High Gradients in Dielectric Loaded Wakefield Structures Manoel Conde High Energy Physics Division Argonne National Laboratory AAC 08 – Santa Cruz, CA.

Slides:



Advertisements
Similar presentations
Wakefield Acceleration in Dielectric Structures J.B. Rosenzweig UCLA Dept. of Physics and Astronomy The Physics and Applications of High Brightness Electron.
Advertisements

Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) CLIC Workshop 2014 CLIC choke mode structure and X-band activities.
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
Accelerator Research at SLAC for Future HEP Programs Tor Raubenheimer SLUO Annual Meeting September 18, 2008.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
AS Diagnostic Collaboration Mark Boland
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
US HG Research Collaboration Workshop, SLAC, 2011 PROGRESS ON HG WAKEFIELD ACCELERATOR DEVELOPMENT EUCLID&AWA COLLABORATION A. Kanareykin for Euclid/AWA.
Advanced Accelerator R&D: Flat Beam Transform & Emittance Exchange Kwang-Je Kim ANL & U of C June 27, 2008 ANL-UChicago-FNAL Collaboration Meeting at Fermilab.
Deflecting Cavities for Advanced Accelerator Applications Kwang-Je Kim ANL ICFA Mini-Workshop Deflecting/Crabbing Cavity Applications in Accelerators April.
Development of Dielectric-Based Wakefield Power Extractors Chunguang Jing 1,2, W. Gai 1, A. Kanareykin 2, Igor Syratchev, CERN 1. High Energy Physics Division,
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Dielectric Wakefield Accelerator for an X-ray FEL User Facility
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
Development of Transverse Modes Damped DLA Structure* C. Jing, P. Schoessow, A. Kanareykin, Euclid Techlabs, LLC R. Konecny, W. Gai, J. Power, W. Liu,
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
INVESTIGATIONS OF MULTI-BUNCH DIELECTRIC WAKE-FIELD ACCELERATION CONCEPT National Scientific Center «Kharkov Institute of Physics and Technology» Kharkov,
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Recent Euclid Wakefield AWA C. Jing, S. Antipov, A. Kanareykin, P. Schoessow, Euclid Techlabs, LLC M. Conde, W. Gai, W. Liu, J. Power, Z.
Field enhancement coefficient  determination methods: dark current and Schottky enabled photo-emissions Wei Gai ANL CERN RF Breakdown Meeting May 6, 2010.
Development of a Compact Dielectric-Loaded Test Accelerator at 11.4 GHz* S.H. Gold, a) A.K. Kinkead, b) W. Gai, c) J.G. Power, c) R. Konecny, c) C. Jing,
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
May 5, 2011 Fermilab Daniel Mihalcea Northern Illinois University Department of Physics High Gradient Wakefield Acceleration in Dielectric-Loaded Structures.
ICFA Workshop on Novel Concepts for Linear Accelerators and Colliders. SLAC, July Euclid Techlabs LLC DIELECTRIC BASED HG STRUCTURES: POWER EXTRACTION,
TWO-BEAM, MULTI-MODE, DETUNED ACCSELERATING STRUCTURE S.Kazakov 1,2, S.Kuzikov 3, V.Yakovlev 4 J.L. Hirshfield 1,5, 1 Omega-p,Inc., 199 Whitney Ave., New.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Beam Manipulation by Self-Wakefields John Power Argonne Wakefield Accelerator Facility Sergey Antipov, Alexei Kanareykin Euclid Techlabs LLC.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
The Upgraded Argonne Wakefield Accelerator Facility (AWA)
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
A. Kanareykin, Euclid Techlabs LLC, DOE Review 2013 Euclid Techlabs/AWA Collaboration Efforts on the Wakefield Accelerator Development A.Kanareykin for.
AAC’08 Santa Cruz CA, July 27th - August 2nd 2008 Beam Break-Up Effects in Dielectric Based Accelerators * Advanced Accelerator Concepts AAC’08 A.Kanareykin.
Advanced Accelerator R & D Activities at ANL-HEP Wei Gai (for the AWA group)
S.V. Shchelkunov, J.L Hirshfield, (Yale Univ., Omega-P), T.C. Marshall (Columbia Univ., Omega-P) G. Sotnikov (KIPT, Ukraine, & Omega-P) in collaboration.
HG 2016 Workshop Design of Metallic Subwavelength Structures for Wakefield Acceleration Xueying Lu, Michael Shapiro, Richard Temkin Plasma Science and.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
A. Kanareykin, Euclid Techlabs LLC, CLIC’09 Dielectric Based Accelerator Collaboration Program Euclid Techlabs and Accelerator R&D, HEP, ANL A.Kanareykin.
A compact soft x-ray Free-Electron Laser facility based on a Dielectric Wakefield Accelerator C.Jing, P. Schoessow, A. Kanareykin, Euclid Techlabs LLC,
Bunch Shaping for Future Dielectric Wakefield Accelerators W. Gai Mini-Workshop on Deflecting/Crabbing RF Cavity Research and application in Accelerators.
AWA Overview and Activities Dan Wang for Wei Gai ANL HEP AWA CLIC workshop 2016.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Abstract EuSPARC and EuPRAXIA projects
Demonstration of Complete Multipactor Suppression in Externally Powered Dielectric Loaded Accelerators Joint efforts from Euclid (SBIR grant DE-SC ),
Dielectric accelerators in Microwave regime and a short pulse collider concept Chunguang jing AWA & Euclid Techlabs AWLC2017 June, 2017.
Status of the CLIC main beam injectors
NC Accelerator Structures
Have a chance to operate your own beam at CERN
Cesium Telluride Photocathode Preparation at Argonne
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
Update of CLIC accelerating structure design
Electron Source Configuration
Status of the CLIC Injector studies
Advanced Research Electron Accelerator Laboratory
A very brief introduction to beam manipulation
CLIC Feasibility Demonstration at CTF3
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

