The Growing Power Needs in Orange County Source: U.S. Census / SDG&E Energy demand in Orange County has more than tripled over the last 26 years: 141 MW in MW in 2010
South Orange County Needs Power Reliability
Goals for the South Orange County Reliability Enhancement Provides System Reliability Upgrades Outdated Equipment Meets Needs of Residents & Businesses Needed to Meet Federal and State Energy Regulations
Rebuild San Juan Capistrano Substation, which was built in the 1950’s Upgrade Transmission Lines 138 kV to 230 kV Replace existing structures with taller, new steel poles The South Orange County Reliability Enhancement
South OC Substation Arrangement – Today
Future South OC Substation Arrangement
Proposed Route Along Existing Transmission Corridor
Rancho Madrina - Today
Rancho Madrina - Concept
San Juan Capistrano Substation in the 1950’s
San Juan Capistrano Substation Today
San Juan Capistrano Substation - Concept
Proposed Permitting and Construction Schedule CPUC FilingMay 18, 2012 Scoping MeetingsJanuary 23 / Draft EIRQ3 – 2013 Final EIRQ4 – 2013 CPUC DecisionQ4 – – 2017Rebuild SJC Substation Transmission Line Replacement All Dates are Estimate