Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.

Slides:



Advertisements
Similar presentations
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Advertisements

Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
ICAO Provisions for Safety Management
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop Benefit Appraisal for Oceanic Applications Dr T E Johnson, BAE Systems
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
ASSTAR Oceanic Applications by Nico de Gelder, NLR ASSTAR User Forum #1 4 April 2006, Roma.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS LC&P Applications in Radar Airspace: Operational Scenario Example and Fast-Time Simulation Results.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
4 th Workshop, Amsterdam, April 2007 ASAS-TN2 Fourth Workshop Sponsored by European Commission DG:RES “ASAS, a Reality Check”
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Airbus Status on ADS-B In / Out Update
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
Algorithm Design for Crossing and Passing Applications John Anderson and Colin Goodchild University of Glasgow, UK Thierry Miquel DSNA, Toulouse, France.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Discussions Summary ASSTAR - Crossing & Passing session.
Final Seminar, Paris, April 2008 ASAS in the SESAR Master Plan Fraser McGibbon (BAE Systems) Andy Barff (EUROCONTROL EEC) ASAS-TN2 Seminar Paris.
Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
ASSTAR Airborne Separation Operations in Oceanic Airspace Bob McPike, NATS ASAS-TN2 Conference Glasgow, September 2006.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
Joint 5 th ASAS TN2 Workshop & 2 nd FLYSAFE Forum Toulouse, September 2007 Experiments on the Impact of Wind on ASPA-S&M Manoeuvres Stephen Broatch,
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT ASAS-TN2 3rd Workshop – Glasgow 11 September 2006 ASAS-TN2 Third workshop Address by the Commission.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
ASSTAR Project Overview & User Forum Objectives
Directorate-General Energy and Transport
Presentation transcript:

Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted REsearch Project (STREP) sponsored by The European Commission – Directorate General RTD - within the 6th Framework Programme (contract number AST4-CT ). The programme started in January 2005 and has a duration of 30 months.

page 2 ASAS-TN2 Workshop#1, September 2005 Contents  Project Overview  Work Package 1: Concept and Scenario Refinement  Separation Applications –Pass Behind/In-front (ASEP-LC&P) –Pass Above/Below (ASEP-VC&P) –Enhanced Flight Level Change Procedure (ASEP-FLC) –In Trail Follow (ASEP-ITF)  Self-Separation Applications –Self Separation on an Organised Track System (SSEP-OTS)

Project Overview

page 4 ASAS-TN2 Workshop#1, September 2005 Consortium Partners EUROCONTROL

page 5 ASAS-TN2 Workshop#1, September 2005 Project Overview  ASSTAR is a EC Framework 6 STREP –Crossing and Passing Applications –Delegation of separation responsibility –Radar and Oceanic Environments  Research objectives support introduction in time frame –ASAS manoeuvre design and execution –Definition of supporting procedures –Air & Ground installation & implementation issues –Benefits –Safety assessment –Impact on Regulations

page 6 ASAS-TN2 Workshop#1, September 2005 Project Objectives  Establish a number of well-defined ASAS Package 2/3 applications  Reach a common endorsement between the airlines and ANSPs of the proposed applications  Regular project user workshops are planned to ensure the involvement of key users at the detailed level  Public User Forums to achieve wider dissemination and elicit responses from a broad representation of the Air Transport community

page 7 ASAS-TN2 Workshop#1, September 2005 Work Package structure WP1 Concepts & Scenarios WP3 Oceanic Simulations WP2 C&P in Radar Airspace WP5 Implementation &Infrastructure WP4 Procedure Definition WP6 Safety Assessment WP7 Dissemination & Exploitation User Forums Package 2 Applications & Procedures Cost Benefit Analysis & Results Regulatory Impact

