FACILITY AND WORK DESIGN

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

TOPIC :CAPACITY AND FACILITIES
CAPACITY MANAGEMENT CHAPTER 10 DAVID A. COLLIER AND JAMES R. EVANS.
Process Selection and Facility Layout
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
Process Selection and Facility Layout
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Location Strategy and Layout Strategy
INTRODUCTION TO BUSINESS
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
1 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in.
Process Selection and Facility Layout
Facility layout Types of layout Mathematical models/algorithms
Process Selection and Facility Layout
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Operations Management
OPERATIONS SCHEDULING AND SEQUENCING
FACILITY AND WORK DESIGN
Facility layout.
Chapter 10 – Facility Layout
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
Facility Design and Layout
22/04/2017 Process selection.
Chapter 10 – Facility Layout
Chapter 9 : Layout Strategies
Facility Layout Chapter 10 pages , ,
McGraw-Hill/Irwin.
6-1Process Selection and Facility Layout William J. Stevenson Operations Management 8 th edition.
Line Balancing Problem
Assembly Lines – Reliable Serial Systems
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
OM2 FACILITY AND WORK DESIGN CHAPTER 8 DAVID A. COLLIER AND
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
Principles of Plant Layout 1. Principle of integration: A good layout is one that integrates men, materials, machines and supporting services and.
1 Facility Layout: Manufacturing and Services Manufacturing and Services Chapter 5, Part B.
Process Layout Chapter 7 July 20, 2005.
OPERATIONS & TECHNOLOGY MANAGEMENT (JMP 5023)
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
Manufacturing and Service Processes
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Processes
Facility Layout Chapter 10 pages , ,
An Integrated Goods and Services Approach
Cellular Layouts Cellular Production Group Technology
Process Selection and Facility Layout
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities Planning and Design Course code:
Operations Management
Process Selection and Facility Layout
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

FACILITY AND WORK DESIGN CHAPTER 8 DAVID A. COLLIER AND JAMES R. EVANS

Facility Layout Facility layout refers to the specific arrangement of physical facilities. Facility-layout studies are necessary whenever: a new facility is constructed, there is a significant change in demand or throughput volume, a new good or service is introduced to the customer benefit package, or different processes, equipment, and/or technology are installed.

Exhibit 8.1 Product Layout for Wine Manufacturer

Facility Layout Product Layout Advantages: Lower work-in-process inventories, shorter processing times, less material handling, lower labor skills, and simple planning and control systems. Disadvantages: A breakdown at one workstation can cause the entire process to shut down; a change in product design or the introduction of new products may require major changes in the layout, limiting flexibility.

Facility Layout A process layout consists of a functional grouping of equipment or activities that do similar work. Examples: Legal offices, shoe manufacturing, jet engine turbine blades, and hospitals use a process layout.

Exhibit 8.2 Process Layout for a Machine Shop

Facility Layout Process Layout Advantages: A lower investment in equipment, the diversity of jobs inherent in a process layout can lead to increased worker satisfaction. Disadvantages: High movement and transportation costs, more complicated planning and control systems, longer total processing time, higher in-process inventory or waiting time, and higher worker-skill requirements.

Facility Layout In a cellular layout, the design is not according to the functional characteristics of equipment, but rather by self-contained groups of equipment (called cells), needed for producing a particular set of goods or services. Examples: Legal services, such as labor law, bankruptcy, divorce; medical specialties such as maternity, oncology, surgery.

Exhibit 8.3 Cellular Manufacturing Layout Source: J. T. Black, “Cellular Manufacturing Systems Reduce Set Up time, Make Small-Lot Production Economical,” Industrial Engineering Magazine, Nov. 1983. Used with permission from the author.

Facility Layout Cellular Layout Advantages: Reduced materials-handling requirements, quicker response to quality problems, more efficient use of floor space, more worker responsibility increasing morale. Disadvantages: Duplication of equipment among cells, greater worker skills requirements.

Facility Layout A fixed-position layout consolidates the resources necessary to manufacture a good or deliver a service, such as people, materials, and equipment, in one physical location. Examples: The production of large items such as heavy machine tools, airplanes, buildings, locomotives, and ships. Service-providing examples include major hardware and software installations, sporting events, and concerts.

Fixed-Position Layout Advantages: Work remains stationary, reducing movement. Disadvantages: High level of planning and control required.

Facility Layout in Service Organizations Service organizations use product, process, cellular, and fixed-position layouts to organize different types of work. Process Layout—Services that need the ability to provide a wide variety of services to customers with differing requirements usually use a process layout. Examples: Libraries, hospitals, insurance companies Product Layout—Service organizations that provide highly standardized services tend to use product layouts. Examples: Restaurant kitchens

Exhibit 8.6 A Typical Manufacturing Workstation Layout

Designing Product Layouts An assembly line is a product layout dedicated to combining the components of a good or service that has been created previously. Examples: Automobile assembly, Subway sandwich shops, insurance policy processing Assembly line balancing is a technique to group tasks among workstations so that each workstation has—in the ideal case—the same amount of work.

Assembly-Line Balancing Required information: The set of tasks to be performed and the time required to perform each task. 2. The precedence relations among the tasks—that is, the sequence in which tasks must be performed. 3. The desired output rate or forecast of demand for the assembly line.

