Welcome
Fall 2014 DISTRICT 4 CONSTRUCTION PROGRAM
District 4 Construction David Peake District Engineer Jesse Free Assistant District Engineer Bruce Cain Area Engineer Thomas Briggs Area Engineer Peter Keke Area Engineer Wayne Chin Office Engineer Judy Wright Administrative Assistant James Otterbein Change Order Facilitator Luz Vega Area Engineer Support Craig Barnes Constructability Reviewer
AX7665182 $2,500,001 - $7,500,000 EST AD 06/23/15 EST BID 07/30/15 $2,500,001 - $7,500,000 EST AD 06/23/15 EST BID 07/30/15 EST NTP 10/05/15 Drainage Improvements– SRI - At Various Locations in District 4
BA0535177 $7,500,001 - $12,500,000 EST AD 01/20/15 EST BID 02/26/15 EST NTP 05/04/15 Safety & Resurface – I-83 SB From Mt. Carmel Road to Shawan Road
Concrete Median Barrier – I-695 From I-895 to I-95 $7,500,001 - $12,500,000 EST AD 11/18/14 EST BID 01/08/15 EST NTP 03/16/15 Design Build Project If you are on the short list you know, if you are not on the short list you know Concrete Median Barrier – I-695 From I-895 to I-95
BA1005280 $1,000,001 - $5,000,000 EST AD 09/23/14 EST BID 10/30/14 $1,000,001 - $5,000,000 EST AD 09/23/14 EST BID 10/30/14 EST NTP 01/05/15 Design Build Project If you are on the short list you know, if you are not on the short list you know Clean and Paint Bridges – At Various Locations on Baltimore Beltway, North Point Boulevard and Cove Road
BA1625274 $100,001 - $500,000 EST AD 02/10/15 EST BID 03/19/15 EST NTP 05/25/15 Drainage Improvement – MD 150 Under Railroad Spur Underpass 800 Ft. West of Tidewater Lane
BA4655187 $1,000,001– $5,000,000 EST AD 02/24/15 EST BID 04/02/15 EST NTP 06/08/15 Roundabout – MD 147 at Glen Arm and Mt. Vista Roads
BA6435130 $1,000,001 - $5,000,000 EST AD 02/10/15 EST BID 03/19/15 $1,000,001 - $5,000,000 EST AD 02/10/15 EST BID 03/19/15 EST NTP 05/25/15 Geometric Improvements– MD 45 From Corbett Road to Gifford Road
Safety & Resurface – US 40 From Chesaco Avenue to Todds Lane BA6855176 $1,000,001– $5,000,000 EST AD 03/24/15 EST BID 04/30/15 EST NTP 07/06/15 Design Build Project If you are on the short list you know, if you are not on the short list you know Safety & Resurface – US 40 From Chesaco Avenue to Todds Lane
BA7275172 $70,000,001 - $85,000,000 EST AD 02/24/15 EST BID 04/02/15 EST NTP 06/08/15 Multi-Lane Reconstruction – SRI - I-695 Outer Loop South of US 40 to MD 144
BA8105180 $1,000,001– $5,000,000 EST AD 01/20/15 EST BID 02/26/15 EST NTP 05/04/15 Bridge Replacement – MD 25 Bridge 0301900 to Georges Run
BA8165284 $2,500,001 - $7,500,000 EST AD 03/31/15 EST BID 05/07/15 $2,500,001 - $7,500,000 EST AD 03/31/15 EST BID 05/07/15 EST NTP 07/13/15 Community Safety Enhancement - US 40 at Mohr’s Lane
BA8965180 $1,000,001– $5,000,000 EST AD 12/16/14 EST BID 01/22/15 EST NTP 03/30/15 This project includes: 90 foot wide bridge Requires a Pedestrian Bridge – location has been set to the north side of bridge Next phase will be to build to northern part of the bridge Shift traffic to the new bridge Demo the existing bridge Build the new bridge roughly in the foot print of the old SHA has include the City of Frederick’s improvements on Motter Ave from the western abutment up to Thomas Johnson Drive Bridge Rehabilitation – MD 695 Bridge 0328100 Over Northeast Creek
Safety & Resurface – MD 138 From Monkton Road to JM Pierce Road BA9535277 $1,000,001– $5,000,000 EST AD 12/02/14 EST BID 01/08/15 EST NTP 03/16/15 Design Build Project If you are on the short list you know, if you are not on the short list you know Safety & Resurface – MD 138 From Monkton Road to JM Pierce Road
BA9785226 $10,000,001– $15,000,000 EST AD 12/16/14 EST BID 01/29/15 EST NTP 03/16/15 This project includes: 90 foot wide bridge Requires a Pedestrian Bridge – location has been set to the north side of bridge Next phase will be to build to northern part of the bridge Shift traffic to the new bridge Demo the existing bridge Build the new bridge roughly in the foot print of the old SHA has include the City of Frederick’s improvements on Motter Ave from the western abutment up to Thomas Johnson Drive Noise Abatement Type 2 – MD 295 Riverview/Baltimore Highlands Community
HA2585180 $500,001 - $1,000,000 EST AD 02/03/15 EST BID 03/12/15 EST NTP 05/18/15 Bridge Replacement – MD 7 Structure 12107XO over Tributary of Bynum Run
HA3485370 $7,500,001 - $12,500,000 EST AD 09/23/14 EST BID 11/06/14 $7,500,001 - $12,500,000 EST AD 09/23/14 EST BID 11/06/14 EST NTP 01/12/15 Design Build Project If you are on the short list you know, if you are not on the short list you know Intersection Reconstruction – MD 22 SRI – At MD 462
HA3485770 $15,000,001 - $20,000,000 EST AD 06/09/15 EST BID 07/16/15 $15,000,001 - $20,000,000 EST AD 06/09/15 EST BID 07/16/15 EST NTP 09/21/15 This project includes: 90 foot wide bridge Requires a Pedestrian Bridge – location has been set to the north side of bridge Next phase will be to build to northern part of the bridge Shift traffic to the new bridge Demo the existing bridge Build the new bridge roughly in the foot print of the old SHA has include the City of Frederick’s improvements on Motter Ave from the western abutment up to Thomas Johnson Drive Intersection Reconstruction – SRI - US 40 at MD 7/MD 159 - Phase 2
Additional Projects for 2015 Description Amount Production Date BA0235177 Safety & Resurface – MD 122 From I-695 to Baltimore City/County Line ($2,500,001 - $7,500,000) 02/10/2015 BA1535277 Safety & Resurface – US 1 Alt. From I-695 to Baltimore City/County Line ($1,000,001 - $5,000,000) 03/10/2015 BA5415277 Safety & Resurface – I-695 From Stevenson Road to Greenspring Avenue (Including Ramps) ($7,500,001 - $10,000,000) BA7295470 Widen and Resurface – MD 140 From South of Garrison View Rd. to North of Painters Mill Rd. ($250,001 - $750,000) 01/20/2015 BA9275277 Safety & Resurface - I-195 From Frances Avenue to Anne Arundel County Line 04/07/2015 HA3415187 Safety & Resurface – MD 22 From Prospect Mill Road to MD 136 03/17/2015
THANK YOU