reservoir

Inner and Outer Forms

Caisson Lift with Ports, Lake Havasu City

Clam Shell Excavation, Louisville

Clam Shell Excavation, Lake Havasu City

Floor Reinforcing, Iowa City

Completed Caisson

Collector Well Construction Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

Lateral Projection Grade SWL Caisson Lateral A Lateral B Ports

Hydraulic Jacking Machine

Lateral Projection, Iowa City

TYPICAL BORE PILOT Minimize Friction Remove Material Provide Horizontal Bore

Projection Pipe and Sand Line

Laterals Installation Bore Pilot & Projection Pipe Centered On Port Assembly

Projection Pipe Advancement Lateral Installation Projection Pipe Advancement

Projection Pipe Advancement Lateral Installation Projection Pipe Advancement

Collector Well Construction Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

Screen Installation Grade SWL Caisson Lateral A Lateral B (Wire-Wrap Screen) (Wire-Wrap Screen)

Wire-Wrapped Screen

Wire-Wrapped Screen

Development By Overpumping Q Grade SWL Caisson Pump Laterals

Development By Surging

Sand Content Measurement

Collector Well Construction Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing

Performance Testing, Sonoma County

Top Slab Installation

Conceptual Design and Yield Ranney Collector Conceptual Design and Yield

Equations to Quantify Yield

Input Parameters / Design Assumptions T = 482,600 gpd/ft S = 0.313 K = 5602 gpd/ft sq B = 86 feet A = 700 feet Zi = 75 feet Laterals – 10 to 12 Lateral Radius – 0.5 ft Lateral Length – 200 ft Caisson Radius – 8 ft Pumping Level – 15 ft above laterals

Conceptual Design

Yield With Recharge

Yield Without Recharge

Characteristics of Ranney System $12.6 to $16.0 million for Total System 100% of Construction and Maintenance On Shore Yield Remains High When River Migrates Pilot Testing to Confirm Yield