3. Hyper Container Crane Elevation platform 1818 No. 2 TrolleyNo. 1 Trolley 1. Productivity 40% increase. (More than 60 boxes/H) 2. The container is transferred via the elevation platform between two trolleys. 3. The height of platform is automatically selected to equalize the cycle time of two trolleys.
3. Hyper Container Crane 1919
Without bay shifting, hatch cover operation Average of on-deck and hold operation in 1 bay Operation productivity : 40 % UP (Theoretically) 3. Hyper Container Crane 2020
Seismic Isolation System for Mitsubishi Quayside Crane Seismic Isolation System 2121