Exhibit 8.7 A Three-Task Assembly Line One workstation: In an eight-hour day, could produce (1 part/1.0 min)(60 minutes per hour)(8 hours per day) = 480 parts/day Three workstation s (one for each task): The first operator can produce 120 parts per hour, or 960 parts/day. The second could produce 1,600 parts/day. The third operator can produce 2,400 parts/day. Maximum output is 960 parts/day. Two workstations (A/BC): Since each operator needs 0.5 minute to perform the assigned duties, the line is in perfect balance, and 960 parts per day can be produced.

Assembly-Line Balancing Cycle time is the interval between successive outputs coming off the assembly line. In the previous example, with one workstation, the cycle time is 1 minute; that is, one completed assembly is produced every minute. If two workstations are used, the cycle time is 0.5 minute/unit. If three workstations are used, the cycle time is still 0.5 minute/unit, because task A is the bottleneck, or slowest operation. The line can produce only one assembly every 0.5 minute.

Assembly-Line Balancing Cycle time (CT) is related to the output (R) by the following equation: CT = A/R [8.2] A = available time to produce the output. The output (R) is normally the demand forecast in units, adjusted for on-hand inventory if appropriate, or orders released to the factory. Both A and R must have the same time units of measure (hour, day, week, month, and so on).

Assembly-Line Balancing Minimum number of workstations required = Sum of task times/Cycle time = t/CT [8.3] Total Time Available = (Number of work stations)×(Cycle Time) = (N )(CT ) [8.4] Total Idle Time = (N )(CT ) − t [8.5] Assembly-line Efficiency = t/(N ×CT ) [8.6] Balance Delay = 1 − Assembly-line Efficiency [8.7]

Assembly-Line Balancing Line balancing approaches use decision rules, or heuristics, to assign tasks to workstations to attempt to minimize the amount of idle time at workstations, but do not guarantee optimal solutions. Examples: Assign the task with the longest task time first to a workstation if the cycle time would not be exceeded. Assign the shortest task first.

Exhibit 8.9 Precedence Network and Workstation Assignment

Assembly Line Balance for In-Line Skate Workstation Tasks Total Time Idle Time A 1, 2, 5 5.7 0.3 B 3, 4, 6, 7, 8 3.7 2.3 Total 9.4 2.6 Using equations [8.4] to [8.6] we may compute the following: Total Time Available = (Number workstations)(Cycle Time) = (N )(CT ) = (2)(6) = 12 minutes Total Idle Time = (N )(CT ) − t = (2)(6) - 9.4 = 2.6 minutes Assembly-line Efficiency =  t/(N ×CT ) = 9.4/(2 × 6) = 78.3%

Assembly-Line Balancing Cycle time (CT) is related to the output (R) by the following equation: CT = A/R [8.2] A = available time to produce the output. The output (R) is normally the demand forecast in units, adjusted for on-hand inventory if appropriate, or orders released to the factory. Both A and R must have the same time units of measure (hour, day, week, month, and so on).

Selected Solved Problems Chapter 8 Facility and Work Design Collier/Evans OM3

Bass Fishing Solved Problem (p. 155) Assembly line has six workstations. Management wants an output of 300 reels per day, (with a 7.5 hour workday). The sum of the task times is 8 minutes/reel. What is the cycle time? CT = A/R What is the assembly line efficiency? Efficiency = t/(N ×CT ) What is the total idle time? Total Idle Time = (N )(CT ) − t

Bass Fishing Solved Problem Assembly line has six workstations. Management wants an output of 300 reels per day, (with a 7.5 hour workday). The sum of the task times is 8 minutes/reel. What is the cycle time? CT = A/R = 1.5 min/reel What is the assembly line efficiency? Efficiency = t/(N ×CT ) = 88.9% What is the total idle time? Total Idle Time = (N )(CT ) − t = 1 min/reel

Assembly-Line Balancing Minimum number of workstations required = Sum of task times/Cycle time = t/CT [8.3] Total Time Available = (Number of work stations)×(Cycle Time) = (N )(CT ) [8.4] Total Idle Time = (N )(CT ) − t [8.5] Assembly-line Efficiency = t/(N ×CT ) [8.6] Balance Delay = 1 − Assembly-line Efficiency [8.7]

Exhibit 8.9 Precedence Network and Workstation Assignment Given: CT = 6.0 min/unit (see pages 156-157) Workstation Tasks Total Time Idle Time A B Total

Exhibit 8.9 Precedence Network and Workstation Assignment Workstation Tasks Total Time Idle Time A 1, 2, 5 5.7 0.3 B 3, 4, 6, 7, 8 3.7 2.3 Total 9.4 2.6

Assembly Line Balance for In-Line Skate Workstation Tasks Total Time Idle Time A 1, 2, 5 5.7 0.3 B 3, 4, 6, 7, 8 3.7 2.3 Total 9.4 2.6 Using equations [8.4] to [8.6] we may compute the following: Total Time Available = (Number workstations)(Cycle Time) = (N )(CT ) = Total Idle Time = (N )(CT ) − t = Assembly-line Efficiency =  t/(N ×CT ) =

Assembly Line Balance for In-Line Skate Workstation Tasks Total Time Idle Time A 1, 2, 5 5.7 0.3 B 3, 4, 6, 7, 8 3.7 2.3 Total 9.4 2.6 Using equations [8.4] to [8.6] we may compute the following: Total Time Available = (Number workstations)(Cycle Time) = (N )(CT ) = (2)(6) = 12 minutes Total Idle Time = (N )(CT ) − t = (2)(6) - 9.4 = 2.6 minutes Assembly-line Efficiency =  t/(N ×CT ) = 9.4/(2 × 6) = 78.3%