Progress of TG-1 activities (refurbishment of Phase-I detectors) Stefan Schönert on behalf of TG 1 GERDA general meeting Tuebingen, Nov. 9-11, 2005.

Slides:



Advertisements
Similar presentations
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
LNGS (GERmanium Detector Assembly Stefan Schönert MPIK Heidelberg NOW 2004, Sept. 12, 2004.
ILIAS J1, 3rd General Meeting, Paris, 14th Feb Coordinated gamma measurements in the underground labs Jan Kisiel Institute of Physics, University.
September 14, 2007Hardy Simgen, TAUP 2007 / Sendai1 Status of the GERDA experiment Hardy Simgen Max-Planck-Institut für Kernphysik Heidelberg on behalf.
WP3: R&D on ultra low-level WP3: R&D on ultra low-level detectors and facilities JRA1 general meeting, Paris, Feb. 14 th 2006.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities status and outlook Matthias Laubenstein JRA1.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
Integration and Test 14 October 2008 Martin Nordby.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
SNOLab-Majarana Aug. ‘05 Overview:  Phased approach and scientific reach  Funding and schedule  Experimental layout and detailed infrastructure needs.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Gusev Konstantin, Kurchatov Institute / JINR , Gerda meeting Some technical aspects of testing and adaptation of existing detectors.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Task Group 2 Iris Abt, Michael Altmann, Kevin Kroeninger, Bela Majorovits, Franz Stelzer, Xiang Liu 1.Detector Development 2.Suspension & Cabling 3.MC.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
JRA2 - IDEA Zaragoza, Andrea Giuliani University of Insubria (Como) and INFN - Milano.
Topical Workshop in Low Radioactivity Techniques, Sudbury, Canada, August 28-29, 2010 Surface cleaning techniques B. Majorowits a, M. Wójcik b, G. Zuzel.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Warszawa, July 3rd Measurements of natural radioactivity in European underground labs within the ILIAS project Jan Kisiel Institute of Physics, University.
Silvia Borjabad Copper Electroforming 7th JRA-1 Meeting Zaragoza (November 2007) Status Report.
Francesco Cottone INFN & Physics Departments of Perugia, Pisa, Florence (Collaboration Work under VIRGO Project) Thermomechanical properties of silicon.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Agenda A. Caldwell overview 15' S. Belogurov Shielding against cosmogenic activation: current results and prospects15' V. Kornoukhov Enrichment & purification.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Cracow Epiphany Conference on Physics in Underground Laboratories and its Connection with LHC Cracow, Poland The GERDA Experiment at Gran.
“Detector activities” after the IB upgrade Michele Punturo.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
TG 11 overview / Material screening Hardy Simgen MPI für Kernphysik for Task Group 11.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Dec
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Preparations for Run 6 Don Lynch February 13, 2006.
M.Altmann, GERDA Status Report SNOLAB Workshop IV, Investigating Neutrinoless Double Beta Decay Status of the GERDA Experiment Michael Altmann.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Phase I: Use available 76 Ge diodes from Heidelberg- Moscow and IGEX experiments (~18 kg). Scrutinize with high siginificance current evidence. Phase II:
GeMPI-type low background counting system for SURF Kara Keeter 15 September 2014.
Development of Cryo-Module Test System (CMTS-1) S.B. Jawale Head, Centre for Design and Manufacture BARC, Trombay, Mumbai Cryo-Module Test System.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
November 19, 2007Hardy Simgen, IDEA-Meeting Paris Status of the GERDA experiment Hardy Simgen Max-Planck-Institut für Kernphysik Heidelberg on behalf.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Report Technical Director Storage-Ring-Installation Completed
University of Wisconsin
Isidre Mateu Suau (EP-DT-DD)
Ti/SS transitions A.Basti INFN-PISA*
Agenda A. Caldwell overview 15'
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
The SABRE Crystals Frank Calaprice.
UK RFD Pre-Series cryomodule
HIE-LINAC status report
LARP Rotatable Collimators for LHC Phase II Collimation
Scope, Requirements Deliverables & Schedule
(On Behalf of CMS Muon Group)
CryoPlant Commissioning
Integrated Double-beta-decay European Activity
Presentation transcript:

