David Perkins Seabrook Station Biweekly Airborne Sampling.

Slides:



Advertisements
Similar presentations
Volvo CareTrack – Telematics System
Advertisements

Digital Ship at Posidonia June 2006 in Association with AMMITEC CBM
Energy Efficient Steam Systems
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
EMS ROMC Environment monitoring system for ROMC..
Aspirated Smoke Detection
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
DRIP DISPERSAL SYSTEMS Problems and Solutions. Flow Equalization Surges in the ATU during peak loading are a major cause of filter clogging in a drip.
Utility Savings & Management “Back-to-Basics” Presented by: Clean ‘07 Las Vegas, NV / June 13, 2007.
Home Area Networks …Expect More Mohan Wanchoo Jasmine Systems, Inc.
1 Comparison of Analog vs. Advance Technology Air Sampling System Designs To Facilitate Correction of Measured or Calculated Volumes to a Set of Reference.
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Diesel Generator Reliability: Lessons Learned from Storms
Transferring Inductive Type Loads John J. Stark Marketing Services Coordinator, Russelectric Inc. (Refer to Russelectric Technical Brief: “Eliminating.
Reducing Emissions When Taking Compressors Off-line Lessons Learned from Natural Gas STAR Transmission Technology Transfer Workshop Duke Energy Gas Transmission,
Complete, Modular, Ready Today 1 Discussions of Modular Sample System Implementation in S. California Refineries.
Asa Parker Geovanny Rodriguez Jase Skellie Cow Power MOM (Monitoring and Operating Module) CVPS Contacts: David Dunn Rob Nelson Faculty Mentor: Josh Bongard.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Sand media filtration is one of the oldest filter processes in the world. Water Tool Modular Filters have made extensive improvements to what is presently.
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Lease Automatic Custody Transfer
Overview of the 1.
© Philadelphia Scientific 2004 A Case Study: Four Years of Performance Data at a Canadian Rehydration and Catalyst Addition Site Harold A. Vanasse – Philadelphia.
SCADA and Telemetry Presented By:.
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
InnovationValueTeamwork SHENZHEN INVT ELECTRIC CO., LTD.
Power Line Carrier Communication based Automated Meter Reading System
BioWin ®. Bio Gas – The alternative energy source of the future! BioWin ® - Bio Gas Analysis of the future!
CMMS: Integration With Other Information Sources Steve Shores, Vice President Asset Management Solutions The DEI Group Operations/Maintenance Partnership:
© 2008 Data Power Services, LLC By: Tom Taranto 2010 Energy Expo Hosted by National Grid NYSERDA Reducing Compressed Air Energy Cost Using a Systems Approach.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Mitigation Dust Loading REMP Air Samplers. Dust Loading Definition / Symptoms Accumulation of loose particulate matter on air sampling particulate filter.
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Bloodhound™ Logging System Infrared™ Hydrocarbon Analyzer System 0-100% auto ranging Total gas with Chromatograph model- C1-C4 iso and C4 normal Accurate.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Med Gas Survey: Top Items Found Presented By: Larry Schutt, ASSE 6020,6030,6035,6040 Medical Gas Technical Services.
ORNL is managed by UT-Battelle for the US Department of Energy 2-K Pump Down Studies at SNS Presented at the CEC/ICMC 2015 – C3OrA Matthew Howell SCL Systems.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
Click left mouse button to advance, “back” to return Phasefale November 2007 Presscon Network Click left mouse button to advance, “back” to return.
Senior Design Project Update 1/29/14 Jake Bumpus, Casey Fitzgerald, and Michael Schultis.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
Utility Engineers, PC.  Generation  Transmission  Distribution.
CUE – Make Any Pump an E-Pump
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
1 Injection Moulding Energy-saving SHENZHEN INVT ELECTRIC CO.,LTD.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
S0LAR AUTOMATIC RAILWAY TRACK CRACK DETECTING VEHICLE
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
RESPIRATORY TRAINING. Objectives + Why are respirators are necessary + Capabilities & Limitations + Inspecting & Maintaining + Medical Clearance & Fit.
Introduction of Laser Evaluating Technology to Street Leak Surveys Ashraf Salha APA Group Gas Speak Colloquium September 2015.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
SGC-250 Synchronous Generator Controller
Chiller Energy Audit Welcome remarks TBD..
How SCADA Systems Work?.
William Little Head of Key Accounts - Operations
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Trane Care Energy RTHD Adaptive Frequency Drive retrofit.
William Little Head of Key Accounts - Operations
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Presentation transcript:

David Perkins Seabrook Station Biweekly Airborne Sampling

Objectives Improve system reliability Improve regulatory confidence Reduce out-of-service time Improve program efficiency and maintain a system of continuous sampling.

Bi-weekly Sample Feasibility Ability to increase sample frequency Equipment reliability Ability to achieve sensitivity for short-lived isotopes Impact on charcoal efficiency Excess filter loading Eliminate missed samples

What We Found Remotely monitor equipment with telemetry and vacuum sensing transducer Maintain equipment with preventative maintenance Evaluation of I-131confirmed ability to achieve comparable sensitivity during 2-week collection period Charcoal efficiency testing for 2-week run time successful Effluent program informs REMP when I-131 release limits are exceeded for sample frequency adjustments

Automatic Remote Monitoring

Remote System Monitoring Reliability Capabilities Immediate problem notification Power outages Filter loading Equipment failure Cost effective

Telemetric T646 MicroRTU Off-the-shelf proven technology Six digital inputs, four analog inputs; six control outputs Automatically communicates pressure, flow and other sensing signals Capable of alert and alarm functions Operating parameters are remotely programmable and remotely selectable Low cost to buy and operate

How Telemetric Solution Works

Flow Diagram with Telemetry

Alarms/Response

Equipment Maintenance

Equipment Arrangement

Preventive maintenance Rebuild pumps –annually Calibrate gas meters –semi-annually Verify air flow –semi-annually or as needed Inspect equipment for degradation –bi-weekly

Equipment Upgrades

Filter Loading & Charcoal Efficiency

Filter Load Trend Plot Filter change

Rock Pile 1-Week & 2-Week 1-Week March Week June 2004

Filter Load Trend Plot Filter change

Plate Yard 2-Week June 2004

Charcoal Efficiency Testing Sample cartridges tested for 336 hours –3 tests performed –2 cfm flow rate –Test method, ASTM D Results equal to or better than 99.30%

I-131and 2-Week Sample Cycle

I-131 Decay 1-week Vs. 2-week air sampling cycle Hypothetical models –Assuming chronic air concentrations –MDA equal to or better than the 1-week cycle. –Higher collection factor compensates for decay –Modest air flow increase

Iodine Decay 1-week Vs. 2-week air sampling cycle Models show increased collection factors for flow rates 1-week flow rate2-week flow rateActivity increaseRatio 2wk : 1wk 1.0 cfm1.8 cfm2.79 times cfm1.5 cfm2.31 times cfm2.7 cfm2.86 times cfm1.5 cfm1.55 times0.55

Administrative Controls REMP evaluates the need for increased sampling when: –ODCM monthly and instantaneous limits are exceeded –Failed fuel –Outages

How is 2-Week Sampling working ? Saved missed samples and out-of-service time –Utility turned power supply off without notification Contacted utility and loss of power restored in 2-hours 150 hours of OOS time saved –Equipment problem discovered Low pressure detected from tube connection leak 72 hours of OOS time saved System performs more reliably Filter loading is monitored more closely –Slightly increasing over 2-weeks, but NOT excessively

Questions?