N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
D. R. BettFONT Meeting 30 Jan Summary of FONT Studies Jan 2014 D. R. Bett.
D. R. BettFONT Meeting 10 Feb Summary of FONT Studies Jan 2014 D. R. Bett.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Tomoyuki Sanuki, Daisuke Okamoto, Yosuke Honda, Toshiaki Tauchi TB&SGC meeting.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
J. Pfingstner Imperfections tolerances for on-line DFS Improved imperfection tolerances for an on-line dispersion free steering algorithm Jürgen Pfingstner.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Status of Phase Feedforward Tests
Fitting to the Linear Region of I’/q
Presentation transcript:

N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic

Introduction Data from shift on 28 th November 10x1 (standard) optics used on day Variable attenuators: 40 dB throughout FONT Meeting2N. Blaskovic

Intra-chamber misalignment Minimising I and Q simultaneously in all 3 IP BPMs was unsuccessful Mover tilt required for beam to lie on axis of all BPMs appears to be outside mover range Q remains large if beam does not travel on BPM axis regardless of beam position FONT Meeting3N. Blaskovic

Intra-chamber misalignment FONT Meeting4N. Blaskovic IPAIPB IPC ZV2X A (~nominal) ZV2X A max min max min mover base beam ?

Calibrations IP BPM calibrations performed with beam waist on BPM being calibrated Calibrations performed with beam and mover tilt that allowed (I, Q) ≈ (0, 0) at some point over calibration: –ZV2X: A for IPA and IPB calibration –ZV2X: A for IPC calibration FONT Meeting5N. Blaskovic

FONT Meeting6N. Blaskovic IPAmoverScan3 on

FONT Meeting7N. Blaskovic IPBmoverScan2 on

FONT Meeting8N. Blaskovic IPCmoverScan5 on

Jitter runs Jitter runs performed with different waists. Expected jitter if waist at IP (Tauchi-san): FONT Meeting9N. Blaskovic IPAIPBIPIPC jitter 0

FONT Meeting10N. Blaskovic jitRun1 on dB waist at IPB !?

FONT Meeting11N. Blaskovic jitRun2 on dB waist at IPA drift?* * No drift removal, sorry!

FONT Meeting12N. Blaskovic jitRun3 on dB waist at IPA drift?* * No drift removal, sorry!

FONT Meeting13N. Blaskovic jitRun4 on dB waist at IPA IPAIPBIPIPC jitter 0 as expected

FONT Meeting14N. Blaskovic jitRun5 on dB waist at IPA drift?* * No drift removal, sorry!

FONT Meeting15N. Blaskovic jitRun6 on dB waist at IPB IPAIPBIPIPC jitter 0 as expected !?

FONT Meeting16N. Blaskovic jitRun7 on dB waist at nominal IP IPAIPBIPIPC jitter 0 as expected

FONT Meeting17N. Blaskovic jitRun8 on dB waist at IPC IPAIPBIPIPC jitter 0 as expected