3. Hyper Container Crane Elevation platform 1818 No. 2 TrolleyNo. 1 Trolley 1. Productivity 40% increase. (More than 60 boxes/H) 2. The container is transferred.

Slides:



Advertisements
Similar presentations
Photogrammetry 1 1.
Advertisements

Unit 10 - Stairway Construction
Money, Interest Rate and Inflation
© Easy Guides Australia National Edition START PRESENTATION QUIT PRESENTATION.
Feedmill Report; Quick Scan. 28 March 2013 Location of the plant.  The total area of the place is about 7 hectares which has several land register references,
1 Second Safety Council Meeting Tucson April 2014 Name of Meeting Location Date - Change in Slide Master Dome Hazard Analysis Discussion Jacques.
Ashore fall protection system for cranes Naval Facilities Engineer Command Southwest, San Diego, CA.
Contour Lines.
© Easy Guides Australia A Pallet Truck is: a truck designed to lift and transport goods on a standard pallet or platform. They can be manually or power.
Entropy. Energy Quality  You are offered 1000 J of energy. Would you rather have it as A) mechanical work A) mechanical work B) frictional work B) frictional.
1_3 Velocity time graphs Find the area of these shapes. 03 September Find the gradient of these lines yxyx.
Light Gates –To Collect Data Not Connected To Computer 1.Press enter to select timing 2.Press or to select Set Timing Mode 3.Press Enter 4.Press or to.
WBRS in Operation. Solution: utilize deckhead mounted handling hardware developed for seismic survey vessels. Many of these vessels have 2 mission bays.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
Seismic Damage for Quayside Crane in the case of Hanshin(Japan) Earthquake The earthquake that struck Hyogo Prefecture, Japan in 1995 caused breakage.
Movement Notes – Stage Pictures Stage Pictures and Emphasis.
High productivity Quayside crane 12. Efficient operation and Short cycle time of QC 1. Anti-skew Control -Dynamic Skew Control Stable against Wind and.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.
The Cut Cone. The given views show the Front Elevation and part Plan of a cut cone. Draw the following views :- Complete Plan End Elevation Development.
A.P. MOLLER-MAERSK GROUP 8th PORT LOGISTICS CONFERENCE Barcelona June 5, 2008 The Gigantism of Container Ships Capt. Laurids Uglvig Chief Operations Officer.
Maintenance Safety. Maintenance Problems n Operative usually works in dangerous areas from which others are usually excluded by various safety barriers.
Still Life. Contour Line Drawing Using only lines to draw an object. Draw all of the elevation and the important detail.
Tides Tides, or the rising and falling of the sea surface level, have a dominant effect on marine life on nearshore and coastal areas. The two factors.
Fiscal Policy & The Multiplier Chapter Fiscal policy & The Multiplier  Fiscal policy has a multiplier effect on the economy.  Expansionary fiscal.
Providing Service to High-rise Condominiums Presenter Charles L. Kahanek SWEDE Conference Horseshoe Bay, Texas May 2008.
Earthquake safety 2-4. Earthquake risk Determined by locating where faults are active and where past earthquakes have occurred High risk on West coast.
1. Magic Eye High productivity 1. Efficient lowering speed control
Or : Why doesn’t my GPS elevation agree with other measurements of elevation?
Chapter 11: Strategic Leadership Chapter 13 Equipment used in facilities.
Lesson 3: Earth’s Surface. Ocean and Continents Earth’s surface is made of oceans and continents. Oceans cover more than 70% of Earth surface.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
HOW TO SHIFT CHEMICALS FROM ONE LAB TO ANOTHER? Chemical Transfer.
SiD nominal mass: Barrel 5000 T; (each) Door 2500 T Dimensions: Z = 20.0 m X = 20.0 m Delta Y = 9 m (Top of Platform to beamline) Positioning Tolerance.
Energy. Potential and Kinetic Energy.. Energy Mechanical Energy: the energy due to the position of something, or the movement of something. Two main forms.
Reducing a Set Covering Matrix. S I T E S Cost Areas
Energy, Work and Power. Work, Energy and Power Objectives: Describe the relationship between work and energy Calculate the work done by a constant applied.
EPPM2033 COST ACCOUNTING INDIVIDUAL ASSIGNMENT. Price spent to keep and maintain a stock of goods in storage.
SHREE S’AD VIDYA MANDAL INSTITUTE OF TECHNOLOGY
© Steven Kazlowski/SuperStock 1 Web Search How big is the average human? What units might you use to describe weight and height? 2 Web Search How.
Area of Squares, Rectangles, & Parallelograms. What is Area? Area is the space a shape covers, or takes up Area is the number of square units equal in.
Experiment (2) Determination of the Heat of Neutralization of Strong Acid with a Strong Base.
Basis of Scenario Changing Shopping Patterns –Evidence of a shift to shopping via out-of-state vendors –Out-of-state taxable retail purchases have almost.
VOLUME REVIEW. If r=7 units and x=7 units, then what is the volume of the cylinder shown below? r x.
Basics Of Topographic Maps. Topographic Maps (Contour Maps or Relief Maps) Two dimensional model of the Earth’s surface that represents 3-D world Show.
Small ( Mini) Incubators
SECTIONAL VIEWS.
Plan for the installation of the TAMU screen
Aim: How to solve calorimetry problems?
Cranes + Scaffolds can = Incidents
GPS Based Earthquake Detection And Warning System
Kinetic and Gravitational Potential Energy
Mountain Peaks.
Mean of Grouped Data OCR Stage 6.
AGV Navigation and Traffic Control
The Nature and Properties of Waves
البيئة السياسية للإدارة الدولية
قاعدة الترتيب الأساسية ( مبدأ العد ) التباديل التوافيق
Calculating the Area of a Right Triangle
AIR TEMPERATURE.
Entropy.
12.5 Volume of Pyramids and Cones
EDLC(Embedded system Development Life Cycle ).
Power, and Efficiency Physics 11.
Sample Stories Uses: Practical and Real
Chapter 7 Work.
7.1 Work.
Table 1 * Statistically significant result Statement Average score:
Orthographic Projections
Unit 4. Day 13..
AOSC 200 Lesson 5.
Presentation transcript:

3. Hyper Container Crane Elevation platform 1818 No. 2 TrolleyNo. 1 Trolley 1. Productivity 40% increase. (More than 60 boxes/H) 2. The container is transferred via the elevation platform between two trolleys. 3. The height of platform is automatically selected to equalize the cycle time of two trolleys.

3. Hyper Container Crane 1919

 Without bay shifting, hatch cover operation  Average of on-deck and hold operation in 1 bay Operation productivity : 40 % UP (Theoretically) 3. Hyper Container Crane 2020

Seismic Isolation System for Mitsubishi Quayside Crane Seismic Isolation System 2121