Totem Lake Redevelopment Analysis & Visualization.

Slides:



Advertisements
Similar presentations
Geo GIS Practicuum Introduction to ArcGIS 8 Exercise 5 - ESRI Virtual Campus Chapters 1-2, ArcGIS Methods …
Advertisements

Importing Google Earth Data into a GIS Jason Parent Center for Land use Education and Research.
Concepts of Maintaining Your Data Simple Ways to Edit Your Data By Lorne Woods.
Geoprocessing; Useful Tools You Should Know in ArcToolbox Unlock the hidden secrets of ArcToolbox to discover tools that make your work easier and analysis.
Kirkland 2035 Plan Update Summary of EIS Alternatives Transportation Commission – September 25, 2014.
Environmental GIS Nicholas A. Procopio, Ph.D, GISP Some slides from Lyna Wiggins (Rutgers University)
From portions of Chapter 8, 9, 10, &11. Real world is complex. GIS is used model reality. The GIS models then enable us to ask questions of the data by.
GIS Level 2 MIT GIS Services
3680 Avalon Park Blvd E Orlando, FL Phone: Fax: Future Land Use Allocation Model (FLUAM)
Scenario Planning with Envision Tomorrow
Annotation & Nomenclature By Corey Fortezzo for PG&G GIS Workshop, 2010.
Introduction to Cartography GEOG 2016 E
Learning ArcGIS Desktop Topics Covered in Module 1 CVEN 2012 – Geomatics University of Colorado – Boulder April 2006 Alyssa McCluskey.
1 Evaluating Infill Potential: Identifying and Quantifying Infill Opportunity Sites Infill Potential Methodology Project May 2004.
ArcGIS 3D Analyst: Working with 3D Analyst and CityEngine
ModelBuilder at ArcGIS 9.2 Lyna Wiggins Rutgers University May 2008.
Introduction to ArcView
Intro to ArcGIS Kate Dougherty, Geosciences & Maps Librarian Tutorial created for version 10.1 in February 2013.
@ 2007 Austin Troy. Geoprocessing Introduction to GIS Geoprocessing is the processing of geographic information. – Creating new polygon features through.
Introduction to ArcGIS for Environmental Scientists Module 3 – GIS Analysis ArcGIS Toolbox.
Rebecca Boger Earth and Environmental Sciences Brooklyn College.
Arc: Programming Options Dr Andy Evans. Programming ArcGIS ArcGIS: Most popular commercial GIS. Out of the box functionality good, but occasionally: You.
Enterprise ETL & the Home Again
NR 422: Topology Jim Graham Fall 2010 See: odatabase-topology.pdf.
Parcel Data Models for the Geodatabase
ESRM 250 & CFR 520: Introduction to GIS © Phil Hurvitz, KEEP THIS TEXT BOX this slide includes some ESRI fonts. when you save this presentation,
1 Integrating ArcIMS and Current Parcel Information Roger Diercks GIS Manager County of Kankakee.
1 1 PLAZMAP – Planning & Zoning Modernization Application Presented by David Youngblood February 20, 2009 Fugro EarthData, Inc.
CorPlan: Place Based Scenario Planning Tool
1 1 ISyE 6203 Radical Tools Intro To GIS: MapPoint John H. Vande Vate Spring 2012.
Kevin Behm – Addison County Regional Planning Commission Community Build-Out Analysis Nov 5, 2007 New techniques - for an old friend.
Data Development Common Issues for UPLAN and I-PLACE3S.
Major parts of ArcGIS ArcView -Basic mapping, editing and Analysis tools ArcEditor -all of ArcView plus Adds ability to deal with topological and network.
School of Geography FACULTY OF ENVIRONMENT Introduction to ArcToolbox and Geoprocessing.
How do we represent the world in a GIS database?
Learning Common GIS Workflows Rudy Prosser & Michael Sarhan.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Programming for Geographical Information Analysis: Advanced Skills Lecture 1: Introduction Programming Arc Dr Andy Evans.
Community Youth Center URP 4273 Survey of Planning Information Systems Final Group Project: Team Two Spring 2003.
San Luis Obispo County Planning and Building Department Jeff Legato Mapping and Graphics Specialist
Copyright © 2006 by Maribeth H. Price 8-1 Chapter 8 Geoprocessing.
GIS Tutorial 1 Lecture 9 Spatial Analysis.
Introduction to ArcGIS
Esri UC 2014 | Technical Workshop | Designing and Using Cached Map Services Tom Brenneman & Eric Rodenberg.
Map overlays & Geoprocessing Learn about spatial analysis functions overlays, clipping & buffering Use overlays to analyze multiple spatial criteria Understand.
Advanced GIS Using ESRI ArcGIS 9.3 Spatial Analyst 2.
 Kevin Behm – Addison County Regional Planning Commission  Kevin Behm – Addison County Regional Planning Commission Community Build-Out.
NR 143 Study Overview: part 1 By Austin Troy University of Vermont Using GIS-- Introduction to GIS.
Predicting popular areas of a tiled Web map as a strategy for server-side caching Sterling Quinn.
Susan Blake – Infrastructure Information Coordinator, City of Sarasota Utilities Department Cameron Amrine – GIS Analyst, Stantec November 5, 2015 Creating.
NSF DUE ; Wen M. Andrews J. Sargeant Reynolds Community College Richmond, Virginia.
Esri UC2013. Technical Workshop.Type Presentation Name Here.
Introduction to Geographic Information Systems Fall 2013 (INF 385T-28620) Dr. David Arctur Research Fellow, Adjunct Faculty University of Texas at Austin.
ArcGIS 9 ch 4 Edited 11/4/05 1 Creating and Editing Data in ArcGIS 9 Data can be created and edited manually in a GIS. Using the imagery provided for your.
@2007 Austin Troy Lecture 2: Introduction to the Architecture of ArcGIS By Weiqi Zhou University of Vermont Thanks are due to Prof. Troy, upon whose lecture.
Data Visualization and Best Practices Webinar. Overview Environmental Data Sources and Considerations  SDWIS, radon labs, local health departments, for.
Mapping Dallas Brownfields A GIS Approach to Redevelopment Elizabeth Warren GIS Workshop Summer 2007.
Introduction to Geodatabases
Chapter 13 Editing and Topology.
GIS Institute Center for Geographic Analysis
Attribute Extraction.
Introduction to ArcGIS
Spatial Data Processing
Review- vector analyses
Geography 413/613 Lecturer: John Masich
GIS Lecture: Geoprocessing
GIS Institute Center for Geographic Analysis
GIS Institute Center for Geographic Analysis
Automating Student Yield Data Extraction
GIS Analysis in Land Management
Presentation transcript:

