RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
1 Video, Voice, and Broadband Connectivity Solutions -1- MDU Networking using CORINEX products including the new 600 Mbps Corinex MDU Gateway!
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 17th April 2015.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Standalone Commissioning Plan in MICE Hall K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review 9th Sept 2016.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
LCLS-II High Power RF L1-L3 Spaces Review Andy Haase Feb
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Two-beam module layout
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
SPL RF coupler: integration aspects
MICE CM28 Engineering Session Summary (On behalf of Wing)
Schedule CM SPS G.Vandoni.
RF Layout 3pi/2 for Discussion
Experimental hall design in Japanese site
Warm Vessel South Wall Installation, Sub-assembly Option
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Additional Upstream Coil Shielding
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

RF Layout 3pi/2 for Discussion

2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South RF couplers Already have the 6” coax to go over the wall No advantage in going through the wall Flexible coax Line Trimmers Hybrid Splitter Directional Coupler in each line 4616 Pre Amplifier TH116 Amplifier 500kw Dummy Load Directional Coupler 6 inch

3 RF Design mtg 14/1/15 MTA advised not to use ‘T’ splitters, suggested hybrid splitter was a far better solution as it isolated the cavity couplers from each other. Propose to have 1off dummy load on the hybrid splitter to each RF cavity.

4 RF Design mtg 14/1/15 2 nd TH116 amplifier moved to 3 rd position behind wall to use the space and ease installation in congested area Sufficient space on wall for additional identical water services panel……John Govans would like to modify existing panel.

5 RF Design mtg 14/1/15 Crane hook height fully retracted will not clash with the coax Option for crane operation maybe to skate equipment under high level coax line Services to dummy loads not yet been considered……need to speak to Jason

6 RF Design mtg 14/1/15

7 Some clashes with existing vacuum shield current scheme. Hybrids splitters can move upstream & downstream to avoid clash, achieved by setting correct rotation angles on coax lines Suggest mounting coax supports off PRY steel work…….need to liaise with Jason & Steve Plate

8 Comments Output line from amplifier is lower than the PRY needs to go high to clear PRY to couple to South RF couplers. No advantage of going through the wall. Crane hook height fully retracted will not clash with the coax. May need to skate loads under high level coax lines to avoid venting and refilling with SF6. Directional couplers included in layout 3 in total (1 off 6 inch, 2off 4 inch)…..these have been delivered 4” flexible coax 1m long shown in vertical lines…..these have been delivered Line trimmers to take up any length corrections…..these have been delivered Hybrid shown with existing 500KW loads (2off) …..these have been delivered Moved the second amplifier to position 3 behind wall to allow more space Run coax in 6inch as far as possible to the flexible coax line Will require additional and/or modified 6inch coax line lengths Current scheme is 4” coax under floor, be very difficult to run 6” coax under the floor Need to model the hybrid path lengths in the coax line….this will shift the RF distribution central axis off the cooling channel central axis