INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS. FIDIC MEASUREMENT AND EVALUATION CHAPTER 20 SECTIONS 20.5 TO 20.8.

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Contracts – important issues
Dispute Settlement Services offered by the WIPO Arbitration and Mediation Center Heike Wollgast, WIPO Arbitration and Mediation Center.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
COMMENCEMENT OF ARBITRATION PROFESSOR JOSEPH MBADUGHA.
1 Enhancing Business Opportunities in Africa: The Role, Reality, and Future of Africa–Related Arbitration November 2-4, 2014 George Anthony Smith.
Dr. Lic. Herfried Wöss, LL.M. (Exeter), MCIArb. © The relationship between Arbitration and the Dispute Adjudication Board under the FIDIC Silver Book (EPCT)
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
INTERNATIONAL ARBITRATION Domenico Di Pietro STUDYING LAW AT ROMA TRE FALL SEMESTER 18 October 2010.
ICC Amicable Dispute Resolution Services Mediating Corporate Governance Disputes By Mélanie Meilhac.
ICC Dispute Resolution Services ICC Dispute Resolution Services – ADR, Expertise, Dispute Boards and DOCDEX Kim Kit, Ow India July 2011.
WIPO ARBITRATION AND MEDIATION CENTER 1 Ignacio de Castro WIPO Arbitration and Mediation Center February, 2008 Arbitration of Intellectual.
ENFORCEMENT OF DISPUTE BOARD DECISIONS IN CENTRAL AND EASTERN EUROPE Dr Erhard Böhm Baier Böhm Attorneys at Law, Vienna DRBF 6th Annual International Conference,
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
ARBITRATION Vis International Commercial Arbitration Moot.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
ICC Mediation Rules: Standard Clauses ICC Brazilian Arbitration Day Sao Paulo, 14 May 2014 David J. A. Cairns B. Cremades y Asociados, Madrid.
1 1 ADR for Intellectual Property Disputes – ADR Practice in Luxembourg: ARBITRATION.
Prepared by Nabil Abu Ghattas 4/8/2009.  1. Introduction  2. Causes of disputes in construction projects  3. Dispute clauses in contracts  4. Construction.
Drafting a Bullet-Proof ADR Clause: Lessons Learned
Introduction to Mediation. Alternative Dispute Resolution Negotiation Negotiation Arbitration Arbitration Mediation Mediation.
Contract price & payment
Arbitration RA Dirk Hoffmann MBA all rights reserved Best practices – a European perspective Dirk Hoffmann, MBA, Lawyer (Germany) EU-Taiwan Seminar.
تقديم وسائل تسوية المنازعات Presentation of dispute settlement means.
Chapter 7: Inspection, Claim, Arbitration and Force Majeure Abstract: This chapter mainly introduces inspection, claim, arbitration, force majeure and.
 If the Servicer evaluates the Borrower and determines that the Borrower is eligible for a HAFA Short Sale  The Servicer must comply with the following.
INTERNATIONAL ARBITRATION Domenico Di Pietro STUDYING LAW AT ROMA TRE FALL SEMESTER 15 October 2010.
ARBITRATION IN POLAND Maciej Łaszczuk Justyna Szpara Rafał Morek.
Revenue Enforcement Legal Strategies Lawrence K. Nodine Ballard Spahr December 16, 2009.
Negotiating & Drafting International Arbitration Agreements Christopher R. Drahozal John M. Rounds Professor of Law University of Kansas School of Law.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Principles of International Commercial Arbitration Allen B. Green McKenna Long & Aldridge, LLP.
INTERNATIONAL ARBITRATION Domenico Di Pietro STUDYING LAW AT ROMA TRE FALL SEMESTER 25 October 2010.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 3 Arbitration Academy PA R I S SUMMER COURSES
1 DISPUTE SETTLEMENT THROUGH ADJUDICATION N D Sharma.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 5 Arbitration Academy PA R I S SUMMER COURSES
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Notes on the drafting of arbitration agreements in shipping and transport related contracts Fredrik Andersson 16 June 2014.
SESSION THREE TYPES OF DISPUTES RESOLUTION PROCEDURES Immanuel Kant Baltic Federal University Kaliningrad, Russia John B. Tieder, Jr., Esq. McLean, Virginia.
SESSION SEVEN THE HEARING (UNCITRAL 2010) Immanuel Kant Baltic Federal University Kaliningrad, Russia John B. Tieder, Jr., Esq. McLean, Virginia USA
1 ARBITRATION IN TRANSPORT DISPUTES IN FINLAND ”Arbitration clauses in standard charter parties referring to Umpire - an institution unfamiliar to Finnish.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Patrick Zheng ICC arbitration in China. A specific type of ICC arbitration? The conciliation culture in China…
ARBITRATION ACT. Challenge of arbitrator The appointment of an arbitrator may be challenged on the issues of – (i) impartiality, – (ii) independence,
Settle your claims effectively!. Arbitration Court attached to the Economic Chamber of the Czech Republic and the Agricultural Chamber of the Czech Republic.
Construction Contracts Act, Adjudication & Payment Claims Conference 2016 The Right to Suspend Work Explained Lydia B. Bunni BL Wednesday 28 th September.
ARBITRATION IN INDONESIA
Vis International Commercial Arbitration Moot
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Alternative Dispute Resolution (ADR)
EPA CONTRACT TEMPLATE Overview
Gordon L. Jaynes A DAM GOOD THING Gordon L. Jaynes Copyright 2008.
Administration of a FIDIC Contract - Award to Commencement -
EPA SUBCONTRACT TEMPLATE Overview September 2017
SIMAD UNIVERSITY Keyd abdirahman salaad.
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
ALTERNATIVE MEANS OF DISPUTE RESOLUTION
Function of the International Court of Justice (ICJ):
Public works contract Clauses 10.5 & 11.5 Explored
Construction Contract Administration
ALTERNATIVE MEANS OF DISPUTE RESOLUTION
What is a Dispute Board? A Dispute Board is composed of 1 or 3 neutral individuals who help the Parties avoid disputes or resolve disputes. If necessary,
Presentation transcript:

