GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.

Slides:



Advertisements
Similar presentations
Technician Licensing Class Supplement T4, Questions Only Amateur Radio Practices 2 Exam Questions, 2 Groups.
Advertisements

Analog Basics Workshop RFI/EMI Rejection
EMI in a Hybrid Electric World Tactical Wheeled Vehicles Conference
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
LAT EQUIPMENT EMI REQUIREMENTS PART TWO CONDUCTED EMISSIONS AND SUSCEPTIBILITY.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
TCCA Aircraft Certification
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
EMC EMC of Power Converters Friday 9 May 2014
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
ITAR Restricted Data THEMIS Power Subsystem CDR Peer Review 6/14/04 Probe and Probe Carrier Harness Dave Manges (301)
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Entrance to EMI.
Double Star: Table of Contents
Solar Probe Plus – FIELDS Main Electronics Package
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael Lovellette, Test Director Naval Research Lab Gamma-ray Large Area Space Telescope

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 2 EMI/EMC The Bottom Line  No emissions excesses found in any LAT system level test, CE or RE  One susceptibility found –Tracker occupancy specification of <10 -4 violated at ~100 MHz vertical polarization in RS Nothing on the vehicle radiates in this frequency band Also unlikely for external radiation Not considered a problem, waiver submitted  EMI report in preparation, LAT-TD

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 3 Purpose / Contents  Demonstrate LAT complies with all EMI/EMC requirements: –Conducted and radiated emissions below required levels –LAT does not exhibit susceptibilities when exposed to conducted or radiated energy at required levels  Test Categories –Conducted emissions (CE) –Radiated emissions (RE) –Conducted susceptibility (CS) –Radiated susceptibility (RS)  Requirements flowdown –Mission System Spec  433-SPEC-0005 –LAT Environmental Requirements Spec  LAT-SS –LAT Performance Verification Plan  LAT-MD c –EMI Test Plan  LAT-MD

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 4 Subsystem EMI/EMC Test Summary

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 5 Radiator Subsystem EMI/EMC Test  VCHP heater Radiated Emissions testing –S/C power source for LAT VCHP heaters is an unfiltered DC- DC converter. –Concern is the conducted noise for this power source will become radiated emission issue for LAT system test. –This issue shall be resolved by special subsystem (Radiator) test – RE102 – using simulated S/C power source. –The test was performed just prior to LAT RE102 test.  Not formally part of the LAT level EMI test, performed on an STR

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 6 LAT EMI Test LAT test levels derived from LAT-SS-0778  Test Suite: –CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03 –CECM & CEDM* Conducted Emissions, Time Domain, 150 MHz Bandwidth –CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD- 462, CS02 –CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD- 462, CS02 –CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462 –RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz –RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E –RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz –RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz  Verify by Analysis: –RS103 Radiated Susceptibility, Electric Field, 18 GHz to 40 GHz –Static Magnetic Field * Not required but we did it anyway

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 7 LAT Power Interfaces  SC-LAT Power Interfaces –SC PRU (P) - LAT DAQ –SC PRU (R) - LAT DAQ –SC PRU (P) - LAT SIU (P) –SC PRU (R) - LAT SIU (R) –SC PRU (P) - LAT VCHP +Y Heaters –SC PRU (P) - LAT VCHP –Y Heaters –SC PRU (R) - LAT VCHP +Y Heaters –SC PRU (R) - LAT VCHP –Y Heaters –SC PDU (P) - LAT Makeup Heaters (Survival) –SC PDU (R) - LAT Makeup Heaters (Survival) Makeup circuit power interfaces are not tested. VCHP heater testing limited to RE102

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 8 Test Limitations  RS103 upper limit of 18GHz (40GHz) –18 – 40 GHz addressed by analysis.  Limited area of RS101 test –Requires scanning each 10cm x 10cm area, ~16min/scan –~1450 scans for the LAT, another ~1200 for the radiators (~29 days) –Scan selected locations around connectors, PMTs, BEA  Redundant side testing limited to Conducted Emissions (CE102) and Conducted Susceptibility (CS102)

