Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.

Slides:



Advertisements
Similar presentations
RFQ development for high power beams
Advertisements

The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Introduction to Radio Frequency Quadrupoles
RFQ Matcher. What am I doing this time?! Concerned that modulations and matcher affect field flatness and frequency These are very small features How.
Tuning the Frequency of the RFQ High Energy End. What are the issues? Both input & output ends of RFQ must be independently tuned for 324 MHz Design of.
Effect of RFQ Modulations on Frequency and Field Flatness
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
CFD Simulations of a Novel “Squirt-Nozzle and Water Bath” Cooling System for the RFQ.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Alain FRANCE for the ESS RFQ Team at CEA Saclay
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
ELECTROMAGNETIC, THERMAL, AND STRUCTURAL ANALYSIS OF RF CAVITIES USING ANSYS 2.1 GHz 3-Cell Cavity Cliff Brutus 6/15/15 Job Name: 2.1ghz_Symmetry_
Tracking Studies of Phase Rotation Using a Scaling FFAG Ajit Kurup FFAG07 12 th – 17 th April 2007.
ELECTROMAGNETIC, THERMAL, AND STRUCTURAL ANALYSIS OF RF CAVITIES USING ANSYS 2.1 GHz 3-Cell Cavity Cliff Brutus 7/9/15 Workbench Job Name: 2.1ghz_Symmetry_
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
Status of Scaling FFAG Phase Rotation ICOOL Simulations Ajit Kurup ISS Machine Group Meeting 27 th July 2006.
Wireless Charging System Project Instructor: Shahar Porat Students : Hadar Zrihan Oren hemo.
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
Refurbished Booster RF John Reid December 12, 2012.
Fine-Tuning the RFQ End Region. “…The Devil is in the Detail” RFQ bulk design very close to completion But before drafting need to check: Repeatability.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
RFQ 3Dtree Space Charge Studies Simon Jolly 6 th June 2012.
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
PASI OsC meeting 12th July 2012
Simple CFD Estimate of End Flange Tuner Finger Cooling.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
RFQ GPT Input Beam Distributions Simon Jolly 22 nd August 2012.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
STATUS OF THE NC BUNCHING RFQ (Sub-task: SC-RFQ) Antonio Palmieri INFN-LNL.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
RFQ CAD Model Tolerance Studies Simon Jolly 2 nd May 2012.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
The RAL Front End Test Stand
The RAL Front End Test Stand
Bunching system for SPES project
F.E.T.S. Mechanical Engineering Update
LINAC AG • IAP • Goethe Universität Frankfurt
Physics design on Injector-1 RFQ
SPES-RFQ review Introduction, general aspects
Date of download: 12/29/2017 Copyright © ASME. All rights reserved.
Optimisation of the FETS RFQ
CST simulations of VMTSA
(i.e. the 4-vane cold model)
RFQ Cold Model End Flange Cone and Finger Conceptual Design
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Mechanical Engineering progress for the Front End Test Stand
System tests at CEA O. Piquet 19/03/2019
Presentation transcript:

Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007

Page 2 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Introduction 4-vane RFQ cold model is now brazed. First RF measurements (done by Aaron Cheng) and comparison with simulations were presented at PAC Investigate effect of the end flanges (i.e. influence capacitance at ends of the vanes and inductance at in the cutback region)

Page 3 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Previously

Page 4 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Bead-pull E-Field Measurements Ø 6mm dielectric bead

Page 5 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Results Presented at PAC 2007 Frequency [MHz] Unloaded Q Predicted Measured after brazing ± ±50

Page 6 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Improved Result f = MHz Q 0 = 6968

Page 7 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup New End Flange and Inserts HUB SPACER GUIDE CONE FINGERS FINGER HUB

Page 8 Status of the RFQ (i.e. the 4-vane cold model) UKNF Meeting 3 rd October 2007Ajit Kurup Plan Improve rf contact in new end flange parts (finger strips, garter spring). Long list of measurements to do using new end flange and inserts. Get a new electrical engineer. Look at rf coupling for 4m RFQ. Modulation of electrodes. Beam dynamics simulations.