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS. FIDIC MEASUREMENT AND EVALUATION CHAPTER 20 SECTIONS 20.5 TO 20.8

20.5 AMICABLE SETTLEMET Where notice of dissatisfaction have been given the parties shall :-  Settle the dispute amicably before commencement of arbitration.  Otherwise; arbitration may be commenced or after the 56 th day after issuing the notice of dissatisfaction.

20.6 ARBITRAION When dispute has not been: oAmicably settled. oNo final and binding decision from DAB. Dispute shall be settled by international arbitration (unless otherwise agreed by both parties) :- a.Rules of arbitration of the International Chamber of Commerce.

b.Three arbitrators appointed in accordance with these rules. c.Language for communications defined in sub clause 1.4 (The language of communications shall be stated in the appendix to tender, if no language is stated there, the language of communications shall be the language in which the contract -or most of it- is written.

The arbitrator (s) shall have full power to open up, review and revise any certificate, determination, instruction, opinion or valuation of the Engineer and any decision of the DAB relevant to the dispute. Engineer could be called as a witness and giving evidence or any matter whatsoever relevant to the dispute.

Neither parties shall be limited in the proceeding to the evidence or argument previously put by the DAB to obtain the decision or to the reasons for dissatisfaction given in the notice of dissatisfaction. Any decision of the DAB shall be admissible in evidence in the arbitration.

Arbitration may be commenced prior or after completion of the works. The obligations of the parties, the Engineer and the DAB shall not be altered by reason of any arbitration being conducted during the progress of the work.

20.7 FAILURE TO COMPLY WITH DABs’ DECISIONS. In the event that: a)Neither parties has given notice of dissatisfaction within period stated in sub- clause b)The DABs ’ related decision (if any) has come final and binding and; c)A party fails to comply with this decision. Then:

The other party may – within prejudice to any other right it may have- refer the failure to arbitration under sub- clause Sub-clause 20.4 and 20.5 shall not apply to this reference.

20.8 EXPIRY OF DOBs’ APPOINTEMENT If a dispute arises between the parties in connection with, or arising out of, the contract or the execution of works and there is no DABs, appointment or otherwise; a)Sub-clauses 20.4 and 20.5 shall not apply and, b)The dispute may be referred directly to arbitration under sub-clause 20.6.