Malpasset Dam Disaster

Slides:



Advertisements
Similar presentations
SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
Advertisements

The Failure of Teton Dam
The Teton Dam Failure By Matthew Reddy and Robert Cundill.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Liquefaction, Kobe Earthquake Matt Greaves, Tom Baker.
Structural Geology Crustal Deformation
Metamorphism and Metamorphic Rocks
BLM National Training Center SPRING DEVELOPMENTS.
ANGUS WILSON DANIEL MITCHELL.  Region consists mainly of metamorphic rocks  Overlying soils are thin due to high rates of erosion induced by steep topography.
DAMS.
Geological history exercise Using seismic to deduce the geological history of an area.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Tim Rushton, Phoebe Martin and Amy Fitzgerald. History  Faulting of an uplifted plateau, between the ‘North American Plate’ and the ‘Cocos Plate’. 
Geological Problems Encountered and Solutions Implemented
YUKON OPEN LOOP GEOEXCHANGE CASE STUDY Na-Cho Nyak Dun First Nation Government House Presented by: Katherine Johnston, EIT EBA Engineering Consultants.
FACTORS AFFECTING SLOPE FAILURE Introduction Sr. No Name of the parameters and properties Details 1Geological DiscontinuitiesFault, Joint, bedding plane,
Vaiont Dam Matt Hanson ( ) Chris Nicholson ( )
Geological Issues at the OK Tedi Mine Keith McGregor Sophie Price.
Site selection using GIS techniques Khoncheh dam site selection S. Khalil Aghili Engineering Geologist Isfahan Regional Water Company.
Investigation 3 – Go With The Flow
DAMS Dams are built for one or more of the following purposes: Irrigation Irrigation Flood Control Flood Control Power Generation Power Generation Water.
1 Pertemuan 10 Bangunan Air Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
Merowe Dam: Details of Site & Engineering Design Suzanne Young February 19, 2004.
Rock Deformation and Geologic Structures
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
Dam Failure Dams are generally an expensive structure that directly affect the economy of the area through power generation, flood control and water supply.
Dams and Water Supply The specification states that in relation to dams you need to be able to: Interpret the geological factors affecting the construction.
Groundwater Dams  In most lowlands of Ethiopia where the annual rainfall is below 600 mm, the rains in the highlands drains towards the low elevation.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Lake Origins Water bodies may be classified by their origin. n Gradual or catastrophic geological events form and/or destroy lakes, streams, wetlands and.
General meeting LAGUNA LAGUNA – Fréjus site
Exeter 8/12/00.
folded and disturbed layers
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
Map exercise using the 3D fault model Using seismic data to position a dam.
PRESENTED BY ARCHIT PATEL( ) BRIJESH PRAJAPATI( ) INTRODUCTION TO HYDROLOGIC STRUCTURES GUIDED BY Dr. K PRIYAN & PROF. SNEHAL POPLI.
DAMS Dept. Of Civil Engineering
Hyporheic Zone- area where stream water and ground water intermix.
Geologic Structure.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
THE TETON DAM FAILURE.
Group 14 Angelina Hand Mark Kelly Lydia Rooney Seán Stapleton.
Living with Streams in Flood
River Basin Management Why do we need water management schemes? Ecosystem approach to RBM Multi-purpose RBM Colorado case study.
Shaping Earth’s Surface
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
Extended Diploma Mechanical and Electrical Services Construction Dams and Reservoirs.
GEOLOGICAL INVESTIGATION
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
GEOLOGY IN BRIDGE CONSTRUCTION 1. PARUL INSTITUTE OF ENGG.& TECH. VADODARA PREPARED BY: MANOHAR BISHNOI SHUBHAM KORAT MAULIK.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Chapter 6.3. Metamorphic rock Metamorphism: the process in which one type of rock changes into a metamorphic rock heat, pressure, and hot fluids cause.
Slope Stability Failure
FACULTY OF ENGINEERING TECHNOLOGY & RESEARCH
Dams.
Submition : geology Group:2.
Suresh.R.
Review of 3 rocks before lab test
Taum Sauk Dam Failure Missouri, 2005
SAFETY IS TVA’S NUMBER ONE PRIORITY
Dam Construction & History
THE FAILURE OF SHIH-KANG DAM
Erosion.
DEFINITION MECHANICAL PRINCIPLE: deals with the physical properties of rocks and the significance of these properties in rock deformation.
Structural Geology Structural geology is the study of rocks deformed by stress and strain This involves trying to understand stress and strain forces to.
Joint may be defined as divisional planes or surfaces that divide rocks, and along which there has been no visible movement parallel to the plane or surface.
UNIT 7 DAMS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
Lake 16 Dam Repair Presentation
Presentation transcript:

Malpasset Dam Disaster By Martin Coulthurst Robert Williams

Malpasset Dam Constructed on the Reyran River approximately 7km north of Fréjus, Southern France Built to supply water for irrigation and storage of drinking water Construction was completed in 1954 The Malpasset Dam was a doubly curved equal angled arched dam The dam was approximately 60m high above the river bed, 102m above sea level

Malpasset Dam Diagrams showing the Malpasset Dam before failure

Site Geology Underlying the dam is the metamorphic rock Gneiss Gneiss is an impermeable rock, thought to be watertight, with fine fissuration. The types of Gneiss present are Massive Augen Gneiss and Schistose Gneiss Downstream plunging strata was present, 30°-50° SW.

Site Geology Gneiss Schist Malpasset Dam Mined Coal Deposits Dolerite Rhyolite

Site Geology Before construction, fissuration of the Gneiss in the foundation area was identified. Extensive grouting of the foundation area was highly recommended by geologists, but consultants and the commission then thought it unnecessary

Failure of the Dam The dam failure occurred at 9.10 p.m. on December 2nd, 1959. The breach created a water flood wall 40 meters high and moving at 70 km/h, destroying two small villages - Malpasset and Bozon, in the process Over 400 people died in this disaster

Failure of the Dam Failure occurred in two phases: Slow progressive deformations of the rock foundations and straining of the dam shell Instantaneous failure of the dam and foundations Causes => Combination of: Pressure build-up under the dam Pore pressures and state of rock on the left bank Tectonic fault on downstream side of dam

Malpasset Dam after Failure

Malpasset Dam after Failure

Alternative Solutions Fissuration of the rock should have been investigated More thorough geological study of the region needed before construction The original design of a gravity dam could have been implemented Installation of curtain grouting and drainage

Solution Solution Curtain Grouting and Drainage A system of boreholes filled with grout at the abutments. Will stop the infill of water into the gneiss fissures Drainage channels drilled further downstream. Will stop the build up of any water pressure

Should span whole length of the dam Grout curtain should be perpendicular to the angle of fissuration Drainage curtain should be downstream of the grout curtain

Conclusion As a result of the Malpasset Dam failure, lessons have been learnt for future arch dam construction The need for testing the dam foundations for different traits was recognised The need for safety monitoring of arch dams was also recognised The design itself was not to blame for the failure