Renewals Reporting Project - Analysis Phase Scoping & Approach June 2014.

Slides:



Advertisements
Similar presentations
Rwanda Aid on Budget Working Session CABRI Annual Seminar April 2009.
Advertisements

Business Improvement Review Knowledge Understanding Action.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
© The Treasury 1 Better Business Cases “Investing for change” Overview.
BI Web Intelligence 4.0. Business Challenges Incorrect decisions based on inadequate data Lack of Ad hoc reporting and analysis Delayed decisions.
2009 – E. Félix Security DSL Toward model-based security engineering: developing a security analysis DSML Véronique Normand, Edith Félix, Thales Research.
Components of a Product Vision/Strategy
The COUNTER Code of Practice for Books and Reference Works Peter Shepherd Project Director COUNTER UKSG E-Books Seminar, 9 November 2005.
The application of “Value Engineering” tools to risk assess the outputs of an NSI Graham Sharp Manager, Continuous Improvement Zone ONS, UK
Internet Management Consultants and Solution Providers Outstanding CMS Projects Lessons from the Front Line.
Renewals Reporting Short Term Solution - Analysis Phase Scoping & Approach 9 th June 2014.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Hyperion EPM Overview & Case Study.
HFSD Methods Nov HFSD Methods Objectives –To consider types of systems –To characterise methods for HF input into SD –To identify HF contributions.
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | Introduction and Update: Oracle Hyperion Financial Close Management CON8536 Richard.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. 1 The Relationship between.
A NEW APPROACH TO ASSET THE VALUE OF “BUILDING CONTROL”…
Charting a course PROCESS.
Release & Deployment ITIL Version 3
Information on Demand in Action Darren Silvester – Design Authority 17 th September 2009.
Margin Management Tool (MMT) Recommended Approach 23-January-2014
Integrated Circulation Reporting Short Term Solution - Scoping & Approach 5 th December 2013.
Campaign Management Analysis Business Justification.
Integrated Circulation Reporting Prototype Demo 30 th May 2013.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
MARCH 1 Project Management AIM l to provide a broad and practical understanding of the practice of Project Management l to improve Project Management practices.
Lori Smith Vice President Business Intelligence Universal Technical Institute Chosen by Industry. Ready to Work.™
Dashboard & Scorecard Case Study. Introduction Hagemeyer Case Study – Background – Situation – Strategic CPM Vision – Solution – Benefits Assimil8 Overview.
Better Business Cases “Investing for change” Overview
Performance Management in Practice
MANAGEMENT SUPPORT SYSTEMS II 7. Business Intelligence.
Northern California Oracle Applications User Group February 11, 2004.
Children Youth & Women’s Health Service Functional Audit Project July 2005.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
IT Requirements Management Balancing Needs and Expectations.
10 Important Criteria for Change Management Success Karen Korb TELUS Health Solutions November 23, 2009.
Presenting large scale forecast results in an intuitive way An industry case study. David Edison.
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
1 SROC Conference JISC Timetabling Study - Presentation of findings 7 th April 2009 Zeb Nash.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
BUSINESS ANALYSIS AND FINANCIAL POLICY UPSA – LEVEL 300 Mr. Charles Barnor, Mr. Danaa Nantogma and Mr. K. Fosu-Boateng 1.
Must evolve to meet today’s needs Rationalization occurring Not pervasive.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
Oracle’s EPM System and Strategy
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
[insert date in Master slide 1] 1 [insert title (in Master slide 1] Waikato Strategic Planners Network 27 November 2015 Svea Cunliffe-Steel, Sector Manager.
Continual Service Improvement Methods & Techniques.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
1 Home Care Support Outcome Based Specification Workshop 26 th November 2009.
Stakeholder Relations. Local government principles, LGA- S4 “(a) transparent and effective processes, and decision-making in the public interest; and.
ESR Business Intelligence Nick Adcock NHS Senior Development Advisor Turning Data Into Intelligence.
Shared Services Initiative Summary of Findings and Next Steps.
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
ExpertSelect Belgium S.A. – Chaussée des Collines 54 – B-1300 Wavre – BELGIUM – +32 (0) – Optivalue.
Procurement Development Programs
PMO Awareness and Support Presentation
QlikView Connector for Informatica Powercenter An Introduction
Identify the Risk of Not Doing BA
Rwanda Aid on Budget Working Session
MES / MOM Implementation and Governance HGP Asia Knowlegde Day 2017
Change Assurance Dashboard
Copyright © Simon Wallace
ESS Vision 2020: ESS.VIP Validation
Data Discovery Change Committee.
BI Tools Service – Framework Design Planning Reporting as a service
Business Process Improvement in the LFS
KEY INITIATIVE Financial Data and Analytics
OU BATTLECARD: Business Intelligence
Presentation transcript:

Renewals Reporting Project - Analysis Phase Scoping & Approach June 2014

Current Challenges Highly labour intensive process for regional and central retention teams Suspect data reliability Regional variations in renewal terminology Over complicated renewal reporting rules across regions 2

Impacts The Impacts  Perceived lack of control over renewals  Senior Management unable to report renewals with any confidence  Hampered business decision making and renewal strategy  Regional teams spending more time on collating data and less time on renewal marketing  Reporting delays  Risk of erroneous reporting Who is impacted  Circulation teams – central and regional  Senior Management Team 3

Approach Create small task force with central, regional and BI team representation Build prototype to provide short term solution  Analysis phase to agree requirements and high level design 3-4 weeks  Followed by build, test and implementation of the solution 3-4 weeks Learn from prototype to formulate strategic solution 4

Project Goals/Objectives 5 NoGoal/ObjectiveSuccess Measurement Metric 1Deliver short term solution to support minimum renewal KPI Accurate renewal data available 2Improved report formatting and visualisation Reporting “Dashboard” with KPI and drill down capability 3Timeliness of reportingReport available COB UK time every Friday

Project Stakeholders Michael Brunt – Project Sponsor Anna Rawling – Project Sponsor Sharon Emecz – Circulation Marketing Toby Burton – Circulation Finance Howard Tunnicliffe – Circulation Finance QlikView Consultant Regional representation as needed 6

Project Scope In Scope  Renewal KPI definition and reporting  Snapshot reporting i.e. comparison between renewal rate – previous week versus current week  Time dimension driven renewal rate reporting  Standardisation of renewal terminology and renewal rate calculation  User interface high level design  QlikView prototype Out of Scope  Extended dimensions  Linking to campaign management  Forecasting processes and tools improvements 7

Next Steps Project Team  Series of one-to-one and group sessions to elicit, analyse and validate business requirements and prototype  Draft of business requirements document and prototype  Group sessions to review and sign-off prototype What we need from the stakeholders  Make yourselves available for consultation  Provide subject matter expertise  Focus on “what we need in the future” rather than “how we do it now”  Aim for a single global renewal reporting model 8