Chris Adolphsen. Department Programs International Linear Collider (ILC) –All ILC areas except for ATF2 (APE and Test Facilities) FNAL Project X –L-band.

Slides:



Advertisements
Similar presentations
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Feng Zhou Thank Brachmann, Decker, Ding, Huang, Loos, Raubenheimer, Turner et al for the contributions March 6, 2013 Recent LCLS injector studies & plans.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Low Emittance RF Gun Developments for PAL-XFEL
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
LARP Phase II Secondary Collimator RC1
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
LARP Phase II Secondary Collimator RC1
SuperB Injection, RF stations, Vibration and Operations
WP11: electron and proton beam testing
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
CLIC-ILC BDS & MDI work.
23 April 2012 Tom Markiewicz/SLAC
Electron Source Configuration
Summary for the Sources working group
Andrei Seryi Materials for discussion TILC-08
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
Advanced Research Electron Accelerator Laboratory
LARP Phase II Secondary Collimator RC-1
Accelerator R&D Results from the B-factory
Status of CTC activities for the Damping rings
Barry Barish Paris ICHEP 24-July-10
LARP Phase II Secondary Collimator RC-0 and RC-1
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Chris Adolphsen

Department Programs International Linear Collider (ILC) –All ILC areas except for ATF2 (APE and Test Facilities) FNAL Project X –L-band CW (650 MHz) and Pulse rf (1.3 GHz) sources, … LARP –Rotatable Collimator –UA9 Crystal Collimation –… SuperB –IR Design –Ring RF –…. X-band –CLIC Structure Tests –X-band Gun Development –X-band Linac Driven Light Sources (MEGa-ray, MaRIE, …) –…. Support for FACET, LCLS, Controls Upgrade, …

Klystron Cluster Scheme Tests Resonantly power a 0.5 m diameter, pressurized (1 atm N2), 10 m long aluminum pipe to 300 MW TE01 mode field equivalent in 1 ms pulses

Time of Position 2 markers (T1,T2) are ~ 1 ms later than those from Position 1, which suggest events are much closer to Position 1 (5 m / 5100 m/s ~ 1 ms) T1 T2 Acoustic Sensor Breakdown Localization CTO KW input power yields 300 MW equivalent surface fields in the pipe - see bkd every ~ 15 hours, maybe from CTO or upstream – rate seems very pressure dependent ‘Big Pipe’ Operation

Next: 160 m Resonate Ring

Status of ILC e- Source Laser System Development Two similar laser systems are being developed: 1.SLAC design 2.SBIR laser system (KM Labs) Both systems share similar challenges –CW amplifier pump lasers KM Labs system has been operational at 1.5 MHz at KM Labs facility  inspected in October 2010 Delivery in December 2010 KM Labs and SLAC systems are now in the process of installation at SLAC’s ILC ITF After KM lasers running at 1.5 MHz, will do a gun test and then augment the PI pumps with the Coherent lasers to bring the KM system up to 3 MHz

KM Labs System Installation Top Left: JohnS at KM Labs in Boulder, CO in October Top Right: the laser being brought into B006 in December Bottom: the laser on the table in Rm 107, B006 wherein we have tested the Photonics Industries (PI) green pump lasers. One of these work, one of these has low output.

Gun Development at JLab Inverted Insulator Cathode Anode NEGs and Ground Screen Anode Feedthrough JLab's Inverted gun design Conditioned to 150kV without observed field emission

ILC DR Electron Cloud Working Group Tasks & Status Reduced DR Circumference – ILC Low Power Scenario Evaluation of reducing the DR circumference to one-half that specified for the RDR Corresponding reduction in bunch count to one-half of the RDR specification Baseline Mitigation Recommendation Evaluation of EC Mitigation R&D Results Identify the most promising mitigation schemes Identify candidates and issues for further R&D Restored Bunch Count Evaluation of options to restore the RDR bunch count for high luminosity operation Identify safe path to restore bunch count Evaluate performance limits in low power configuration March 2010 October 2010 Under Evaluation Participating Institutions: ANL, Cornell, INFN, KEK, LBNL, SLAC Working Group coordinated by SLAC (M.Pivi).

Electron Cloud Mitigation Options 10 Clearing Electrodes KEKB Grooves w/TiN coating Clearing Electrode C ESR TA Grooves on CuAfter extended operation Stable Structures Reliable Feedthroughs Manufacturing Techniques & Quality

Lanfa Quadrupole Region Evaluation for the 3.2km DR for Possible High Current Operation Need SEY~1 or better in quadrupoles with short bunch spacings Need to understand antechamber role CLOUDLAND simulations (L.Wang, SLAC) ECLOUD10 Workshop

MDI Work in Progress Hall Design, Detector & Platform Vibration Analysis, “R20” Package w/ QD0 mover system, Frequency Scanning Interferometry Alignment

First Simulations of a Network of Launch Points and Retroreflectors for QD0 K. Riles – U. Michigan

Vibration Measurement System to Support ILC MDI R&D: Testing on the SLD Detector Andrei Seryi’s old vibration measurement system has been resuscitated Custom battery-operated preamps have been built System noise level is very low: ~0.25 nm RMS (integrated power > 1 Hz)

SLAC Rotatable Collimator for LHC Ratchet Gear Drive RC-0 Jaw (copper) RC-1 Jaw (Glidcop) LHC IR7 Style BPM Buttons 4 per end LHC IR7 Style BPM Buttons 4 per end Flex Support Tank geometry allows a 60mm facet-to-facet gap in fully retracted Jaw position Tank geometry allows a 60mm facet-to-facet gap in fully retracted Jaw position Ferrite could mount to Base Plate facing Jaw facet Ferrite could mount to Base Plate facing Jaw facet BPM assemblies at each end are fiducialized to Collimator Base Plate Drive Mechanism RF foils carry image current and shields Rot. Mech.

Status In Q1 FY11, mechanical work included the rebuild of the RF rotation mechanism on one of the jaws and the final reassembly/rebuild of the drives with W-S2 coated bearings. The new design was tested to x5 anticipated torque required for rotation. The four bellows were vacuum fired and welded on. Leak checking showed 9-scale vacuum.

Current Near Term R&D Plan Ship first rotatable collimator prototype to CERN ASAP Mechanical, vacuum & impedance tests by CERN personnel Installation in SPS during technical stop of LHC  Location identified Beam tests of prototype in SPS in early 2011  Impedance  Operation Robustness tests in HiRadMat Facility ~ Summer 2011: 1 MJoule per accidental beam-abort  Test extent of damage: molten & gaseous debris, hit face, adjacent face..  Permanent shock induced deformation of jaw  Operation of rotation drive & integrity of water circuits after impact(s)

SuperB Interaction Region m Developed a scheme for solenoid compensation that involves rotating the PMs as well as cancelling the detector field as much as possible Recently, an orbit and skew correction scheme was developed to enable the machine to run with the detector field off using the same compensation hardware

Non-RF Bunch Linearizer for a All-X-Band Linac Yipeng Sun

Simulations for 250 pC Bunches BC1:over-compressBC2:under-compress Yipeng Sun

Use of Truncated Gaussian Laser Profile to Reduce LCLS Emittance Can improve LCLS projected and slice emittance 20%+ It is supported by theoretical analysis - space charge forces are more linear in the Gaussian-cut case. Scheduled to LCLS beam verification in late February.  x/r=0.5  x/r=1.0  x/r=10 F. Zhou, P. Emma, and Z. Huang