Required Navigation Performance Presented by The Airline Industry.

Slides:



Advertisements
Similar presentations
CONTROLLED FLIGHT INTO TERRAIN C F I T
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
Stabilized Constant Descent Angle NPA’s
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
Continuous Climb Operations (CCO) Saulo Da Silva
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Approach Charts and Procedures
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Data Processing Equipment
Area Nav: RNP Evolution
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Stabilized Constant Descent Angle NPA’s
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Aircraft Vertically Separated Approaches [VSA] -Takeoffs [VST] and Split-Runway [SR] Operations Presented at: 46 th AIAA Aerospace Science Meeting and.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
VDA – Vertical Descent Angle
GNSS Aviation Applications
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE Agenda Item : Financial Matters Agenda Item : Financial Matters 3:
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding Al-Hoceima Demonstration.
TAWS Improved Functionality Commercial Aviation Safety Team (CAST) Safety Enhancement, SE-120 Commercial Aviation Safety Team (CAST) Safety Enhancement,
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
Review Chapter 4-8. Departure and Arrival Charts DPs, STARs and visual approaches are routinely assigned by ATC DPs and STARs are issued to simplify clearance.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Runway Incursion JJ Johnson May 2011
Potential Safety Benefits of RNP Approach Procedures
Arrival Charts and Procedures
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March Dave Nakamura ICCAIA/Boeing Member to ICAO OCP and RNP SORSG.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Flight Operations.
FAA NAVAID Rationalization / Resiliency Overview
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
An Airline Perspective
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Association of California Airports Instrument Flight Procedures
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE
Performance Based Navigation: Navigation Specifications
Runway Incursion JJ Johnson May 2011
Kabul RNAV Visual & RNP-AR Process & Benefits
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Oceanic and International Operations
Continuous Climb Operations (CCO) Saulo Da Silva
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

Required Navigation Performance Presented by The Airline Industry

Agenda Overview of RNPOverview of RNP The importance of RNP to industryThe importance of RNP to industry Industry progress to dateIndustry progress to date Industry near term visionIndustry near term vision Immediate FAA action requestedImmediate FAA action requested

Required Navigation Performance RNP: A statement of navigation performance accuracy for operation in a defined airspace (ICAO doc. 9613) RNP airspace: Airspace, route(s), and leg(s) where minimum navigation performance requirements (RNP) have been established, and aircraft must meet or exceed that performance to fly in that airspace (RTCA SC181/EUROCAE WG.13) ANP containment radius ANP < 1 X RNP for continued operation RNP and ANP are displayed on FMC CDU Lateral boundary = 2 X RNP (airspace and obstacle clearance)

Lateral Path Construction Defined airspace is 2 x RNP either side of track centerline RW26 Centerline = track between fixes 2 x RNP

RNP Leg Types WPT02WPT02 WPT01WPT01 TFTF Great circle track between two fixes WPT02 DF Computed track direct to a fix Unspecified position Arc center WPT02WPT02 RFRF WPT01WPT01 Constant radius to a fix

Vertical Capability 3 parameters for each leg 1) Waypoint altitude constraint 2) Vertical angle 3) Waypoint speed constraint (optional) Speed and altitude constraint at waypoint (170/2460) Vertical flight path WPTWPT (-3.00º)(-3.00º) Vertical angle

Topo data sources Local WX ATC local flows Obstacle clearance Airplane performance ARINC 424 Simulator Engineering FAA process ATC and Flt Stds ALPA Charting and standards Pilot training Dispatcher training Flight publications FARs & FAA Orders AIM GPS predictive RAIM Procedure design criteria Airplane systems Environmental impact Geodetic systems and calculations Geodetic systems and calculations Nav data base development OPS specifications OPS specifications Air Carrier RNP Operations RNP operations

Why is RNP Important to the Aviation System Safety EnhancementSafety Enhancement Efficiency/Capacity ImprovementsEfficiency/Capacity Improvements –Schedule Integrity –Delay Reduction Noise Friendly ProceduresNoise Friendly Procedures

Total Fatalities = 6,792 (6,566 onboard) 1997 fatalities = 684 (all onboard) Fatalities by Accident Categories Fatal Accidents - Worldwide Commercial Jet Fleet through 1997

TAWS and RNP Improved Safety Net for Obstacle Clearance VNAV path contained within TAWS envelope Terrain clearance floor Starting width = 1/4 nmi 700 ft AGL 400 ft AGL 15 nmi12 nmi5 nmi0.5 nmiRunway Look-ahead distance varies with ground speed and turn rate Look-ahead splays +/- 3 degrees Slopes vary with flight path angle VNAV path

RNP RNAV called for by CAST “The plan will direct or encourage the aviation community to:”“The plan will direct or encourage the aviation community to:” –“Take advantage of existing aircraft capabilities to improve approach and landing safety to the maximum extent practical, and” – “Transition to use of new and evolving aircraft capabilities that can further improve approach and landing safety at the earliest practical time”

