Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.

Slides:



Advertisements
Similar presentations
Electrical Hazards for Fire and Rescue Departments Part III: Fires Near High Tension Power Lines Captain I Gary C. Dize Health and Safety Division Fairfax.
Advertisements

Captain I Gary C. Dize Health and Safety Division
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Awareness Working Near Overhead Electrical Lines Module 4.
Electrical Safety 1926 Subpart K ‑ Electrical
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Electrocution Hazards in Agriculture October, 2010.
Electrical Safety Scenarios
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Rigging, Signals, Power Line Safety & Assembly / Disassembly in Construction Safety Standard WAC This presentation is intended to “summarize” the.
OSHA Office of Training & Education
Ladder Safety and Aerial Lifts
CASE STUDY The Importance of Accurate Hazard Identification Greg Dunlop (Geokinetics (Australasia) Pty Ltd)
EQUIPMENT SPOTTER TRAINING
Crane Operations Objective
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS THE INFINITY GROUP.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
Hydraulic Crane Safety. Hydraulic Cranes Can be stationary or attached to trucks, trains and boats Can be stationary or attached to trucks, trains and.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Subpart CC Qualified person means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction.
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Controlling Hazardous Energy
Safety Training Presentations
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
Moving Equipment Safely around Power Lines Presented by: Farmington Electric Utility FCSN-Equipment Move Task Force.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Backing & Spotter Safety
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Electrical Safety.
ESTW/ Castor The company has to take care that: Equipment and switchgears are operated according relevant standards The errection, extension and maintenance.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
1a.  Exposed part  Live or energized part  De-energized part 1a.
4/1/20101 Contractor Management of Change: Implementation of Vehicle and Equipment Spotting Pre-Task Analysis Card Start Date: May 2010 Texas Operations.
OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
ExcavationsFallsScaffoldsCranes
Pennsylvania Bureau of Deep Mine Safety Lockout/Tagout Program.
Electrical Hazards Temporary Wiring and Lighting Systems.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Crane & Derricks In Construction
MNM Fatal Electrical Electrical October 16, 2004 (Missouri) October 16, 2004 (Missouri) Crushed Stone Operation Crushed Stone Operation Laborer.
Electrical Work Practices City of Council Bluffs Presented by: SilverStone Group © 2012 Zywave, Inc. All rights reserved.
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Mosaic Mineral’s Mobile Equipment High Voltage Overhead Line Procedure (the Foot Rule) This lesson is intended for Minerals (Mine) site employees.
Overhead and Underground Power Line Safety 1 Quentin Baker Director of Safety
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Presented by: ETTA, OSH Division,
Electrical Safety Lesson 7.
Lifting & Rigging Continuing Education Fourth Quarter 2016
Personal Protective Equipment
Click anywhere to get started…
Electrical Safety.
Click anywhere to get started…
Click anywhere to get started…
Electrical Safety Lesson 7.
Click anywhere to get started…
Click anywhere to get started…
Presenter Name Presenter Title Event Name
10-hr. Construction – Cranes
Presentation transcript:

Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck by Crane 3%

 This video displays the effects of a crew assuming the overhead lines were phone or cable, and not electrical.  Always assume overhead lines to be electrical and live unless the utility company has provided notice that they have been de-energized, and they are visibly grounded.

POWER LINE HAZARD ASSESSMENT MUST BE COMPLETED FOR EACH JOB CRANE IS USED ON  STEP 1: DESIGNATE WORK ZONE  For every job which we use a crane, we must first designate the work zone. OPTION 1 Designate the work zone as the maximum working radius 360 degrees around the crane OPTION 2 Use elevated visual aids such as warning lines to mark boundaries of the work zone. Not required to fully barricade the entire work zone (example would be a short row of lines on each side of the crane signaling where operator cannot swing past and a row at the far reach displaying the area that can’t be boomed past)

 STEP 2:  IN “WORK ZONE” DETERMINE IF CRANE OR RIGGING CAN GET WITHIN 20’ OF POWER LINES NO YES OPTION 1: Have utility company de- energize & ground No further action necessary OPTION 2: Maintain 20’ clearance at all times by placing elevated warning lines 20’ from power lines and having a dedicated spotter monitor distance when approaching OPTION 3: (use if needed to get close to lines than 20’) Ask utility company for exact voltage, and maintain distance requirements of Table A (next slide) by using elevated lines & spotter listed in option 2 Choose option below and have planning meeting w/all onsite to discuss

Table A – Minimum Clearance Distances Voltage (nominal, kV, alternating current) Minimum clearance distance (feet) up to 5010 over 50 to over 200 to over 350 to over 500 to over 750 to over 1000 (as established by the power line owner/operator or registered professional engineer who is a qualified person with respect to electrical power transmission and distribution)

 The hazard assessment criteria on the previous three slides discusses procedures assuming the power lines are not known exactly and presumed to be 350kV or less, which is our typical working environment.  When power lines are presumed to be very high voltages and over 350kV, the minimum distance kept must be 50’, rather than the 20’ discussed for voltages of 350kV and lower.

 Whenever power lines are within the pre-determined “work zone” and tag lines are used, the tag lines must be of non-conductive material.  A “dedicated spotter” or motion limiting device must be used to ensure the crane does not get within the minimum distance of the power lines. This spotter must be a qualified signal person capable of signaling the crane

 In the unlikely event that contact with a power line occurs, the response of those on or around power lines is critical.  In general, riggers and other workers working around the crane are in the most danger, however operators leaving the cab or operating from the ground can receive injury or death. The operator sitting in the cab on the left is at the same electrical potential as the crane, therefore is most likely not affected, however the operator on the right working from the ground, riggers and those around the crane at in significant danger.

 After the crane contacts power lines, the current flows through the crane and finally through the ground in a ripple pattern. Areas of high and low fields circle the crane like ripples in a pond after a stone hits the surface.  If a worker steps from between ripples, from an area of higher potential to one of lower, the electricity can flow between their legs and cause injury or death. OPERATORS SHOULD NOT LEAVE THE CAB UNLESS ABSOLUTELY NECESSARY (fire for example) IF EXITING CAB, JUMP FROM CAB AND SHUFFLE FEET IN VERY SMALL STEPS AS YOU WORK AWAY FROM THE CRANE

 Crane operator should remain inside the cab  All other employees must keep away from the crane, ropes, and load since the ground around the crane might be energized  Crane operator should attempt to remove the crane from contact by moving it in the reverse direction which caused the contact  If crane cannot be moved from contact, operator should remain in the cab until power is de-energized  If operator must leave because of immediate hazard, jump from equipment and shuffle feet in very small steps  Others should secure the area and keep all except for emergency rescue who are aware of the hazard away