Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.

Slides:



Advertisements
Similar presentations
The Chemical Engineering Law of 2004
Advertisements

Licensing Standards Day Care Centers
2009 Local Issuance Office Training Office of the State Registrar.
S.L Part 1, Section 3.(b) G.S. 150B-21.3A: PERIODIC REVIEW AND EXPIRATION OF EXISTING RULES.
CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR License Requirements & Work Practice Standards.
How you can become a licensed contractor. Step # 1 Know The Law First and most importantly, it is against the law to work in the construction trades without.
Installer Certification NMAC The effective date for certified installer requirements for performing UST system installations or repairs in New.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Geothermal Alliance of Illinois Getting it Right the First Time.
Article XXXVI – Signature, ratification, acceptance, approval or accession 1. – This Protocol shall be open for signature in Berlin on 9 March 2012 by.
Land Use Program Septic System Overview Scott Weldon
RECOMMENDATIONS OF THE STATE TASK FORCE FOR THE PREVENTION OF HUMAN TRAFFICKING RECOMMENDATIONS OF THE STATE TASK FORCE FOR THE PREVENTION OF HUMAN TRAFFICKING.
Registration for North Dakota Geoscientists under a North Dakota Board of Registration for Professional Engineers, Land Surveyors and Geologists. Dave.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
Presentation to Spark NH July 27, 2012 Jack Lightfoot, Child and Family Services Based on materials from NH Center for Nonprofits Alliance for Justice.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
World Health Organization
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Chapter 3 Michigan License Laws and Rules 2010©Cengage Learning. All Rights Reserved.
Continuing Education for Texas Electrician License Renewal State of Texas Law: Title 8, Occupations Code Chapter 1305 NOTE: This presentation contrasts.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
1 Exemption Administration Training Prepared by the Streamlined Sales Tax Governing Board Audit Committee Prepared January, 2011.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
April 15 th is not just the deadline for your taxes!!! Is your documentation complete for Pharmacist to Registered Technician Ratios? Policies.
Legislative Update Chuck Essigs. HB2031 Schools; Contractors; Fingerprint Clearance Card  Requested by school districts  Contractors, subcontractors,
Indiana Code Township Board IC
Presented by Statewide Task Force on Interpreter Licensure Proposed Interpreter Licensure Bill (SB 389) Draft Summary As of September 25, 2009.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
A case on Chinese Company Law: Faye. Case introduction Company A and Company B established a limited liability company C together. The stock share of.
Connecticut Department of Energy and Environmental Protection.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
INKOMATI CATCHMENT MANAGEMENT AGENCY PROPOSED AMENDMENTS TO THE NATIONAL WATER ACT Presented by Adv Johan Boshoff 22 October 2008.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Matthew Johnson Harris County Matthew Johnson Harris County.
Section 25 Company Registration. Section 25 Registration  The section 25 company registration is tested for the comfort of the government an company.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 3 – Right of establishment and freedom.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
BILL 68 UPDATE Kim Allen, P.Eng. – CEO/Registrar.
EDCON1 (Chapter Four,Lesson1.3) REPUBLIC ACT 9293 MEA-EDCON1.
DISTRICTS OF INNOVATION OVERVIEW PRESENTATION TO DISTRICT IMPROVEMENT & PLANNING COMMITTEE MAY 11, 2016 Dr. Maroba Zoeller, Chief Governmental Relations.
Arizona Legislative Changes to Vital Records Laws NAPHSIS – Cincinnati – June,
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
Licensing Standards Day Care Centers
Septic System Overview
Water Efficiency Ordinance ZCA No. 750
April 15th is not just the deadline for your taxes
Commissioner Christi Craddick Commissioner Ryan Sitton
GUKEYEH GUK’EH GU’SANI Kaska Dena Good Governance Act
Getting it right the first time
District of Innovation Overview Public Hearing January 17, 2017
RECOMMENDATIONS STATE TASK FORCE FOR THE PREVENTION OF HUMAN
OFFICE OF THE CITY CLERK JULY 24, 2017 CERTIFICATION OF SUFFICIENCY OF A REFERENDUM PETITION AGAINST ORDINANCE NO ADOPTED BY THE PASADENA CITY.
AIRWORTHINESS OF AIRCRAFT
NAVIGATING THE LCSW LICENSING PROCESS
Voter Eligibility & Confirmation of Residency
“How you can become a licensed contractor”
What is the UL QFCP? FCIA Webinar Presenters:
City Council Meeting November 14, 2016
Structural Audits PREPARED BY: ROBIN RHYS DATE: 04/04/2019
105 Indiana Administrative Code Article 13
Presentation transcript:

Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health

 Registration of closed loop well contractors  Permitting of closed loop well systems  Establishment of Closed Loop Contractors Certification Board  Passed both Houses on  Sent to Governor on  Governor signed the legislation August 15, 2011 to make the legislation into law

 Water Well and Pump Installation Contractor’s License Act  Illinois Water Well Construction Code

“Closed loop well” means a sealed, watertight loop of pipe buried outside of a building foundation intended to recirculate a liquid solution through a heat exchanger but is limited to the construction of the bore hole and the grouting of the bore hole and does not include the piping and appurtenances used in any other capacity. “Closed loop well” does not include any horizontal closed well systems where grouting is not necessary by law or standard industry practices.

“Closed loop well contractor” means any person who installs closed loop wells for another person. “Closed loop well contractor” does not include the employee of a closed loop contractor.

 Work with Closed Loop Well Contractors Certification Board regarding  Registration and certification of closed loop well contractors  For purposes of this item, the term “closed loop well” shall be limited to the construction, installation, repair, and abandonment of the bore hole and the grouting of the bore hole.

 Six members  Temporary Board for 2 years  Appointed by Department with recommendations of organizations that are representative of the closed loop well industry in Illinois  Perform duties as specified in the Act

 Temporary Board to remain in place until 2 years after the effective date of the Act March  After that there will new members appointed who are certified and registered closed loop well contractors

 Preparing subject matter for continuing education sessions relating to closed loop wells  Preparing examinations for the certification of closed loop well contractors  Adopting rules  Holding examinations  Holding hearings

 Grading all examinations for certification  Work with the Water Well and Pump Installation Contractors Licensing Board regarding the construction, installation, repair, and abandonment of closed loop wells.

 Make application for certification by the Department  Examination fee  Pass qualification examination  Contractors have up to two years, following the effective date of the Act, to become certified

 Licensed water well contractors may apply and receive certification without examination or fee  Any person who installs horizontal closed loop wells using the open trench method shall be exempt from certification  Certification examinations will start sometime in 2012

 All closed loop well contractors must file an application for registration with the Department  Applications must include:  Verification of certification by an organization approved by the Department in its appropriateness in determining the knowledge and expertise as a closed loop Contractor, e.g., National Ground Water Association, International Ground Source Heat Pump Association, Possibly others

 Contractors have up to one year*, following the effective date of the Act, to become certified by the outside organization  Application for registration must also include proof of passing the certification examination, or exempt from certification as a licensed water well contractor  Registrations must be renewed annually  Annual renewal fee (set by rule)

 Issue permits for the construction, modification, and abandonment of closed loop wells.  Most likely issue permits for closed loop well systems  Permit fee to be established by rule  Issuance of permits will start sometime in 2012*

 Modification of water wells  Abandonment of water wells  Fee - $100

 Develop rules (Illinois Water Well Construction Code)  Forms  Application for certification  Application for registration  Application for permit to construct, modify, or abandon a closed loop well system  Closed loop well construction report  Closed loop well abandonment report  Inspection report  Add well abandonment to water well permit application