1 Session 16 Scheduling System Examples The PAC Data Base Twin Disc Shop-Floor Control Report Finite Loading Example Steelcase Vendor Scheduling Report.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Manufacturing Planning and Control
Chapter 1. Manufacturing Planningand Control. 0. The Context for MPC A.Globalization/Internationalization Even small firms have customers around the world,
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
1 Session 15 Production Activity Control PAC in the MPC System –Shop Floor Control –Vendor Scheduling Production Activity Control Techniques –Basic Data.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
1 Session 17 Theory of Constraint (TOC) Scheduling Theory of Constraint (TOC) Principles Determining Bottleneck Operations Information Flow in TOC Scheduling.
Manufacturing’s Objectives
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
INDUSTRIAL & SYSTEMS ENGINEERING
Perencanaan Kapasitas Produksi
High Lights of SAP Business One for Manufacturing.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
Manufacturing Production Control Systems Dr. Ron Tibben-Lembke SCM 461.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Activity Control
Introduction to Management Science
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Production Activity Control
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Chapter 12a Resource Requirements Planning: MRP and CRP.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Detailed Scheduling (DS) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Lecture 13 Production Activity Control
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
IE 469 Manufacturing Systems 469 صنع نظم التصنيع II - Modeling Systems Tutorial.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Basics of Supply Chain Management
Production Activity Control
Capacity Planning and Utilization
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling Operations
AXUG Partner Showcase – Introducing Preactor
Manufacturing Planning and Control
Tour - session 8 Detailed Scheduling
PRODUCTION ACTIVITY CONTROL (PAC)
Introduction to Materials Management
Chapter 7 Capacity Planning and Management
When You Can See It, You Can Believe It.
PRODUCTION ACTIVITY CONTROL (PAC)
Solutions Hwk Que3 1 The port of Miami has 3 docking berths for loading and unloading ships but is considering adding a 4th berth.
Manufacturing Planning and Control
Material Requirements Planning (MRP)
Capacity Planning.
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Using SHOPFLOOR to PLAN and EXECUTE PAPERLESS
Manufacturing Planning and Control
Manufacturing’s Objectives
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

1 Session 16 Scheduling System Examples The PAC Data Base Twin Disc Shop-Floor Control Report Finite Loading Example Steelcase Vendor Scheduling Report Concluding Principles

2 The PAC Data Base

3 Twin Disc Shop-Floor Control Report

4 Twin Disc Example The shop floor report at Twin Disc shows the six orders that are currently in the BH machine center. The report also shows the next nine orders that are set to arrive at the BH machine. What would the order processing sequence be at the BH machine center under the two following situations?

5 Twin Disc Example a.The first five orders in previous work centers arrive at machine center BH (i.e., 443C A10) before any of the current orders are started on the BH machine. ORDER # _OP #_ __PO__ __PI__ 438C C C A A C A C B B B All jobs that are actual orders (PO’s) have priority over jobs that are for inventory (PI’s).

6 Twin Disc Example b.The last four orders in previous work centers arrive at machine center BH (i.e., 445C A08) before the other five, and no orders are started yet on the BH machine. ORDER # __OP #____PO__ __PI__ 438C C C C B B B A A B All jobs that are actual orders (PO's) have priority over jobs that are for inventory (PI's).

7 Bedford Machine Shop The Bedford Machine Shop's production scheduler has just received the following order: Order no. 6243: Operation number1234 Machine number3124 Estimated time*5384 *In standard hours. a.Bedford allows two days between machine operations for queue time, material handling time, and so on. The shop works five days per week on a single work shift, and no overtime is planned for the near future. Given the following loads at each machine center, determined by finite scheduling in the machine shop, set up a schedule for each operation on the new job and indicate when this order can be shipped. (None of the currently scheduled jobs can be changed.) Week Machine # Capacity* _7_ *ln standard hours.

8 Bedford Machine Shop: Solution a.Order No Operation MachineEstimated Week StartFinishMove Number Number Time* Scheduled TimeTimeComplete *In standard hours This order is completed at the end of the sixth week. It depends on the material handling and paperwork time whether it can be shipped in week six (only one hour remains in the week).

9 Bedford Machine Shop: Solution (Continued) b.Given the information displayed in the shop load table, what capacity recommendations would you make to management? There are heavier loads at machine center 2 and 4 than at 1 and 3. Can these be made more equal (capacity expanded, alternate routing, etc.)?

10 Steelcase Requirements

11 Concluding Principles Production activity control system design must be in concert with the firm's needs. The shop-floor control system should support users and first-line supervisors, not supplant them. Vendor capacities should be planned and scheduled with as much diligence as are internal capacities. Lead times are to be managed. Organizational goals and incentives must be congruent with good PAC practice. Discretion and decision-making responsibilities in production activity control practice need to be carefully defined for both the shop and vendors.

12 Concluding Principles PAC performance should be defined and monitored. Feedback from PAC should provide early warning and status information to other MPC modules. Automated reading systems and distributed computers should facilitate data acquisition and shop-floor decision making. Data base design and integrity must be assessed for PAC systems to be effective. The ongoing evolution in PAC systems as firms increasingly adopt world class manufacturing methods is reduced detail, smaller data bases, and simpler systems.