Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Accuracy of CV determination systems for calculation of FWACV Dave Lander.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Accuracy of CV determination systems for calculation of FWACV Dave Lander Update 12 th October 2011.
Automotive Test & Measurement Case Studies SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Management Platforms. SMFA In TMN the intent is to define a realitivly common set of what can be supported by CMISE network elements and managed via a.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
IMPROVE Particle Monitoring Network: Quality Assurance – Field Audits Chuck McDade Crocker Nuclear Laboratory University of California, Davis Presented.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Interim Alternate Route Adjustment Process Joint Training INTERIM ALTERNATE ROUTE ADJUSTMENT PROCESS Joint Training October 31, 2008 INTERIM ALTERNATE.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Validation Defination Establishing documentary evidence which provides a high degree of assurance that specification process will consistently produce.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Trades and Transfers Workshop, 6 th November 2007.
Recommended Guide for Determining and Reporting Uncertainties for Balances and Scales Val Miller NIST Office of Weights and Measures.
Energy Savings Opportunity Scheme Key issues for consultation Martin Adams Energy Savings Opportunity Scheme Team Leader 31 July 2013.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Horndon Temperature Error (SMER)
Effective Interest Calculations
National Laboratory Association
Transmission Workstream 4th July 2007
Pseudo-tie business procedure
SO Incentives from April 2010
Action 0002: Meter Error Notifications
UNC Review Group 0251 Metering Issue for Consideration
UNC 0407 Analysis Scope - Update
Orifice plate meter error resolution – cash flows
UNC Modification 0335 – Offtake Metering Error Payment Timescales
LDZ Offtake Meter Orifice Plate Error
Flow Swaps at NTS / LDZ offtakes
UNC Transmission Workstream 7th December 2006
Stefan Leedham 22 November 2007
MP0131: Meter Error Notifications
Commercial Arrangements For Gas Quality Service – Introduction
Joint Office UNC Elections
Joint Office UNC Elections
Pseudo-tie business procedure
Joint Office UNC Elections
Presentation transcript:

Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009

2 Contents.  What is the Issue?  How was the error identified?  What is the error?  Route cause of the error.  Impact.  Timeline of events.  Remediation.  Summary.

3 What is the issue?  A meter error has been identified potentially affecting 34 of National Grid’s Offtake meters across all 4 National Grid distribution networks.  Meter validations in accordance with ME/2 procedures.  Orifice plates are exchanged every 12 months in accordance with UNC.

4 How was it identified?  An audit of an Offtake meter during July 2009 identified an anomaly on the physical measurement of the orifice plate.  A number of audits are undertaken on an annual basis at agreed offtakes following consultation with Ofgem.  Audits are conducted in accordance with GMR  Auditor noticed orifice plate dimension of outside of normal tolerance after looking across a number of certificates. – This is not part of the routine audit process.

5 What is in error?  An error in the measurement of the orifice bore dimension of the orifice plate.  The dimensions of the plate are required in order to calculate the flow of natural gas through the meter. Orifice bore dimension (d / mm)

6 Route cause of the error.  Error traced back to calibration of the KEMCO 700 coordinate measuring machine (CMM) used to determine the orifice bore.

7 Calibration.  Calibration of the Kemco dimensional (CMM) machine undertaken on an annual basis by a UKAS accredited calibration facility.  Bias introduced following a calibration undertaken on the  Bias removed following a calibration undertaken on the

8 Impact.  All orifice plates measured during this period will have been in error.  Results in a nominal dimensional error of ~ mm in 311mm. – Approximately the same % error regardless of d. – Therefore as dimension to be measured increases then so does the error.  Equates to ~ 0.25% under read of volume gas throughput.  Equates to energy of ~ 600 GWh being underreported from the 34 meters. – Varies between 2-56 GWh per meter.

9 Timeline – general.

10 Timeline – site example.

11 Remediation.  National Grid will ensure that O/P’s that have dimensional changes outside of the uncertainty of measurement are investigated.  National Grid will ensure that the CMM is checked on a routine basis to ascertain suitable repeatability.

12 Summary.  A potential meter error at 34 orifice plate meter errors across our 4 Networks.  Additional checks now in place.  A potential under registration of ~ 600 GWh of energy at LDZ entry.  The measurement error notifications reported via the Joint Office in accordance with UNC conditions.