THE EFFECTS OF WIND ON CRANES AND THEIR LOADS

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Basic terms and equipment
Tower Crane Safety Regulations
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
Aerial Lifts & Other Elevating Platforms Chuck Northam
SETTING UP OF MOBILE CRANES
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
UNIVERSITY of N ORTHERN C OLORADO. To move forward press enter or the down arrow key To view the previous slide press backspace or the up arrow key.
Scissor Lift Safety Training
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Cranes and Slings Major Causes of Crane Accidents
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
OSHAX.org - The Unofficial Guide To the OSHA
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
Crane Operations Objective
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
Chapter 17 Cranes Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
RIGGING FUNDAMENTALS PRESENTED BY: HENNEPIN TECHNICAL COLLEGE IN PARTNERSHIP WITH FEDERAL OSHA SUSAN HARWOOD GRANT This material was produced under Grant.
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Hydraulic Crane Safety. Hydraulic Cranes Can be stationary or attached to trucks, trains and boats Can be stationary or attached to trucks, trains and.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Excavating and Lifting Part 3
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction.
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Get the right MEWP for the job
Fall Protection in the Roofing Industry
History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Aerial and Scissor Lift Safety
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
Benjamin Ross, Assistant Regional Administrator for Enforcement Programs February 13, 2012 ASSE FEBRUARY MEETING Federal OSHA Update.
Sling Load Capacity and Sling Angles
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Small Wind Site Assessment Produced by the Institute for Sustainable Futures; UTS in partnership with the Alternative Technology Association and TAFE NSW.
PPT 10-hr. Construction – Scaffolds v Created by OTIEC Outreach Resources Workgroup Scaffolds 10-Hour Construction Outreach.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Accidents Case Studies
Are there guidelines for noise exposure on shifts longer than 8 hours? 1) Equal energy rule Many regulatory agencies recommend a time- weighted average.
FIRE EFFECTS MONITORING LESSON 4 SMOKE OBSERVATIONS.
Overview of ASME P Planning for Load Handling Activities
Copyright © 2012 American Safety Management Inc. Crane and Hoist Safety.
Why Do We Need to Change ?  It limits our ability to reduce insurance rates (NFIP).  Places local contractors and Real Estate agents at a disadvantage.
TOWER CRANES. TOPICS INTRODUCTION INTRODUCTION TYPES OF CRANES TYPES OF CRANES DIFFERENT COMPONENTS OF CRANE DIFFERENT COMPONENTS OF CRANE ERECTION PROCEDURE.
Dangers Posed by Vehicle Loading Cranes Demonstrate the Need for Proper Crane Training.
Setting up Today’s Advanced Cranes Introduction Just because a crane is mobile doesn’t mean you can lift loads anywhere. Where and how you set up a crane.
Cranes, Derricks, Hoists, Elevators, and Conveyors - Subpart N Section 6 Robert Poole St. Paul Fire & Marine Insurance Company.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
OSHA’s NEW Walking-Working Surfaces
Hand Signals for Crane Operations.
Lifting & Rigging Continuing Education Fourth Quarter 2016
SAFE WORK INSTRUCTIONS
Environmental Health & Safety
Click anywhere to get started…
Potential Energy.
Click anywhere to get started…
SAFE WORK INSTRUCTIONS
Click anywhere to get started…
Wind Energy Permitting
10-hr. Construction – Cranes
Presentation transcript:

THE EFFECTS OF WIND ON CRANES AND THEIR LOADS Houston Business Roundtable – Feb. 12, 2013 THE EFFECTS OF WIND ON CRANES AND THEIR LOADS Matt Gardiner, P.E.

PRESENTATION OVERVIEW Houston Business Roundtable PRESENTATION OVERVIEW Wind Effects Standards & Regulations Wind Related Accidents Lift Planning Considerations Questions

1 Wind Effects

About wind… Wind speeds are measured at 33 feet above ground 1 WIND EFFECTS About wind… Wind speeds are measured at 33 feet above ground Wind speed increases with height Gusts can be a bigger problem than sustained winds Look for obstructions to wind Look for potential areas that funnel or redirect wind

How does wind affect a lift? 1 WIND EFFECTS How does wind affect a lift? Wind applies forces directly to the load (sail effect) Wind applies forces directly to the crane Drift can cause tip-overs or side-loading Drift can eliminate clearances with boom or other obstructions Drift (inward) can cause backward instability Wind on load can cause load control issues

2 Standards & Regulations

2 Crane manufacturers, OSHA and ASME provide wind requirements STANDARDS & REGULATIONS OSHA Regulations Crane manufacturers, OSHA and ASME provide wind requirements §1926 Subpart CC §1926.1403(h)(12) and §1926.1435(b)(4)(iii): Wind effects must be considered during A/D ops for mobile and tower cranes §1926.1410(c)(1): Power line drift from wind when working inside Table A distances §1926.1417(h): Equipment securement requirements from storm warnings §1926.1417(n): Capacity adjustment requirements due to wind §1926.1431(k)(8)(i): Personnel hoisting requirements – 20 mph at the platform? §1926.1435(e)(6)(v) and §1926.1437(e)(3): Wind indicators required on tower cranes and cranes on barges §1926.1437(m)(1)(ii): Load charts must consider 40 mph winds for cranes on barges §1926.1437(n)(1)(i): Rated capacity reduction requirements (as applicable) due to wind for cranes on barges

2 ASME B30.5 - 2011 STANDARDS & REGULATIONS ASME Standards ASME B30.5 - 2011 5-3.1.3.2.1(h)(2): Site Supervisor responsible to ensure potential effect of wind is addressed 5-3.2.1.5(b)(5): The effect of wind on the load and crane has to be noted and considered 5-3.4.5.4(g): For operations within a FULLY ERECTED/EXTENDED BOOM LENGTH of Table 5-3.4.5.1-1 (same as OSHA Table A), horizontal and vertical power line drift due to wind shall be added to the minimum clearance distance in the Table Also requires consultation with utility owner to get specific clearances

4 LIFT PLANNING CONSIDERATIONS

What does the manufacturer say? 4 LIFT PLANNING CONSIDERATIONS What does the manufacturer say? Most manufacturers recommend capacity reductions above 20 mph Most manufacturers set maximum allowable wind speeds for operations Always consult the operations manual for instructions

What is the wind forecast? 4 LIFT PLANNING CONSIDERATIONS What is the wind forecast? Check with reliable sources (NWS, NOAA, official stations) Look for peak projected sustained and gust speeds AND wind direction(s) Speeds tell you how much force can be applied Direction tells you how the crane and load will be loaded by wind Remember that wind forecasts are at a height of 33 feet and your cranes and loads may be much higher

4 LIFT PLANNING CONSIDERATIONS Food for thought Will the wind generate enough force to significantly move the load? Will the wind generate enough force on the crane’s boom to jeopardize stability? Can the wind cause load control problems? Are there nearby buildings that can funnel or redirect wind flow? Has the Operations Manual been consulted for limitations? Is there anything nearby that can be affected by wind that could interfere with the lift? Are there any on-site weather stations or anemometers?

References 4 OSHA Regulations ASME Standards LIFT PLANNING CONSIDERATIONS References OSHA Regulations ASME Standards Crane Manufacturer (Operations Manual) Cranes and Derricks, by Howard Shapiro

5 QUESTIONS?