CASE STUDY of Cantilever Method of Erection RUB spanning 32.958 mtr. NH-5 (Chennai-Kolkata) PREPARED BY: Srinibas Sahoo, AXEN/C/E.Co.Rly/Cuttack P. Choudhary,

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Roof Trusses Created By M.S.Martin 11/04, reviewed 11/05, reviewed 11/07.
Chapter-2 Parts of Steel Bridge.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
BOX PUSHING TECHNOLOGY
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
By : Prof.Dr.\Nabil Mahmoud
§ – Subpart L Oklahoma State University2.
SCAFFOLD SAFETY.
Truss Basics – Overview
Chapter 14 Roadway Bridge.
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Safe-Con, LLC Scaffold Safety Preview Safe-Con, LLC 5714 Merlin St. Madison, WI This is a preview of Safe-Con, LLC’s Scaffold.
Design of Tension Members
Design of Tension Members
Office of Training & Education1 § SUBPART L SCAFFOLDS.
CFR SUBPART L SCAFFOLDS
Scaffold User Training
Reinforced Concrete VS Steel
CONSTRUCTION.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Bridges By: Alison.
Chapter 6 Plate girder.
Group N Chris Jones Ella Feekins Nikoline Hong
Construction is the systematic process of erecting structures to meet human needs and desires. It reflects cultural norms, environmental conditions, and.
2 nd Year Trade Overview M. S. Martin Revised Feb
Bridge Engineering (5) Substructure – Abutments and Piers
1 Presented by the Wood Truss Council of America.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
BRIDGES.
Cranes and Slings 29 CFR and 184
7. APPROXIMATE ANALYSIS OF INDETERMINATE STRUCTURES
Moment Connection Requires Bolts Outside the Flanges
ROB at Koratty in lieu of LC No.54 Progress as on
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Presented by the Wood Truss Council of America
Jake Neal and Jay K.  OFFICIAL NAME: Smithfield Street Bridge LOCATION: Pittsburgh.
Overview of New Practices & Policy Skewed Bridges.
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
There are basically 4 different types of bridges: Arch bridge Suspension bridge Beam bridge Cable-stayed bridge An engineer would choose the correct bridge.
WELCOME ALL FACULTY MEMBERS & ALL PARTICIPANTS OF
PROJECT REPORT On REPLACEMENT OF BED BLOCKS ON
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
C-shaped steel beam pulley cable pulley lifting and installation work status.
Design of Crane Components
Index Temporary Works: No.Subject 1Timber Trenches 2Timber Scaffolding.
Installs, Dismantles. A. INSTALLS 1. The lower part of Beam should be installed by 2 Supports, which are proved safely. - Support should be maintained.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Height Work Safety.
Required Drawings and Info for Formwork or Scaffold Design
Engineering Terms Bridge Unit.
Engineering is Elementary House of Cards East Lyme Middle School
Structural Considerations for Trusses
Steel Erection 29 CFR 1926, Subpart R
Chapter-2 Parts of Steel Bridges.
§ SUBPART L SCAFFOLDS 1.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Material and building construction 1 floor & Roof systems
Arch205 building construction floor & Roof systems
Arch205 building construction floor & Roof systems
§ SUBPART L SCAFFOLDS 1.
Suryoday Technologies ISO 9001:2015 Co.
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Steel Erection 29 CFR 1926, Subpart R
Presentation transcript:

CASE STUDY of Cantilever Method of Erection RUB spanning mtr. NH-5 (Chennai-Kolkata) PREPARED BY: Srinibas Sahoo, AXEN/C/E.Co.Rly/Cuttack P. Choudhary, AXEN/C/E.Co.Rly/Khurda Road C.V. Naik, ADEN/E.Co.Rly/Srikakulam B.M. Rao, ADEN/S.E.Rly/Bondamunda Srinibas Sahoo, AXEN/C/E.Co.Rly/Cuttack P. Choudhary, AXEN/C/E.Co.Rly/Khurda Road C.V. Naik, ADEN/E.Co.Rly/Srikakulam B.M. Rao, ADEN/S.E.Rly/Bondamunda

LOCATION Bridge No. 4 on Cuttack Paradeep doubling project. NH-5 Chennai-Kolkatta spanning

SITE CONDITION Heart of Cuttack city on NH and Service Road on both side. No scope for middle support, and no diversion Road. Space constraint Track center 8 mt. Skew angle – 27 0 C/C of bridge shifted 6.5 mt. towards Cuttack due to skew angle.

ERECTION OF FIRST PANNEL

WHY CANTILEVER METHOD CONSIDERED Multispan. Insufficient Railway land. Feeding from one end only. No traffic block possible.

CHARACTERISTICS OF SCHEME Excellent quality of fabrication. Sequential proceedings. Overall time consumption is less. Huge quantity of counter-weight. Tailor made link material, pin & buffer block.

EQUIPMENT Erection crane -5M/T capacity. Link, Link plate & Link pin. Temporary Vertical. Buffer block. Temporary Portal. Hanging device. Trestle beam.

TEMPORARY ARRANGEMENT Laying of temporary track for erection crane. Erection of derrick crane. Temporary track for feeding. Temporary vertical, top link. Roller bearing, end cross girder & buffer block.

TEMPORARY ARRANGEMENT, ERECTION CRANE

ERECTION OF BOTTOM CHORD

PRELIMINARY ARRANGEMENTS Counter weight 19 M/T Roller bearing, end cross girder Main gusset, Diaphragm, riveting including countersunk rivets on formation. Bearing slab, buffer slab.

COUNTER WEIGHT

SEQUENCE OF ERECTION 1.Roller bearing, end cross girder. 2.Bottom chord. 3.Bottom Lateral Bracings. 4.Vertical. 5.End Racker. 6.2 nd cross girder, Rail bearer.

ERECTION OF FIRST PANNEL

SEQUENCE OF ERECTION CONTD………….. 7. Advance of temporary track & crane. 8. Two diagonal L 2 U Two vertical L 2 U 2, Two dia L 2 U Top chord U 1 U Link connection. 12.Top lateral bracings, Sway bracing.

ERECTIONAL DIAGONAL

SEQUENCE OF ERECTION CONTD………….. 13.Vertical L 3 U 3, Bottom chord L 2 L 4, diagonal L 4 U Cross Girder, Rail bearer, Bottom Lateral Bracing. 15.Erection crane advanced over link & top chord. 16.Advanced progressively. 17.Landing Bottom Chord on bed block over CC Crib. 18.Balanced member 19.End Racker

ERECTION OF SECOND PANNEL

LANDING OF THE GIRDER ON BED BLOCK

20.Jacking up the girder. 21.Release of preliminary arrangement. SEQUENCE OF ERECTION CONTD…………..

PRECAUTION Ultra Sonic testing of link pin. Wire rope, Pulley. Alert to road user through state authority. Full scaffolding, wire net to avoid falling hot rivet on road. Fencing by the side existing track. Round the clock watch man with flag on Road and Rail.

PROBLEMS ENCOUNTERED Problem during piling Problem during erection Working on monsoon No working on rainy day One way traffic Shifting of derrick material for dismantling of errection crane Dismantling of derrick

CONCLUSION The method of erection is very useful in multispan girder This method needs special equipments Method is very useful in case of RUB etc.where intermediate support is not feasible Needs well trained and experienced staff