RNP RNAV called for by CAST “The plan will direct or encourage the aviation community to:”“The plan will direct or encourage the aviation community to:” –“Take advantage of existing aircraft capabilities to improve approach and landing safety to the maximum extent practical, and” – “Transition to use of new and evolving aircraft capabilities that can further improve approach and landing safety at the earliest practical time” “In the interest of safety, the industry should discontinue the use of step-down or ‘dive-and-drive’ Non- Precision approach procedures as soon as, and wherever, possible...”“In the interest of safety, the industry should discontinue the use of step-down or ‘dive-and-drive’ Non- Precision approach procedures as soon as, and wherever, possible...” –“This would include procedures such as the constant rate descent that can be flown by all types of aircraft and use of the modern vertical navigation capability (VNAV) by some existing and most new aircraft types” ~ Controlled Flight Into Terrain (CFIT) Joint Safety Implementation Team (JSIT) Implementation Plan For Precision-Like Approaches, “Statement of Work” (formally accepted by the CAST)

FAF (5 to 7 miles from runway) DA(H) LNAV, VNAV flight guidance through missed approach procedure Missed approach Balked landing Landing flaps / configurationLanding flaps / configuration Landing check completeLanding check complete Lateral/vertical flight guidance to runwayLateral/vertical flight guidance to runway Autopilot/autothrottle fully availableAutopilot/autothrottle fully available (as low as 250 ft above airport) Substantial Safety Enhancement RNP Enables Stabilized Approaches Situational awareness improvedSituational awareness improved Reduces crew workloadReduces crew workload Eliminates Dive and Drive (Non-Precision) approachesEliminates Dive and Drive (Non-Precision) approaches Provided a Stabilized Approach with LNAV/VNAV guidance to runway thresholdProvided a Stabilized Approach with LNAV/VNAV guidance to runway threshold Runway Typical unstabilized non-precision approach

Generic TERPS Final Approach Area RNP 0.15 Containment Zones for Comparison RNP Versus FAA’s RNAV 7:1 transitional surface RNP 0.15 containment zone DA (H) / MAP RNP provides vertical and horizontal guidance to the runway RNAV provides no vertical guidance if an obstacle penetrates the vertical surface resulting in “dive and drive”. RNP provides vertical and horizontal guidance to the runway RNAV provides no vertical guidance if an obstacle penetrates the vertical surface resulting in “dive and drive”.

RNP Pilot Training Objectives: Safe operations and pilot confidence Ground school Flight Simulator 2 Approach Types: - ILS or RNP RNAV - Vertical guidance for all approaches Simplification and commonality of approach profile increases safety Objectives: Safe operations and pilot confidence Ground school Flight Simulator 2 Approach Types: - ILS or RNP RNAV - Vertical guidance for all approaches Simplification and commonality of approach profile increases safety

Efficiency/Capacity Benefits Improved schedule reliabilityImproved schedule reliability –New runway directions available for use –Lower landing minimums Improved airport and airspace system capacityImproved airport and airspace system capacity Fewer missed approachesFewer missed approaches YieldingYielding –Fuel savings –Time savings –Improved customer satisfaction

Efficiency Improvements Achieved Minima below that of ground based equipment at 4 Alaskan AirportsMinima below that of ground based equipment at 4 Alaskan Airports Approaches to runways that can or not be served with ground based equipment at 6 Alaskan AirportsApproaches to runways that can or not be served with ground based equipment at 6 Alaskan Airports 65 flights to Juneau in the first 9 months of 2001 were “saved” by RNP65 flights to Juneau in the first 9 months of 2001 were “saved” by RNP

Supports FAA’s OEP Less airspace needed per operation Independent parallel approaches possible to runways separated by 2500 feet.

RNP Capability Today 7500 or 45 % are RNP capable globally7500 or 45 % are RNP capable globally + 50 % in US are RNP capable+ 50 % in US are RNP capable –85% Continental –70% Alaska –70% American –50% United –40% US Airways

Past Impediments to Progress Are Disappearing Airline perspective: FAA is not sufficiently supporting RNP Lack of understanding (both government and industry) of RNP capability and safety enhancements Benefits not realized with FAA’s RNAV Mixed equipage, but this is rapidly diminishing Resistance to change, but FAA leadership can overcome this

Specific FAA Action Requested Adapt Alaska’s 737 RNP criteria to create FAA approved generalized RNP Approach Design criteria for all carriersAdapt Alaska’s 737 RNP criteria to create FAA approved generalized RNP Approach Design criteria for all carriers Continue DCA special procedure developmentContinue DCA special procedure development Document lessons learnedDocument lessons learned Develop public criteriaDevelop public criteria Develop public proceduresDevelop public procedures

Summary Many planes are RNP capable and manufacturers continue to deliver more - Airworthiness approval is documented in AFM for terminal/approach useMany planes are RNP capable and manufacturers continue to deliver more - Airworthiness approval is documented in AFM for terminal/approach use Many airlines are ready to use this capability - Ops Specs for RNAV have been issuedMany airlines are ready to use this capability - Ops Specs for RNAV have been issued This expensive capability is already paid for, (May-96 first revenue flight)This expensive capability is already paid for, (May-96 first revenue flight) Air carriers already invested, equipped, trained, ready to flyAir carriers already invested, equipped, trained, ready to fly Immediate safety, delay reduction and economic benefits are availableImmediate safety, delay reduction and economic benefits are available

Conclusion Opportunity to facilitate leadership in the U.S. and global air transport industryOpportunity to facilitate leadership in the U.S. and global air transport industry RNP is unique in its impact (benefits) and changeability (ease of implementation)RNP is unique in its impact (benefits) and changeability (ease of implementation) Changeability High Low LowHigh Impact RNP Changeability/Impact Matrix

The End