Progress of TG-1 activities (refurbishment of Phase-I detectors) Stefan Schönert on behalf of TG 1 GERDA general meeting Tuebingen, Nov. 9-11, 2005

Outline Detector laboratory at LNGS (LArGe) Transportation of IGEX detectors to GS Refurbishment –detector support and contacts –mechanical/thermal prototype –non-enriched prototype diode –recovery strategy –overall refurbishment and testing strategy Summary / outlook

Underground detector lab (LArGe) ‘Rn-free’ clean bench (detector mounting) ‘Rn-free’ detector test stand: electro-polished dewar & HP-LN refill system (not shown)

Ongoing work to get underground detector lab operational Installation of ‘Rn-free’ clean bench and detector test stand Start-up of chemistry equipment (DI-water, acids, alcohol): purification of Cu & PTFE, methanol wash of Ge-diode transformation into clean room Completion: early December

Transportation of IGEX detectors Transport box sent by Frank Avignone to Canfranc Nov. 13: Igor, Andrey & Peter  Canfranc Nov. 15/16: preparation and packing of detectors with help of Zaragoza group Nov. 17: sprinter (accompanied by Andrey) Canfranc  GS; above ground < 24h Testing of detectors at GS by Andrey & Igor and Oleg Thanks to Julio Morales and Frank Avignone for support! IGEX super-boxes (3x)

Detector refurbishment: support, contacts & array geometry Single detectorPhase-I detector array Design review of contacts and support with Canberra, Olen Prototypes Cooperation during refurbishment (if needed) worked out All materials procured PTFE and Cu screened

Detector refurbishment: mechanical and thermal prototype Silicon spring for inner contact Signal feed through Result of LN cooling test: replacement of one PTFE part by Si

Detector refurbishment: destruction test: verification of safety factor Deformation as expected Safety factor 3 experimentally confirmed Material strength increases at LN temperature Finite element calc. Destructive test

Cleaning of copper parts Electro polished (same procedure as GeMPI detector parts) Chemically etched 1% H 2 SO 4 + 3% H 2 O 2 5 min 1% citric acid5 min Possible sequence (to be finalized): 1) electro-polishing 2) chemical etching (underground) 100  m Surface of copper after machining (electro-erosion)

non-enriched prototype diode Goal: test contacts & support of system Prototype for enriched detector if refurbished at Canberra (Chinese hat) 2 kg diode ready for mounting and testing at Olen Detector support and contacts in workshop Mounting and testing in November/December

Transport and storage container Clean storage of diodes after dismounting and after testing Electro-polished stainless steal container Selected Butyl O- rings (low Rn emanation)

Recovery strategy Possible failure modes and strategies for recovery worked out with Canberra, Olen In synthesis: Dismounting and re-contacting underground at GS w/o modification of diode In case of failure (e.g. damage of Ge-oxide passivation layer, boron implantation) refurbishment at Canberra (Olen) with underground storage in Hades. –Maximize probability to get working diode –Minimize exposure time (~ 1 week) at the prize of moderate material loss (~ 100 g)  Change of Ortec type contacts to Canberra type with groove  Canberra type of passivation

Refurbishment and testing strategy Underground refurbishment Test in LN stand Refurbish. at Olen Underground storage Operation Big tank (physics run) yes no fast Underground refurbishment Test in LN stand Refurbish. at Olen Underground storage Bgd. testing In LArGe physics? Operation Big tank (physics run) yes no delayed Underground refurbishment Test in LN stand Refurbish. at Olen Underground storage Bgd. testing In LArGe Operation Big tank (physics run) yes no on timeGERDA: no yes

Summary / Outlook Nov: transportation of IGEX detectors to GS Nov: startup of underground detector laboratory (LArGe barrack) Nov: test non-enriched prototype in LN at Canberra Olen Dec: dismount 1 st enriched diode (verify dimensions) – to be confirmed with Russian partners Production of low-background support Jan: start-up of LN setup at LNGS and operation of prototype Subsequent: test of enriched diode in LN at GS