Totem Lake Redevelopment Analysis & Visualization

Project Team Racheal Jones –3D and Visualization Analyst –GIS Analyst Michael Horner –3D and Visualization Analyst –GIS Analyst Suzanne Palmason –Project Manager –GIS Analyst Korosh Dabestani –GIS Analyst

Sponsor City of Kirkland Xiaoning Jiang GIS Administrator Eric Shields Director of Planning and Community Development Dorian Collins Project Planner

The Original Idea 3-D Model Visualization For Totem Lake Commercial District –Thumbnail sketches –3-D views of various development options Viewsheds, streetscapes, transportation connections, environmental mitigation, etc.

Totem Lake Mall

Totem Square FOR SALE

Proposed Road from Slater to 120 th (crossing 124 th ) Totem Lake Mall Totem Square Shopping Center

Problem Statement Evolution The Project Plan Problem Statement: Identify areas likely to redevelop Assess the current zoning codes capacity to absorb targeted growth. Communicate potential development scenarios to stakeholders. The Original Proposal Description: 3-D Visualization What they really wanted to know: How does the redevelopment capacity change if we adjust the assumptions about the improvement to land value ratio used as a predictor of redevelopment? What can you do with 3-D tools to help visualize a proposed road and potential redevelopment in the Totem Square area?

Phase 1: Redevelopment Capacity Analysis

The Ratio: Two houses in the same neighborhood, with same lot size. Property is in a zone that allows four dwelling units on a lot this size. Which one is more likely to be redeveloped?

