Output to accelerator area drive laser: 81.25 MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,

Slides:



Advertisements
Similar presentations
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
Linac Laser Notcher Status David Johnson and Todd Johnson PIP Meeting October 10, 2012 Beams doc 4237.
RF Synchronization, control and stability Takuya Natsui.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
AWAKE electron source New Electron Source WP at CERN
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Laser Notching Demonstration Experiment (Preliminary Results) David Johnson, Todd Johnson, Matt Gardner, Vic Scarpine, Rick Tesarek.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
G J Hirst Central Laser Facility Status of the CTF3 Photoinjector Laser at CCLRC Central Laser Facility G J Hirst, M Divall, G Kurdi, W L Martin, I O Musgrave,
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
8114A Overview. 8114A Overview 10-Feb-04 Page A Overview 1) Specifications and Applications 2) Operational Overview 3) Block Diagram.
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
#3205 Summary 6 th Nov 2012 Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
Measurement of 400 MeV Proton Beam Intensity and Transmission Through Collimator of HPRF Cavity at Fermilab MuCool Test Area M. R. Jana 1, M. Chung 1,
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Diagnostic & Control Status
Drive-Laser Commissioning Status and Plans
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
An X-band system for phase space linearisation on CLARA
Polarized Electron Source for eRHIC (the ring-ring option)
Have a chance to operate your own beam at CERN
Timing and synchronization at SPARC
Controls CBETA controls will extend existing EPICS control system
BC2 Commissioning Parameters
LCLS Commissioning Parameters
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Drive Laser Commissioning Status
MEIC Polarized Electron Source
LCLS Commissioning Parameters
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Experience with photoinjector at ATF
Presentation transcript:

output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz, ~120  s opening solenoid shutter: 1, 2, 5, 10, 20 Hz Pockels cell: 5ns – 120  s opening frequency doubler: output = 532 nm ~ 40 nJ/pulse pulse train monitor photodiode variable attenuator pulse stacker: output ~28 ps pulses variable beam size optics shutter for release to accelerator Photo-injector laser: functional overview

drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz, ~120  s opening solenoid shutter: 1, 2, 5, 10, 20 Hz Pockels cell: 5ns – 120  s opening frequency doubler: output = 532 nm ~ 40 nJ/pulse pulse stacker: output ~28 ps pulses variable beam size optics output to accelerator area pulse train monitor photodiode variable attenuator shutter for release to accelerator monitored/changed in normal operation changed occasionally

Laser room light box virtual cathode laser source exit from laser room cathode [mm] beam on virtual cathode photo-injector lasers transport mirrors on translation stages cathode

photo-injector lasers transport Movable mirrors for changing beam position on cathode “VTM” vertical “HTM” horizontal

CW “unchopped”pulse train chopped, 532nm, train (macrobunch, before attentuator) master 81.25MHz delivered to laser room

Laser timing signals signal used for RF triggering (also with ~23 ms advance) general trigger signal (for BPM’s, cameras, etc) max pretrigger ~270  s Chopper detect chopper open shutter open pockels cell open/close

drive laser shutter open/closed (laser operators key required) shutter to accelerator open/closed (general control panel operation) laser macro-bunch length & external trigger signals Laser system controls...

Chan A: Pockels cell open (~270  s) Chan B: macro-pulse width (~5ns- 100  s) Chans C, D used by BPMs control can be released for manual “local” operation in laser room “internal” triggering used for equip testing when laser not operational

opens laser position control.. left-right defined from electron frame NOT looking back at cathode KNOWN “bug”: if power lost to motor control, the control-system zero position will change. (restarts at zero on control system, but motors actually at position as before power cycle)

ERLPcon2 desktop “Pylon viewer” Viewing the (real) cathode New (more reliable) camera, BUT, not yet tested with laser beam on cathode.... Sensitivity to be determined on startup camera synchronised to laser macro bunch train

Viewing the (real) cathode... as viewed with old camera.... new colour camera to be used this commissioning period Looking at scattered light from cathode, though side port on light-box not enough light with short macro bunch trains observed profile dependent on scattering flatness of cathode position is reliable (not dependent on survey, etc)

Viewing the virtual cathode “virtual cathode” icon on ERLPcon1 desktop no camera control screen shots for now....(will add later) from underneath light-box cross-hair for alignment reference variable attenuator (for camera sensitivity/protection) sensitive enough for monitoring laser with “few-bunch” train lengths beam position accuracy depenent on survey (can cross-check with real cathode at long bunch trains) camera synchronised to laser macro bunch train

Laser-RF synchronisation spacing set by round trip