Subpart CC 1926.1400. Qualified person means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Construction Crane Safety (new requirements 2010)
Working Around/Under Loads
Tower Crane Safety Regulations
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
Presenter Name Presenter Title Event Name
OSHA/C-DAC Requirements for Riggers & Signal Persons
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
§ – Subpart L Oklahoma State University2.
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Subpart R Steel Erection
Rigging, Signals, Power Line Safety & Assembly / Disassembly in Construction Safety Standard WAC This presentation is intended to “summarize” the.
Powered Platform Safety. © Business & Legal Reports, Inc Session Objectives You will be able to: Identify powered platform components Recognize.
Cranes and Slings Major Causes of Crane Accidents
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
OSHAX.org - The Unofficial Guide To the OSHA
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
OSHA 29 CFR Part 1926 Cranes & Derricks In Construction
Risk Engineering The proposed OSHA crane standard Zurich Services Corporation.
FALL PROTECTION. What, me worry? According to the US DOL, falls are the leading cause of worker fatalities in the construction industry. On average, between.
Morrow Equipment C O M P A N Y, L. L. C. Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA Peter Juhren Corporate Service.
EQUIPMENT SPOTTER TRAINING
Crane Operations Objective
<Insert Company Name>
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Crane Safety, Subpart N
Crane and Hoist Training
Cranes, Hoists and Truck Hoists
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Excavating and Lifting Part 3
LOCKOUT/TAGOUT.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction.
Fall Protection in the Roofing Industry
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Planning, First Aid and Working Conditions Section C of the Forest Activities Code.
Slide 1 (of 15) Aerial Lift Safety in Construction Michael McCann, PhD, CIH Director of Safety and Ergonomics The Center to Protect Workers’ Rights
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Electrical Safety.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Cranes and Slings 29 CFR and 184
1a.  Exposed part  Live or energized part  De-energized part 1a.
OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
Florida Marine Contractors Association
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Crane & Derricks In Construction
Crane Safety Standards
Cranes and Derricks Safety
Cranes, Derricks, Hoists, Elevators, and Conveyors - Subpart N Section 6 Robert Poole St. Paul Fire & Marine Insurance Company.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Presented by: ETTA, OSH Division,
Working Around/Under Loads
Lifting & Rigging Continuing Education Fourth Quarter 2016
Safe Rigging Practices
Overhead and mobile crane safety
Subpart M Fall Protection.
Personal Protective Equipment
Electrical Safety.
Presenter Name Presenter Title Event Name
10-hr. Construction – Cranes
Presentation transcript:

Subpart CC

Qualified person means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, successfully demonstrated the ability to solve/resolve problems relating to the subject matter, the work, or the project.

4 Signal person – when required: Point of operation not in full view of operator View of direction of travel is obstructed Site specific safety concerns Signal person qualifications Signal Types: Hand, voice, audible or “new” Only time an operator can use a cell phone is while lifting as part of a planned procedure

5 Signal person qualifications 3 rd party qualified evaluator Yes Employer Qualified Evaluator YesNo Qualified howDocumentationPortable

6 Qualification Requirements: Know & understand signals Competent in using signals Basic understanding of crane operation Verbal or written test + practical test

(r) Meets the criteria for a qualified person Possession of a recognized degree, certificate, or professional standing, or extensive (rigging) knowledge, training and experience Successfully demonstrated the ability to solve/resolve problems (relating to rigging)

Functional description Can hoist, Lower and Horizontally move a suspended load Forklifts configured to hoist and lower (by means of a winch OR hook) and horizontally move a suspended load are covered Backhoes are excluded even if used like a crane… (c)(2) Forklift with attached boom (c)(8) See if using equipment with a rated hoisting/lifting capacity of 2,000 pounds or less

10 Step 1: Identify Work Zone Work Zone = Marking boundaries OR 360 degrees around crane up to maximum working radius Make the power line hazard assessment

11 Could you get within 20 feet of power line? YESNO Option #1 Deenergize & Ground Encroachment Prevention measures Option #3 Ask Utility for Voltage and Use Table A ( with minimum clearance distance) Option #2 20 foot clearance No further action Planning meeting If tag lines used Non-conductive Elevated warning lines, barricade or line of signs PLUS (Choose one): Proximity alarm, spotter, warning device, range limiter, or insulating link

12 Table A – Minimum Clearance Distances Voltage (nominal, kV, alternating current) Minimum clearance distance (feet) up to 5010 over 50 to over 200 to over 350 to over 500 to over 750 to over 1000 (as established by the power line owner/operator or registered professional engineer who is a qualified person with respect to electrical power transmission and distribution)

Paragraph (b) requires the employer to consult with the utility owner/operator before deciding that it infeasible to deenergize and ground the lines or relocate them. Employer can establish this distance by either having the utility owner/operator determine the minimum clearance distance that must be maintained or by having a registered professional engineer who is a qualified person with respect to electrical transmission and distribution determine the minimum clearance distance that must be maintained.