High Gradients in Dielectric Loaded Wakefield Structures Manoel Conde High Energy Physics Division Argonne National Laboratory AAC 08 – Santa Cruz, CA

 AWA & wakefield generation  High gradient excitation  Upgrades and future goals  Wakefield excitation in SLAC / KEK X-band structure Outline

Accelerator R&D at Argonne National Laboratory High Energy Physics Division AWA Group  Wei Gai  Sergey Antipov  Manoel Conde  Felipe Franchini  Feng Gao  Chunguang Jing  Richard Konecny  Wanming Liu  Marwan Rihaoui  John Power  Zikri Yusof External Users / Collaborators:  Euclid TechLabs  U.Chicago  NIU  Fermilab  U.Md.  IIT  APS  Yale / Omega-P

Research at the AWA Facility : Advanced Accelerating Structures Current effort has lead to comprehensive knowledge on construction and testing of dielectric based accelerating structures. High Power Electron Beam (~ GW) and RF Power Generation Operating a unique facility to study high current electron beam generation and propagation for efficient beam driven schemes, and high power RF generation. Fundamental Beam Physics and Advanced Diagnostics High brightness beam generation and propagation, phase space measurements, emittance exchange schemes.

Electron Beam Driven Dielectric Wakefield Accelerator  A high current relativistic electron beam passing through a dielectric structure can generate high gradient field, high power microwaves instantaneously. A new way to power accelerating structures by transporting the power in the electron beam.  Justifications for looking at dielectric structures:  Comparable accelerating properties as metal structures.  More material options; possibly higher gradients.  Simpler geometry, simpler construction and HOM damping.  Applications:  Collinear wakefield acceleration  Two-beam acceleration Drive Beam Dielectrics Deceleration Acceleration Accelerate d Beam

Wakefields in Dielectric Structures (a short Gaussian beam) Drive beam is king!  Energy   Charge   Bunch length   Emittance  bb aa  Q Cu

AWA Drive Beamline Drive Gun Linac & Beam Optics Quads Wakefield Structure Experimental Chambers 4.5 m GV YAG1YAG2 Spectrometer YAG5 Dump/ Faraday Cup Slits YAG4YAG3 ICT1 ICT2 BPM Single bunch operation –Q = nC (reached 150 nC) –15 MeV, 2 mm bunch length (rms), emittance < 200 mm mrad (at 100 nC) –High Current: ~10 kA Bunch train operation –4 bunches x 25 nC or 16 bunches x 5 nC (present) – bunches x nC  ns long (future)

The Argonne Wakefield Accelerator (AWA) ~ 1 meter rf-gun magnetic lenses 8 MeV 15 MeV Laser In λ =248nm Linac Quads Spectrometer Faraday cup YAG2 YAG1 Direction of beam propagation Experimental Area

Experimental Setup for High Gradient Tests WF signal RF field probe (- 60 dB) 43 nC time (ns) Monitor for breakdown Infer Gradients from MAFIA  Q Cu Goal: Test breakdown thresholds of dielectric structures under short RF pulses.