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 9 As Run Test Sequence  12 June - High Bay –CE102 DAQ hot & ret redundant bus –CE102 SIU hot & ret redundant bus  13 June –CS 102 DAQ ret redundant bus –CS102 SIU hot & ret redundant bus  15 June - Anechoic Chamber –RE 102 calibration –RE102 Test  16 June –RE102 continued  17 June –RS103  19 June –RS103 continued  20 June –RS103 –RE101 –RS103 retest  21 June –RS103 retest –RS101  22 June –CSCM DAQ primary bus –CSCM SIU primary bus –CS06 DAQ primary bus –CS06 SIU primary bus –CS102 DAQ primary bus –CS102 SIU primary bus  23 June –CS06 SIU primary bus –CS102 DAQ primary bus –CS102 SIU primary bus  24 June –CS102 DAQ redundant bus –CE102 DAQ primary bus –CE102 SIU primary bus –CECM SIU primary bus –CEDM SIU primary bus –CS06 retest –CECM DAQ primary bus –RS101 retest  10 July - High Bay –CS102 retest DAQ & SIU primary bus

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 10 Deviations from EMI Test Plan  UHF Notch shown in Figure 36 not included in RE102 requirement –Table 6 Gives correct notches  CS102 pulse level 10 V as indicated in text, not 20V as shown in Figures 27 and 30.  CEDM test not required –We did it anyway  During initial RE testing some radiator connectors not connected –No change noted once they were connected  During redundant side CS test 150kHz to 10MHz signal injection was lead was inadvertently connected to a thermistor lead –Incorrect lead stripped for access –Thermistor passed CS testing with flying colors –Test successfully repeated during primary side CS testing using correct pin number

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 11 Deviations from EMI Test Plan - CS102  Impossible to locate current probe between injection point and LAT connector due to the twisted pair type wiring  Current probe was located at LSC –Reduced current feedback sensitivity  Pre calibrated current limits used LSC RF Generator RF Amp InOut LAT-SIU Interface VSC Chamber Bulkhead Attenuator ≥100  H (if necessary) (+) (-) Spectrum Analyzer Attenuator ≤ 5 cm

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 12 LAT Grounding  Before Radiated Testing the LAT was positioned on copper sheets and all grounds were connected with 18” Cu sheets

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 13 Radiator EMI Test  The radiator was connected to the special power supply  The first run showed power supply harmonics over the limit

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 14 So We Shielded the Power Supply

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 15 Conducted Emissions  All conducted emissions tests passed comfortably –Representative plot shown here.

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 16 Conducted Susceptibility  The only susceptibilities detected during conducted testing were additional noise on RTD temperature measurements –This imposed ± 2 or 3 degrees noise on the temperature readout –Some of the readouts affected were VCHP reservoir temperatures used by the thermal control software –Does not violate any requirements, but worth noting for thermal control software design  This additional noise can be accommodated by a modification to the digital filter in the thermal control system –D. Wood has modified filter and tested against noise data taken during EMI CS test

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 17 Conducted Susceptibility

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 18 CECM, CSCM, CS06  All LAT system tests nominal  There was an exceedence during subsystem CECM test on the heater control box (HCB) VCHP reservoir heater feed. –No retest performed at system level –Waiver approved by project office, CCR

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 19 Radiated Emissions  All radiated emissions, RE101 & RE102, were below required levels  All broad band was well below the limit  SGLS notch also passed easily  GPS notch required some additional shielding of test harnesses, connectors and connector savers to get below limits

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 20 Radiated Emissions - SGLS Notch

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 21 Radiated Emissions - GPS Notch Hor.

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 22 Radiated Emissions - GPS Notch Vert.

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 23 Radiated Susceptibility - RS103  RS103 Test sweeps were performed and data analysis performed off line  ACD, CAL and TKR performance verified

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 24 Radiated Susceptibility - RS101  RS101 tested limited locations  Connectors  Tracker

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 25 Radiated Susceptibilities  LAT exhibited increased tracker occupancy at ~33, 66, & 99 MHz during testing with vertical polarization –Effect noted during post test processing –Only the 99 MHz frequency violated tracker occupancy requirement of <  There are no sources of EM radiation on the S/V at these frequencies and the frequency is below most external sources  Considered not to be a problem  Waiver submitted to project office

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 26 Radiated Susceptibility - TKR

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 27 Personnel  EMI/EMC Test Director - Michael Lovellette  EMI/EMC Facility Operations –Mike Obara - Test Conductor –Tony Gray - Test Conductor  LAT Instrument Operations –Brian Grist – Operations Lead –Standard LAT I&T Operators and Online analysis support –Anders Borgland – Offline instrument analysis lead –Elliott Bloom – LAT181 analysis lead