14 Must show : Staying outside zone is infeasible Infeasible to de-energize and ground Intentionally Working Closer Than Table A Zone All of the following are required: 1.PL owner – sets minimum approach distance 2.Planning meeting – procedures 3.Dedicated spotter 4.Elevated warning line or barricade 5.Insulating link/device 6.Non-conductive rigging 7.Range limiter (if equipped) 8.Non-conductive tag line (if used) 9.Barricades - 10 feet from equipment 10.Limit access to essential employees 11.Ground crane 12.Deactivate automatic re-energizer

16 OPTION 1 OPTION 1: Accredited testing organization OPTION 2 OPTION 2: Employer qualification program OPTION 3 OPTION 3: U.S. military OPTION 4 OPTION 4: State/local gov’t license

17 Accredited testing organization YES *5 years Employer Qualification Program NO5 years US Military licenseNO *Set by issuing entity State/local licenseNO * Valid only in entity’s jurisdiction Set by issuing entity, not > 5 years PortableValid

Administered in any language understood by the operator candidate. Test must cover: Controls/performance characteristics Calculate capacity (w/ or w/out calculator) Preventing power line contact Ground support Read and locate info in operating manual Appendix Q subjects

Must be well designed and sufficiently comprehensive Must have the demonstrated the skills and knowledge needed to operate the equipment safely. An operator's ability to handle unusual worksite conditions, such as adverse weather or working on crowded jobsites, are hazards that are not commonly part of this exam.

An Operator who does not have a certification on August 8 th, 2014 will be considered an Operator in Training, regardless of previous experience. Must operate under the direct supervision of a Certified Operator Establishes the criteria when an Operator in Training may work. Rules for maximum time operating w/o a Certified Operator.

(b) Ground conditions must be firm, drained, and graded Use supporting materials, Use equipment manufacturer's specifications for adequate support Use equipment manufacturer's specifications for degree of level of the equipment

(c)(3) Must ensure that ground preparations are safe Must inform the user of the equipment and the operator of the location of known hazards beneath the equipment set-up area (such as voids, tanks, utilities) If there is no controlling entity then the employer that has authority at the site to make or arrange for ground preparations must do so.

Employers must use a qualified rigger for rigging operations during assembly & disassembly Two options: Manufacturer procedures or Employer procedures (criteria requirements). Employer procedures cannot be used if using synthetic rigging.

Must understand procedures Review procedures (unless they’ve used them before) Check that crew members understand their tasks, hazards Follow manufacturer’s prohibitions When using outriggers - fully extended or deployed per the load chart

25 A/D supervisor addresses 12 key hazards, including: Adequate site and ground conditions Sufficient blocking for load and stability Suitable boom and jib pick points Identify center of gravity Stability for pin removal Consider wind speed and weather

26 The suitability of blocking material Verification of the loads for assist cranes Snagging of cables or components Struck by counter weights Boom hoist brake failure Loss of backwards stability

27 Requirements for manufacturers to provide walkways and consider fall protection during design of machines. During non-A/D work employees must be tied off when exposed to a 6’ fall. When moving point-to-point on non-lattice booms On lattice booms that are not horizontal On horizontal lattice booms that have a fall distance of 15’ or more.

28 While at any workstation or any part of the equipment (including any boom), except when the employee is near the draw-works (when running), in the cab or on the deck. For A/D work the employer must supply and ensure that all employees on a walking/working surface with an unprotected edge more than 15’ above a lower level are protected from falls. EXCLUDING when working at or near the draw- works while the machine is running.

29 Modified or Repaired/ adjusted Qualified Post-assemblyQualified ShiftCompetent MonthlyCompetent AnnualQualified Type of Inspection: Who Inspects:

30 Shift = visual inspection for apparent deficiencies Monthly = documented shift inspection Annual = comprehensive, every 12 months

(d) Apparent deficiencies Control and Drive mechanisms Hydraulics Hooks Wire Rope Electrical Ground Conditions Levelness of the crane Operator view All Safety Devices Operational Aids are working

has many requirements. Some highlights are: Must not engage in any activity that diverts his/her attention while operating the equipment, No cell phones (other than when used for signal communications) Must not leave the controls while the load is suspended, (four exceptions) Must verify that the load is within the rated capacity of the equipment (2 methods) Must obey a stop (or emergency stop) signal, irrespective of who gives it. Told of any employee entering the crane work area (a)(3)

Employee Training Issues Powerline safety Signal persons Operators Competent Person Qualified Persons Crush Pinch point hazards Tagout for repair Must confirm that the employee understands the information provided in the training Provide the training at no cost to the employee

Train each employee assigned to work on or near the equipment Erect and maintain control lines, warning lines, railings or similar barriers to mark the boundaries of the hazard area (1 Exception)