The Mythical Man Month “Plan to throw one away”. “Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Safety SAFETY. Protecting Privacy  Don’t broadcast your location.  You Tube settings  Read privacy policies  Real names?  Revealing your status.
The Three Little Pigs Story by.
Imran Hussain University of Management and Technology (UMT)
The Tacoma Narrows Bridge(s) Click to continue…. The original Tacoma Narrows Bridge was built between November 1938 and July 1, 1940.
Warm-up: Solve for x and classify the triangle. (5x + 2) (6x + 5) (4x + 8) (9x + 7) (4x + 8) (9 – x)
Software Engineering Saeed Akhtar The University of Lahore Lecture 4 Originally shared for: mashhoood.webs.com.
TIME FRAME. Which time frame should you choose? Move down method -Start from the daily charts, once profitable move down to -H4 -H1 -30min -15min -5min.
Civil engineers are involved with the design of many structures being, roadways, buildings, tunnels, airports, waste water, water supply plants, and so.
Creating Interactive Course Assignment Pages The OSU Libraries ICAP Project Coalition for Networked Information Fall 2007 Task Force Meeting Kim Griggs,
1 Chapter 3 Project Management. 2 The 4 P’s  People — the most important element of a successful project  Product — the software to be built  Process.
BY SEMIRINDI MAKALA Plan to Throw One Away. Pilot Plants and Scaling up What is a pilot plant ? A pilot plant is an intermediate step that is necessary.
Lesson 4 (Writing Equations from Word Problems)  How do you write equations from word problems?  First, highlight or underline all important information.
The Tacoma Bridge, Past to Present By: Raquel Escatel May 12, Presentation.
CAN WE DO IT ??? TENNIS BALL EXERCISE. Tennis Ball Exercise  Play 4 Rounds  3 or 4 equal groups (a good size is 7 to 10 people)  Each group will use.
Earthlings Doing Earth Things. Chorus Earthlings doing earth things Caring for the good things that the earth brings Every living thing needs an earthling.
Rotational Name Design
Project Identification and Selection
Copyright © 2007 by Marline E. Pearson. All Rights Reserved. Lesson Five Principles of Smart Relationships.
Find someone you do not know and: 1. Tell them who you are and what you do 2. Discuss a time when you or someone in your family moved. Put a pin in the.
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
The impact of change in Web-based IR systems on users' experience Dr. Sanda Erdelez School of Information Science and Learning Technologies University.
Blended approaches to learning at PATH Amanda Zehnder Organizational Training and HR Project Manager.
YOU WILL ANYHOW CHAPTER 11 Plan To Throw One Away.
1/23 Prescriptive Process Models. 2/23 Prescriptive Models Prescriptive process models advocate an orderly approach to software engineering Prescriptive.
Chapter 7 Interactive Design and Prototyping Human Performance Engineering Robert W. Bailey, Ph.D. Third Edition.
Welcome to Planit and the world of internal communications planning at BP.
By Garrett Kelly.  “There is nothing in this world constant but inconstancy.” – Swift  “It is common sense to take a method and try it. If it fails,
Suspension Bridge Hole – in – One Contest Put Name(s) Here.
Chapter 4 프로세스 모델 Process Models
Common Assessment Framework and Self Assessment Questionnaire The Common Assessment Framework that was talked about earlier in the year is being tried.
S OFTWARE P ROTOTYPING C HAPTER 4. SOFTWARE PROTOTYPING Prototype: Customers and end-users of the system find it difficult to express their real requirements.
© The McGraw-Hill Companies, Software Project Management 4th Edition Selection of an appropriate project approach Chapter 4.
牛津版 高三 模块十 Unit 1 Building the future. Welcome to the unit.
DeviceProfileTime MoneyData It is the user’s:
CMS II: Personnel. The Core Issues People are your most valuable asset. If you don’t have the right people, you’ll never do anything great. By the same.
Lesson 7 Selling Landscape Design and Construction Work.
Chapter Eighteen Proposition of the Mythical Man Month: True or False?
Managing Transitions: Making the Most of Change William Bridges Author of the best selling Transitions.
Endangered species By Justin K Facts and Solutions factssolutions.
How to write a Book Review. Readers don’t have to know everything that happens in your book, or all of your reasons for liking it. Try to say enough so.
© Hamilton Trust Keeping Up Term 1 Week 9 Day 2 Objectives: Find factors of two-digit numbers; Identify multiples of 2, 3, 4, 5, 6, 7 and 9.
BRIDGES Bridges have changed the quality of life for people.
Make a report of your partners’ learning routines.
Exception testing Aistis Karkauskas, IFM-2/2. Introduction  Exceptions – anomalous or exceptional events requiring special processing – often changing.
Cut down on the time it takes employees to process invoices using Square 9’s SmartSearch integration with Microsoft Dynamics GP. SmartSearch allows invoice.
Countdown to Disaster The collapse of the Tacoma Narrows Bridge By Group 4.
Child Development Project Instructions: Pg. 1 1.Within the article, you will be focusing on Developmental Milestones 2.The Author lists the various types.
You will be able to describe the term textual programming. You will be able to demonstrate a basic level of textual programming skills by creating a simple.
Configuration Management
Multiplying and Dividing Decimals by 10, 100, and 1,000
Project Management Processes
Configuration Management
From Seed to Plant by Gail Gibbons
Unit Organizer Template

What is your FICO IQ Quiz? Link to article attached.
History, Purpose And Why Is Software Testing Being Outsourced.
Multiplying and Dividing Decimals by 10, 100, and 1,000
Price wars are bad, especially with high fixed costs.
Sustainability By B.V.K.
How to fail at delivering software
Project Management Processes
Engineering responsibilities in Disasters
1 1.What is the Author’s point?
Multiplying and Dividing Decimals by 10, 100, and 1,000
Implementing Agile in Government
ADVANTAGES OF CONTRACT MANAGEMENT SOFTWARE Contract management software is a vital tool used to make businesses run more organized and successful- contraxaware.com
Presentation transcript:

The Mythical Man Month “Plan to throw one away”

“Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?

Measure twice, cut once In most projects, the first system is barely usable. Should you built a throw a way system?

Management question Plan for a throw away system? Deliver first system to your customer?

Building a throw away system The new version will include lessons learned. Produce a better product Better chance of success Not building a throw away system ▪ Able to meet time deadlines ▪ Agony for the user ▪ Bad reputation

First built This is a picture of the Tacoma Narrows Bridge. At the time, the third longest suspension bridge in the world.

General Consensus Systems need more management control. Changes are inevitable. J. Cosgrove author of the article “Needed: a new planning framework” Treat all plans, milestones and schedules as tentative, so as to facilitate changes.

Changes continue Level of expertise Capitalize on capabilities Fixing problems create more problems

Highlights Planning Rebuild Changes Changes creates more problems