CONFIGURATION AND SENSOR LAYOUT AC5 AC6 AC7 Accelerometer-AC AC1 HAMMER VibPilot AC4 AC3 AC2 No Gains is used. Calibration Constant are entered manually.

Slides:



Advertisements
Similar presentations
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Advertisements

1 SURVEYING LEARNING TO READ A COMPASS. 2 The compass is marked with the four cardinal points – north, east, south, and west. The compass is also marked.
Connections and Bracing Configurations
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Wire bundles connecting to Keyence Sensors (screw plug on other end) Colored Wires from bundles (brown, blue, white are nonfunctional, cap with scotch.
TURBULENCE IN THE LIBRARY. ABSTRACT: There is a small library in the south west corner of the second floor in the AJLC center. The 400 sq. ft. room features.
Question of the Day Question: What is a transform boundary? Name the one closest to us. Answer: ……… Turn In: Rate of Plate Motion.
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
Elevations.
Latitude and Longitude
CONFIGURATION AND SENSOR LAYOUT AC5 AC6 AC7 Accelerometer-AC AC1 HAMMER VibPilot AC4 AC3 AC2 No Gains is used. Calibration Constant are entered manually.
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
New Small Wheel Background Charles Young (SLAC). NEW JD GEOMETRY New Small Wheel Background 2.
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Building Plans.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
7 Mini Mall Design. Connection Quick View Architectural view.
Moment Connection Requires Bolts Outside the Flanges
The Sun Solar Wind Our Solar System’s Star Current Age- 5 Billions years old Life Time Expectancy- 10 Billions years 99.8 % of our solar systems total.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Motion in Two Dimensions. Example What is the displacement of a person who walks 10.0 km (E) and then 5.00 km (N) ? D 1 + D 2 = D R Use a “tip to tail”
Chapter 4 Forces and the Laws of Motion. Changes in Motion When we think of Force, we typically imagine a push or pull exerted on an object. When we think.
North Augusta High School Design Development Presentation.
Flange Plates to be Welded to Beam Flanges.
What do we use to measure the angle? PROTRACTOR Angles, Measuring Angles The unit of measurement of an angle is degrees. We measure angles in degrees.
Aanaimalai (Othakadai) Jain’s school and jain beds,bhirami inscriptions on south west side of the hill. It was created at 1 st century A.D. by “eri arithan.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
T HE D UNCAN C ENTER D OVER, D ELAWARE R ACHEL G INGERICH, S TRUCTURAL O PTION S ENIOR T HESIS P RESENTATION A PRIL 15, 2008.
Physics 2D Motion worksheet Selected question answers.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Physics Test Review Vocabulary and Trivia. Round 1 Gravity Mass Sliding Friction Unbalanced Forces Force Velocity.
The Atom + Electronic Configuration Additional Science GCSE Chemistry.
Design of Gantry Girders
Task T6.2 Tertiary Buildings infrastructures installations
*Institute of Space Science
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
UNITED STATES DAILY QUIZ
Slide 2-8: Verification of FE model (global & local)
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Inspire Elementary School
Station Metadata: What do I Need?
AARNA Progress Report-June 2017
Fundamentals of Structural Detailing
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Steam Plant Rehabilitation Building and Smokestack
Performance of MDC during New Data Taking
The Elements of Dance Space.
Linear sequences A linear sequence is a name for a list of numbers where the next number is found by adding or subtracting a constant number. Here is an.
CONNECTION Prepared by : Shamilah
Side view Top view. Side view Top view To take a compass reading the compass must be level Level the compass with the Bubble level. When its level.
University Center 517 University Center North: Inaccessible Element
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Moving Charges in Magnetic Fields
Civil engineering drawing
Landmark Medical Center
Statistical overview of approved INTERREG IIIC operations - All zones - July 2005.
North Augusta High School – Phase 2A and 2B
Student Center A South: Inaccessible Element
Bunker Wall Design Wall ESS
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
GEn-RP engineering & design Status
Presentation transcript:

CONFIGURATION AND SENSOR LAYOUT AC5 AC6 AC7 Accelerometer-AC AC1 HAMMER VibPilot AC4 AC3 AC2 No Gains is used. Calibration Constant are entered manually All sensors is set up in such a way they are measuring positive direction in DAQ settings. Each accelerometer is connected to the channel associated with it’s number (i.e. AC1-Channel 1) (Hammer-Channel 8). S(-) N(+)/x W(+)/y E(-) Hammer Hit Direction z

DETAIL 1 DETAIL 2 DETAIL 3

IN-PLANE MOTION SENSOR DETAILS

SENSOR DETAILS FOR IN-PLANE TESTS TypeBrandModelSerialRangeAdditional InfoLocationCalibration AC-1PCB - ICPU348B /- 50 g HZ Magnetic Mount A Center / South Side Ground Floor Beam 100 mV/g AC-2PCB - ICPU348B /- 50 g HZ Magnetic Mount A st Floor South Side Gusset Plate 100 mV/g AC-3PCB - ICPU348B /- 50 g HZ Magnetic Mount A nd Floor South Side Gusset Plate 100 mV/g AC-4PCB - ICP353B /- 50 g HZ Magnetic Mount A rd Floor South Side Gusset Plate 100 mV/g AC-5PCB - ICPU348B /- 50 g HZ Magnetic Mount A st Floor, North Side Column, Outside of outer Flange Aligned with beam web 100 mV/g AC-6PCB - ICPU348B /- 50 g HZ Magnetic Mount A nd Floor, North Side Column, Outside of outer Flange Aligned with beam web 100 mV/g AC-7PCB - ICP353B /- 50 g HZ Magnetic Cap A rd Floor, North Side Column, Outside of outer Flange Aligned with beam web 100 mV/g EX-1PCB - ICP086D N Medium Hard Red Plastic Tip mV/N

OUT-OF-PLANE MOTION SENSOR DETAILS

SENSOR DETAILS FOR OUT-OF-PLANE TESTS TypeBrandModelSerialRangeAdditional InfoLocationCalibration AC-1PCB - ICPU348B /- 50 g HZ Magnetic Mount A Center / East Side Ground Floor Beam 100 mV/g AC-2PCB - ICPU348B /- 50 g HZ Magnetic Mount A st Floor East Side Gusset Plate 100 mV/g AC-3PCB - ICPU348B /- 50 g HZ Magnetic Mount A nd Floor East Side Gusset Plate 100 mV/g AC-4PCB - ICP353B /- 50 g HZ Magnetic Mount A rd Floor East Side Gusset Plate 100 mV/g AC-5PCB - ICPU348B /- 50 g HZ Magnetic Mount A st Floor, West Side Column, Web 100 mV/g AC-6PCB - ICPU348B /- 50 g HZ Magnetic Mount A nd Floor, West Side Column, Outside of outer Flange Aligned with beam web 100 mV/g AC-7PCB - ICP353B /- 50 g HZ Magnetic Mount A rd Floor, West Side Column, IOutside of outer Flange Aligned with beam web 100 mV/g EX-1PCB - ICP086D N Medium Hard Red Plastic Tip mV/N