1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20.

Slides:



Advertisements
Similar presentations
Static Electricity Rare Occurrence or Common Hazard?
Advertisements

Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
International Paper - Riegelwood Plant Riegelwood, NC
City of Traverse City Snow Removal Operations. Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency.
Environmental Initiatives
History W. O. Grubb is the leading provider of crane rental and steel erection services in the East Coast and Midwest. W.O. Grubb was founded in the 1960's.
Department of Natural Resources Protect 13 millions acres from fire Manage 2.1 million acres of forest land Manage 2.6 million acres of aquatic lands.
Access Road Stern Bow Suggested lay down area. Looking from bow down port side of vessel to the stern Non detect, clean overburden.
“Changing Industry Demands Redesign the OSV’s” 1 This paper was first presented at the “ 4 th International Conference on Technology and Operation of Offshore.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
Institute of Chemical Engineering page 1 Achema 2012 Thermal Process Engineering HyTime - Low temperature hydrogen production from second generation biomass.
2009 Hurricane Prep (What's The Same) Generator tests Personnel lists Fuel Emergency Equipment.
1 Julie S. Janson, President Duke Energy Ohio, Inc. and Duke Energy Kentucky, Inc. May 20, 2010.
Yards Creek Rotor Poles
Insight Into Wind Turbine Installations Presented By: Murray Westerberg.
Chapter 5 Construction Tools and Equipment. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Differentiate.
Industry Competency Training
Contractor Safety Training | Westbrook | 1 Emergency Response.
Helix Turbine patent pending - zero gravity drive train sustainable
City of Alexandria Planning Commission October 4, 2011 ASA Expansion DSUP
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
Kaitlynn Lanter Period 5. Wind Energy  I have chosen wind energy for this project due to the fact that wind energy is a low cost method of power.
1.  The company was founded in 1965 as a private company by the share owner Mr Meir Shriki. 2.
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
Presentation on Derived Demand Industry- Steel Presented by Shruti Bagchi Rewati Rane Sayan Mukherjee Tarun Roy Praveen Gupta.
NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Safety Awareness for responders to Hurricane Katrina Operations: Ship Breaking.
Material Handling. MATERIAL HANDLING Objectives A. Reduce Unit Material Handling Cost  Eliminate Unnecessary Handling  Handle Material in Batch Lots.
Safety on Call FATAL INCIDENT REVIEW. Safety on Call FALL THROUGH SNOW COVERED SKYLIGHT.
GRITHOG SAND CONTROL SYSTEMS LTD. : ECONOMIC SOLIDS HANDLING.
Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
11. 2 Steam Energy Energy that comes from the push of steam.
West Ox Bus Operations Center Fairfax County Department of Transportation July 21, 2015.
8:30am: start of activities in clean room: sticking foam pads to SX covers.
 1 Supervisor  4 EQUIPMENT Operators  2 Maintenance Workers  Total Annual Labor Cost: $324,845  Includes Overhead.
Engineering and Design Taylor Wakeland, Hannah Fisher, Rachael Kugler, Dawn Chambers.
University medical center Keeping our community safe.
Wind Turbine Power Plant. Sources ●
PARTICULATE MATTER: REGULATORY RESPONSE Presented by: Karl Loos.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Storage Activities Nov Preparation for transportation of Turbines 2.
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company Complete solution provider for METAL FABRICATION & ASSEMBLY.
1. You need to water as a fuel which is cheaper, easier, and fuelonline. 2. Do not result in air pollution from smoke and pollution of the environment.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
Power washing Services in Edmonton. blasttech.ca provides liquid waste removal, power and pressure washing services in Edmonton, Nisku and surrounding areas. For further assistance call us at
Uses of solar energy
A CLEAR SOLUTION FOR TROUBLED WATER
A Guide to Mass transfer equations
Cranes + Scaffolds can = Incidents
ASU Lab Closures and Remedial Actions
Vapour is committed to “Cleaner Environment and Conserve Energy,” two areas vital for the World. We support Industry to be Environment – friendly and Energy.
Hire Scrubber Drier for Floor Cleaning If you're looking to get rid of stubborn dirt, then use scrubber dryer that not only scrub off the dirt from the.
WIND TURBINE GENERATORS.
Material Handling Material Handling –
Construction 101 Start to Finish
ASU Lab Closures and Remedial Actions
CONTRACT EQUIPMENT & CREWS
Unit 2 Changes in Matter 1.
Thinking Green Alternative Energy.
Most commercially produced soap is not soap at all but chemical detergents, or a mixture of detergents and soap which can.
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Farm Input Costs.
Texas Mutual Assistance Group Presentation
Energy Environment ENVE 411 Energy conversions.
Northeast High-Level Radioactive Waste Transportation Task Force
Oil Field Contractor Fatality Case Study
Robot Deployment System
Machinery and equipment continued
Presentation transcript:

Unit 1 Lay down Areas 1- Contactor Parking 2- Contactor Parking 3- Duke Energy Employee Parking 4- Turbine Crew Trailers and Equipment 5- Turbine Crews 6- Turbine Crew and AGT (Entire Turbine Deck) 7- Mobile Crane and Chemical Cleaning Tanks 8- Turbine Crew 9- Scaffolding lay down area 10- SCR Prep Area 11- Crane for APH AND Economizer work 12- IRWIN trailer 13- Contractor Entrance

Unit 1 Lay down Areas 14- Scrubber Scaffolding Lay down 15- Scrubber Contractor Parking (Limited) 16- Contractor Expansion Joints lay down 17- Fuel handling Building (Turbine Crew) 18- Lay Down area for APH and Economizer 19- NDE Trailer 20- NDE and EDDY Current trailers