Methodology Join Parcels layer with Assessor data tables Identify redevelopable parcels based on criteria provided by City of Kirkland: Exclude parks and government institutions Exclude condominiums Parcels completely within wetland & stream 50 foot buffer For parcels that intersect wetland buffer: calculate % of parcel within buffer

Dissolve contiguous parcels with common ownership

Model #2 Use zone-specific assumptions to calculate redevelopment capacity

Totem Lake Redevelopment Capacity Analysis Results If all parcels identified as redevelopable are developed to their maximum capacity, what ’ s the capacity for dwelling units and jobs? How does the capacity change if we increase the improvement value to land value ratio used to select redevelopable parcels?

Totem Lake Redevelopment Capacity Analysis Results Zone TL5 Scenario Variations These charts demonstrate the impact of changing assumptions for Office and Residential FAR within the TL 5 zone. Office and Residential FAR values for all other zones remain consistent in each scenario.

Model Builder Pros & Cons Advantages: Visual record of logic Easy for team to review steps and provide feedback Easy to change capacity assumptions & run “what if” scenarios Ability to delete intermediate data (save storage space) Challenges Multiple steps to join tables Select by location requires feature layer input (no shapefiles)

Risks and Challenges –Each review with sponsors uncovered new guidelines for parcels to exclude and forecasting assumptions –Number crunching using GIS –Planning terminology

Phase 2: 3-D Visualization

Methodology The City of Kirkland asked us to model a potential redevelopment scenario in 3D using ArcScene and Google Sketchup. Kirkland has design guidelines for future Totem Lake redevelopment. We used these guidelines to model a redevelopment scenario in District TL 6A (map). These guidelines call for: Commercial uses Multi-family housing The extension of NE 120th Street

Methodology Two Main Approaches When using ArcGIS and Google Sketchup to create scenes there are two basic processes: ArcGIS to Sketchup Sketchup to ArcGIS

ArcGIS to Sketchup To export feature classes, TINs or rasters from ArcGIS to sketchup you need the ArcGIS (beta) plugin. This tool appears after being activated. –Only works in ArcGIS 9.2

ArcGIS to Sketchup

Model Examples

Sketchup to GIS How do you bring a sketchup model back into GIS? Export model as an Autodesk.3ds, 3D modeling file (requires professional version of Sketchup)

Sketchup to GIS Import.3ds file as an ArcGIS Style (Tools/Style Manager/Style Manager)

Sketchup to GIS Create new Marker Symbol

Sketchup to GIS Assign Marker Symbol as a point symbol Note: You will need to convert polygons to points using ArcToolbox (requires ArcInfo)

Sketchup to GIS If you need to change an attribute of your symbol after seeing it in the scene, you can do that in Style Manager. Getting your Marker Symbol sized and aligned correctly will likely require a series of adjustments.

Risks and Challenges Schedule (not enough time to complete the phase) Access to resources –Knowledge about the process (best practices, challenges, what’s doable) –Software Only have access to ArcInfo in UW lab Don’t have access to SketchUp Pro (downloaded trial multiple times)

Risks and Challenges Technological Issues –ArcGIS 9.3 not supported by the Sketchup 'Export to ESRI multipatch' and is not seamless in 9.2. –ArcScene is buggy. Textures would not stay on polygons and lines. The 3D library objects, after adding a new menu, would disappear and come back randomly. Error messages and crashes occur constantly. File corruption due to stability problems. –Takes a lot of power to run a 3D model smoothly –Hard to make models align with boundaries in the scene –Difficult to navigate around and get good shots.

Risks and Challenges –Limited functionality in ArcScene Does not allow for detailing Must create your own data to assign character to a scene (unless it is imported from SketchUp) THIS TAKES FOREVER!

Lessons Learned Look for work tracks that can happen in parallel. (Requires a good understanding of dependencies!) For 3-D visualization, access to the full software packages are important. It’s challenging to build a plan for something you’ve never done before. Get input, and keep revising as you go. Ask sponsors for background info & reference materials. Creating a 3D scene takes time! Details are important for a good show.

Highlights Learned some new functions: –create random points –feature to point –convert 2D data to 3D data –create 3D data –Assigning textures and importing 3D objects –Geoprocessing with Model Builder –Data conversion Provided City of Kirkland with reusable models for capacity analysis