Dielectric Loaded Structures Tested SW Structure#1 C10-102#2 C10-23#3 C #4 Q MaterialCordierite Quartz Dielectric constant Freq. of TM01n14.1 GHz 9.4 GHz8.6 GHz Inner radius5 mm 2.75 mm1.9 mm Outer radius7.49 mm Length102 mm23 mm28 mm25.4 mm Wakefield Gradient0.45 MV/m/nC0.5 MV/m/nC0.91 MV/m/nC1.33 MV/m/nC

Wakefield Measurements: Structure #1 (C10-102) 46 nC → 21 MV/m

MAFIA Simulation of Structure #1 (C10-102) Snapshots of wakefield amplitude

Wakefield Measurements: Structure #2 (C10-23) Measurement Simulation Measurement Simulation TM 013 (14.1GHz) TM 014 (16.2GHz) TM 012 (13GHz) HEM 111 (12.4GHz) HEM 111 (12.2GHz) TM 012 (13GHz) TM 013 (14.3GHz) TM 014 (16GHz) HEM 112 (14.7GHz) Freq (GHz) 86 nC → 43 MV/m Measured and simulated E r probe signals

Wakefield Measurements: Structure #3 (C5.5-28) TM nC → 78 MV/m

E-field pattern Wz (V/m) Wz > 1nC for 10GHz Structure 28mm 2.5mm 7.5mm MAFIA Simulation of Structure #3 (C5.5-28)

Wakefield Measurements: Structure #4 (Q ) 75 nC → 100 MV/m HEM 111 TM 012 TM 013 TM 014

 Structure #1 21 MV/m  Structure #2 43 MV/m  Structure #3 78 MV/m  Structure #4 100 MV/m Gradients Reached: Where we go from here: Once the upgrade is complete, the goal is to achieve:  Higher gradient excitation: ~ 0.5 GV/m in structures ( 3 mm apertures)  Higher RF power extraction: ~ 1 GW (10 ns) To improve the drive beam, we are currently upgrading the AWA facility:  A new L-band 1.3 GHz RF station to increase the drive beam energy from 15 to 25 MeV.  Fabrication of Cesium Telluride high quantum efficiency photocathodes to produce long, high charge bunch trains.  A second RF gun to restore two-beam-accelerator capability.

Future AWA Facility (25 MW + 25 MW = 50 MW) *all distances in cm D.U.T. Drive Gun (12 MW) Linac 1 (10.5 MW) 0225 cm351.6 cm581.6 cm29.1 cm455 cm650 cm Linac 2 (10.5 MW) D.U.T. 7.5 MeV MeV 25 MeV Witness Gun (12 MW) MeV Single Bunch: nC Bunch Train: 16 – 64, total charge 1 – 2.5 µC

Some goals of the AWA program: Verify that structures can withstand gradients higher than 100 MV/m. Generation of ~ GW level RF power (25 MeV, 130 Amps, 10 ns, 3 GW beam power). Demonstrate high gradient, broad bandwidth, low cost structures (power extractors and accelerators). Typical parameters: –f = 10 – 30 GHz, Vg = 5 – 20% –Required power: 0.5 – 5 GW peak –Example (for dielectric based structure): 21 GHz, a = 3 mm, b = 4 mm, ε=12, Vg=0.112 For Ez=200 MV/m, it requires P= 1 GW 16 ns RF pulse, structure length : 30 cm, fill time = 8.4 ns Beam loading (fundamental mode):0.75 MV/m/nC

Wakefield Observation on SLAC / KEK X-Band Standing Wave Structure Single bunch charge: up to 80nC. Measurements: Time structure and spectrum of the generated wakefield; Linearity of the voltage-charge curve.

Dimensions for copper only 3-cell standing wave structure experiment t b_conv b_end b1 b2 a_cpl a_pipe 5×Rb Rpipe 5× ellips_r 5×D 2b_end b b b b_cpl b_conv inch 2a a_pipe inch 4×a a_cpl D Rpipe3.00 Rb1.00 t ellips_r Dimensions for 20 deg. C V.A.Dolgashev, 2 March 07 b3 b_cpl

11.427GHz GHz GHz GHz Q ≈ 6700 t - μ s voltage - Volt f – GHz voltage spectrum GHz GHz 3900 q = 34.6nC Measured voltage signal

11.427GHz 9.408GHz 8.361GHz 7.783GHz f – GHz voltage spectrum GHz GHz f – GHz spectrum of the wakefield in the vacuum break for ICT (simulated) The wakefield in the ceramic vacuum break for ICT may contribute to some of the peaks vacuum break

11.427GHz f – GHz voltage spectrum The 11.4GHz component is filtered out t - μ s voltage - Volt q = 34.6nC IFFT Q ≈ 5500 V max V min

voltage peak value charge q - nC For GHz component: