PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

Petroleum Engineering 406
Petroleum Engineering 406
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Training in Oil & Gas Production for BP Technical Interns Section 9 – Chemical treatment system Chemical treatment systems are an important part of many.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Lesson 25 Well Control, cont’d
Deliquification of Gas Wells using a Multi-Channel System TechCommCorp 219 Blood Rd. Chester, VT (802)
It’s About Time Sanjaya Sood May, Initials Key Industry Drivers The Emergence of Three Main Trends Introduction of new enabling technology, bringing.
Downhole Pressure Monitors Halliburton Pressure Transmission Systems (PTS) have been in use at SYU since 1984 (Hondo) & 1993 (Harmony & Heritage) Have.
ASME/API GAS LIFT WORKSHOP DOWNHOLE GAS LIFT AND THE FACILITY John Martinez Production Associates ASME/API GAS LIFT WORKSHOP.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
Completing & Producing A Well
Server Virtualization: Navy Network Operations Centers
By: Gatut Widianoko Weatherford Artificial Lift Systems
DOC ID © Chevron 2007 Chemical EOR Implementation for the Captain Field, UK 30 th IEA EOR Symposium and Workshop September 2009 Anette Poulsen, Chevron.
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
Information Systems Chapter 10 – Computers: Understanding Technology, 3 rd edition 1November 13, 2008.
Gas Lift Redesign in Dual Strings Completion
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
Smart Automation Well Venting Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production Company, American Petroleum.
What is the Smart-well ? Non-conventional and equipped well
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
DOC ID © Chevron 2005 Chevron PRODML Pilot Activities Vendor Participants: Invensys Weatherford Tibco Halliburton Matrikon Euriware Energy Components.
Classification: Statoil internal Status: Draft
2002 Spring ASME/API Gas-Lift Workshop
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
Shell Global Solutions PRODML Business Overview Ron Cramer.
Automating Continuous Gas Lift
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
Tom Beebe Project Manager
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Copyright February Shell International E & P All Rights Reserved ASME/API Gas-Lift Workshop Sheraton - North Houston Houston, TX February 6 and.
 Business Empowerment Bert van den Berg 11 March 2000 / Monterey.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe,
Lecture 10 Production Engineering
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
Solar Power Applications
Ken Shoquist VP, CIO Information Technology Board Meeting October 2003
Analysis of Heading in Artificially Lifted Wells
How to prepare for the End of License of Windows Server 2012/R2
Automated Gaslift Control Pecten Cameroon Company
Developing an Existing Piping Assets Traceability & Tracking Strategy
Enterprise Resource Planning, 1st Edition by Mary Sumner
SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from.
Enterprise Business Systems
High Liquid Volume Plunger Lift in the Permian Basin
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l “A PRACTICAL APPROACH TO OPTIMIZING A MATURING FIELD” PRESENTED BY: ANDREW MABIAN PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l PREPARED BY: SAM WILDMAN ALTEC GAS LIFT, INC ASME Gas Lift workshop - 2001

MOKOKO ABANA CONCESSION Results to date are as follows: Achievements Optimization training and calibration facility setup June/July 2000 Well work proceeded October 2000 ( 45 wells program ) Well work approximately 75% completed Results to date are as follows: 1573 BOPD gained -1374 MCFGPD less injection required Quicker recovery time after upsets Average daily production above 26,000 BOPD

The Mokoko Abana Concession is located approximately 40 miles off Cameroon’s southwest coast.

MOKOKO ABANA CONCESSION FIELD LAYOUT

MOKOKO ABANA CONCESSION FIELD BACKGROUND Drilling of the field initiated 1982. 9 platforms set and drilled 1982-1990. 12 platforms by 1997. 11 producing platforms.

MOKOKO ABANA CONCESSION FIELD BACKGROUND 80 producing wells. 4 natural flowing wells. 74 gas lifted wells. 2 ESP wells.

MOKOKO ABANA CONCESSION FIELD BACKGROUND Production peak at 50,000 BOPD 1986. 6 sands. 7 fields/blocks Laminated Sandstone reservoirs. Water flood initiated 1984.

Infrastructure upgraded 1997 MOKOKO ABANA CONCESSION FIELD BACKGROUND Infrastructure upgraded 1997 Pumps and compressors installed down field on Echo platform to lower production pipeline pressure. 2 ESP pumps installed 2000.

INDIVIDUAL WELL TEST INDICATED FIELD CAPABLE OF PRODUCING MOKOKO ABANA CONCESSION PRE-OPTIMIZATION 1/1/2000 INDIVIDUAL WELL TEST INDICATED FIELD CAPABLE OF PRODUCING 26,000 BOPD. 63,000 BWPD 45,510 MCFPD FORMATION 34,000 MCFPD GAS LIFT INJECTION

MOKOKO ABANA CONCESSION DAILY AVERAGE PRODUCTION PRE-OPTIMIZATION 1/1/2000 DAILY AVERAGE PRODUCTION 24,000+ BOPD. 58,152 BWPD 42,009 MCFPD FORMATION 31,385 MCFPD GAS LIFT INJECTION

PRE-OPTIMIZATION GAS LIFT SYSTEM PROBLEMS IDENTIFIED. MOKOKO ABANA CONCESSION PRE-OPTIMIZATION GAS LIFT SYSTEM PROBLEMS IDENTIFIED. Gas lift valve calibration arrangement - Cycle time inefficient. Down hole problems identification - More surveys data needed. Injection gas pressure low - Best wells in North field. Manual onsite well by well allocation of gas lift gas. Surveillance process - Needed improvement.

PRE - OPTIMIZATION GAS LIFT SYSTEM PROBLEMS IDENTIFIED. MOKOKO ABANA CONCESSION PRE - OPTIMIZATION GAS LIFT SYSTEM PROBLEMS IDENTIFIED. Extended kick off time after compressors shut downs. Freezing at injection gas control valves. Low rate wells using excess gas lift gas. Multi zone production. Wells data files - Incomplete.

MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Gas lift valve calibration - Cycle time inefficient Gas Lift valves and stock located onshore. Setup and calibration performed onshore by vendor. 2 weeks cycle time from problem identification to remedial action.

MOKOKO ABANA CONCESSION ACTION/RESULTS Purchased and installed valve calibration unit offshore. Moved valve inventory to offshore location. Altec technician trained Pecten personnel in valve calibration Time lapse from identification to implementation cut to few hours. Valves tested for stem travel. Check valve integrity tested. Check valve function ability checked. (sticking in low pressure seal) Designed for port sizes identified and adhered to. Valves flexed and aged previous to final calibration.

Down hole problem identification - More survey data needed MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Down hole problem identification - More survey data needed Appropriate tool to run pressure gauges not existing - common practice was to choke / shut-in well until gauges were at lowest point, then re-open well. Well test taken during survey not representative due to the above. Annular fluid levels - not available.

MOKOKO ABANA CONCESSION ACTION/RESULTS Purchased Anti-blowup tools. Purchased Echometer for annular fluid level identification. Offshore personnel trained on the use of above mentioned tools. More Flowing surveys are being performed. Test data more accurate. Annular fluid levels taken on every gas lifted well: 17 wells found not to be lifting at lowest possible point. Pecten purchasing Shell Line for real time surface readout pressure data gathering and surveillance enhancement.

Injection gas pressure low - Best wells in North field MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Injection gas pressure low - Best wells in North field 900# 2,590 MCFPD 900# 1,137 MCFPD 970# 2,546 MCFPD EXCESS GAS 890# 3,454 MCFPD 930# 2,255 MCFPD 980# 4,303 MCFPD 880# 4,641 MCFPD 990# 5,860 MCFPD 1000# 980# 3,945 MCFPD 840# 3,728 MCFPD 990# 725 MCFPD OIL SALES

MOKOKO ABANA CONCESSION ACTION/RESULTS Revised gas lift designs for platforms nearest compression point to preserve pipeline pressure. Replaced orifice valves with live valves to: 1 - Prevent casing bleed down during system upsets 2 - Get full benefit of gas lift pressure Optimized injection gas to each well as per Winglue projection. Recovery time after system upsets improved. ( eliminated re-pressuring of annular areas ) Reduced injection gas volumes to high water cut wells. Improved available injection gas volumes/pressures in North field.

Manual onsite well by well allocation of gas lift gas MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Manual onsite well by well allocation of gas lift gas Recovery time is delayed by re-pressuring wells after systems upsets. High water cut wells located nearest compression point take priority when coming back online.

MOKOKO ABANA CONCESSION ACTION/RESULTS Developing system to provide computer control of gas volume. Installing gas lift automation on platforms and wells. Gas lift project testing and installation phase in progress. Implementation of Field Ware application for remote control of gas lifted wells/lift gas allocation.

Surveillance process - Needed improvement MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Surveillance process - Needed improvement Earlier attempts at surface injection gas optimization had not been successful. Recommended field wide gas lift allocation - not successful.

MOKOKO ABANA CONCESSION ACTION/RESULTS Altec technician trained all field personnel in basic gas lift principles, optimization, trouble shooting techniques. Altec technician visited each platform with senior operator - Discussed each well focussing on: 1 - Injection gas pressure available on platform 2 - Wells with freezing problems across manual control valve 3 - Wells that require manipulation to kick-off Staffed well analyst position offshore. Buy in from: * Production operators * Operations foremen * Production advisors * Engineering

MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Extended kick-off time after compressors shut downs Freezing at injection gas control valves Wells would not kick-off after extended shut-downs due to: 1 - Improper gas lift valves designs 2 - Large ported valves used Incorrect thermal gradients data used in simulations/analysis.

MOKOKO ABANA CONCESSION ACTION/RESULTS Reviewed gas lift designs and implemented changes. Designed gas lift with IPO valve as operating valve. Eliminated methanol injection on “C” and “D” platforms. Reduced cycle time after systems upsets and platform shut-downs. Increased operating casing pressure allowing better recovery time.

Low rate wells using excess gas lift gas MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Low rate wells using excess gas lift gas Wells producing less than 200 BFPD required a high GLR to keep them in stable flow.

MOKOKO ABANA CONCESSION ACTION/RESULTS Checked annular fluid levels for all wells. Modeled wells for intermittent lift application. Installed Altec 1” ABBA(TM) pilot valve along with standing valve in intermittent lift candidates. Averaged 17% increase in oil production from candidates wells. Averaged 22% decrease in injection gas to candidate wells.

Multi zones production MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Multi zones production Most wells have more than one selective isolated between packers. Zones produced individually - Production not optimized.

MOKOKO ABANA CONCESSION ACTION/RESULTS Set standing valve between zones when lower interval is lower pressure: * Preventing cross flow during shut-ins / production. *Allows multiple zones to remain open and contribute as pressures allows. More sands produced through same conduit, depleting reserves in a more timely manner. Zones commingled with standing valves have exceeded modeled production rates and reserves estimations

Wells data files - Incomplete MOKOKO ABANA CONCESSION PROBLEM DISCUSSION Wells data files - Incomplete Well work data, well model files, installation drawings or designs - not consolidated. Data files incomplete and not updated.

MOKOKO ABANA CONCESSION ACTION/RESULTS Build electronic well summary for each well. Performed well work is reported and available onshore electronically. Winglue database is maintained on a shared drive in network. Databases are checked for accuracy before use. Common and correct/updated database accessible by all. Migration to WellView software to capture lessons learned.

Summary / Results MOKOKO ABANA CONCESSION 1573 BOPD gained Optimization training and calibration facility setup June/July 2000 Well work proceeded October 2000 ( 45 wells program ) Well work approximately 75% completed More efficient surveillance process Results to date are as follows: 1573 BOPD gained -1374 MCFGPD less injection required Quicker recovery time after upsets Average daily production above 26,000 BOPD

MOKOKO ABANA CONCESSION TRACKING SPREADSHEET