Work Package 1: Concept and Scenario Refinement (Work in Progress)

page 9 ASAS-TN2 Workshop#1, September 2005 Work Package 1  Define a set of applications and environments (scenarios) for the programme  Develop Operational Requirements Documents –Separate sections for each application  Initial benefits review  Implementation/architecture options  Preliminary risk/safety analysis

page 10 ASAS-TN2 Workshop#1, September 2005 Operational Environment

page 11 ASAS-TN2 Workshop#1, September 2005 Applications, Scenarios & Environments

page 12 ASAS-TN2 Workshop#1, September 2005 Scenario & Application Priorities  Radar Environment –Lateral Crossing Application (ASEP-LC&P)  Pass Behind (Co-altitude and descending/climbing)  Pass In-front –Vertical Crossing Application (ASEP-VC&P)  Pass Above/Below  Non-Radar Environment –Enhanced Flight Level Change Procedure (ASEP-FLC) –Self-Separation on an OTS (SSEP-OTS) –In Trail Follow (ASEP-ITF)

Separation Applications

page 14 ASAS-TN2 Workshop#1, September 2005 Separation responsibilities

page 15 ASAS-TN2 Workshop#1, September 2005 Impact on Roles and Procedures  Controller is responsible for: –Conflict detection –Initiation of the application –Separation of other traffic from involved aircraft  Air crew is responsible for: –Selection of conflict resolution strategy –Execution of conflict resolution strategy –Informing controller when conflict has been resolved  New procedures will be required –Additional training for both controllers and flight crews

page 16 ASAS-TN2 Workshop#1, September 2005 ASEP-LC&P: Pass Behind

page 17 ASAS-TN2 Workshop#1, September 2005 ASEP-LC&P: Pass behind

page 18 ASAS-TN2 Workshop#1, September 2005 ASEP-VC&P

page 19 ASAS-TN2 Workshop#1, September 2005 Crossing & Passing  Based upon Package 1 application ASPA-C&P –Separate vertical and horizontal separation applications  ASEP-LC&P (Lateral Crossing & Passing )  ASEP-VC&P (Vertical Crossing & Passing )  Differences –Delegation of responsibility for separation  Similarities –Manoeuvre types –Application phases

page 20 ASAS-TN2 Workshop#1, September 2005 ASEP-FLC

page 21 ASAS-TN2 Workshop#1, September 2005 Enhanced Flight Level Change Procedure  Based upon Package 1 application ATSA-ITP  Differences –Active monitoring phase during flight level change –Aircraft are responsible for separation  Similarities –Applicability conditions unchanged (Could be extended though)

page 22 ASAS-TN2 Workshop#1, September 2005 ASEP-ITF

page 23 ASAS-TN2 Workshop#1, September 2005 In Trail Follow  Based upon Package 1 application ASPA-S&M  Differences –Aircraft are co-altitude in remain phase –Aircraft are responsible for separation –Extended duration (several hours) –Spacing defined in minutes rather than seconds  Similarities –Procedural termination condition - exit from track –Merge instructions can be used to initiate spacing at track entry

Self-Separation Applications

page 25 ASAS-TN2 Workshop#1, September 2005 Self-Separation responsibilities

page 26 ASAS-TN2 Workshop#1, September 2005 Impact on Roles and Procedures  Controller is responsible for: –Transition from managed to self-separation airspace –Transition from self-separation to managed airspace –Provision of flight information services  Airborne domain is responsible for: –Conflict detection –Selection of conflict resolution strategy –Execution of conflict resolution strategy –Provision of flight status information  New procedures will be required –Additional training for both controllers and flight crews

page 27 ASAS-TN2 Workshop#1, September 2005 Organised Track System

page 28 ASAS-TN2 Workshop#1, September 2005 Conflict Resolution Strategies

page 29 ASAS-TN2 Workshop#1, September 2005 Forthcoming events  User Forum #1, April 2006 –Rome –combined with ASAS-TN2 Workshop  User Forum #2, April 2007 –Amsterdam –combined with ASAS-TN2 workshop

page 30 ASAS-TN2 Workshop#1, September 2005 THANK YOU Contacts