RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Lock-in amplifiers Signals and noise Frequency dependence of noise Low frequency ~ 1 / f –example: temperature (0.1 Hz), pressure.
Femtosecond Pump / Probe Operation and Plans at the LCLS
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Laser / RF Timing (Engineering of Femtosecond Timing Systems)
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Interferometer Control Matt Evans …talk mostly taken from…
Progress in CW-Timing Distribution for Future Light Sources RUSSELL WILCOX, GANG HUANG, LARRY DOOLITTLE, JOHN BYRD ICFA WORKSHOP ON FUTURE LIGHT SOURCES.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Status of SPARC synchronization system and possible upgrades
LCLS_II High Rep Rate Operation and Femtosecond Timing
UK FEL development package WP6:
RF Synchronisation Issues
Status of Synchronization System
Lock-in amplifiers
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Controls Outline Requirements External Interfaces Schedule Design
Accelerator Physics and Engineering Update Jan 6, 2010
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
Accelerator Physics and Engineering Update Jan 6, 2010
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Diagnostics RF and Feedback
Operational Experience with LCLS RF systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Presentation transcript:

RF / Laser Timing for 5/20/14 Frisch

Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter: – Short term (< few seconds), dominated by noise – Relatively easy to measure / predict Drift – Long term (minutes), dominated by thermal length changes – Very difficult to predict – 30 femtoseconds / deg C / Meter! Cables, Optical table, fiber-optics, vacuum pipe – Need excellent temperature control. Real world systems see ~1ps/deg C.

Timing “Ring”

Timing Errors RF gun compresses beam, so experiment time error is approximately 50% contribution from laser vs gun RF jitter. RF gun amplitude also changes beam time:.01%->30fs Drift is corrected by finding “zero time” in the experiment – Continuous monitoring allows re-ordering of data, used with time-tool at LCLS – Frequency of measurement determines drift timescales. A good e-beam vs laser measurement is more important than anything else for timing!

476MHz Reference Input 119MHz from fiber very high noise Common mode, but different subsystem bandwidths will convert to relative timing jitter. Ron Akre designed PLL to clean up phase noise – Unknown performance but probably OK Need to measure existing reference Can build a new reference if needed – Not fundamentally difficult – Takes a skilled RF engineer. Good RF sources have integrated noise < few femtoseconds in out bandwidth.

Gun / RF Chain X6 multiplier, LLRF PAC, SSSB, Klystron, Modulator, Gun all similar to LCLS LCLS performance 35fs RMS, 0.01% amplitude on a typical measurement Should be OK This is the result of a large amount of tuning work at LCLS. Not all RF systems are this good. 100fs RMS is more typical.

Laser Locker Note: most of the hardware / firmware complexity is “boring” stuff not related to precision locking and not shown here. (bucket jump reset etc).

Locking System (XPP)

Performance 25fs integrated noise 100Hz to 10KHz Above 10KHz, measurement noise dominates Below 100Hz, reference noise dominates Locking banwidth is ~3KHz This is an Out Of Loop measurement Drift relative to LBNL system 500fs in 3 hours Includes >200M stabilized cable

Status of Locking Systems Installed Systems – Early versions running LCLS Injector lasers (X2) for > 1 year – Current version running at XPP, MEC, FACET – Being installed for AMO, SXR, CXI, RLL Operation – High level automation – Common design / interface for all systems – Good reliability Performance – Depends on the unlocked noise of the laser! Schedule – Parts being fabricated / ordered – Few weeks – Lots of control system infrastructure needs to be ready Motor control, A-D, D-A, Epics panels, Python support etc etc. This is not difficult, but is a BIG job Support: – Femtosecond timing group isn’t actually a group! – Joe Frisch, Steve Smith ½ time, Justin May ~full time, Karl Gumerlock, Dave Nelson, Jing Yin, Alex Wallace – part time, engineering, installation for experiments. – 10 Systems being installed – Can support locking systems, but NOT LLRF, Controls, Laser.

Expected Performance If the RF and laser locker systems both operate as well as our best systems (LCLS Gun and XPP laser) expect 30fs RMS! Drift: 30fs/DegC/M – Need good temperature stabilization Acoustic noise – Normal conversation levels (for Joe), will double the laser phase noise! – Need sound absorbing tiles. Move noisy crates out of the room etc. Laser locker itself is low risk, but overall performance depends on a lot of systems 100fs RMS is a more comfortable target than 30fs RMS, but still not certain.