BMLD refurbishing G. Iacobucci and G. Chiodini INFN Bologna and Lecce for the RPC group CERN, June 19, 2006 ATLAS Muon week.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
RPC Atlas – Stato del progetto Riunione Commissione I 13 Maggio 2003 By R. Santonico.
Status of the ATLAS MM project
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
U.GaspariniCMS week, 11/06/021 MB3 internal alignment study using cosmic muons - 14 MB3 chambers assembled in Legnaro have been extensively tested using.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Refurbished Booster RF John Reid October 24, 2012.
Lessons from Braidwood with Relevance to Daya Bay Jonathan Link Virginia Polytechnic Institute Workshop on Future PRC-U.S. Cooperation in High Energy Physics.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Reinforcing BOL modules F. Grancagnolo, R. Perrino INFN Lecce ATLAS-RPC Meeting / Roma, Nov. 5 th, 2002.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
Nearly the end of a long story...
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Limited Streamer Tube Project Summary
Presentation transcript:

BMLD refurbishing G. Iacobucci and G. Chiodini INFN Bologna and Lecce for the RPC group CERN, June 19, 2006 ATLAS Muon week

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 2 Reason for this work:  Our RPC units have very small leakage currents (<<1  A).  This was achieved by requiring General Tecnica to install a c-shaped p.e.t. profile around the gas gaps. However, the early gas volumes were produced without this implemenent. These are 107 units out of the 116 which were mounted in 30 BMLD stations (26 double-unit and 4 single-unit stations)

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 3 It was therefore decided to “refurbish” the 107 RPC units of the 30 BMLD stations by opening them and by: 1.installing the c-shaped p.e.t. profile around the gas gaps, to reduce almost to zero the leakage currents 2. installing a 14 mm wide aluminum tape on top of the c- shaped p.e.t. profile, to build an internal Faraday cage to further shield the strips against external noise (this implement was adopted for the BOL units and proved to be very effective)

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 4 Overview of the work: It required a lot of hard work which involved many people: 1.Bring the stations to BB5 (Stephanie, Joerg + Logistics group) 2.dis-assemble a station (Frascati team) 3.uncable the two planes, separate the units (BB5 assembly team) 4.refurbish the units (“Refurbishing team”) 5.make a full test of the units (A. Salomon) 6.re-cable the planes 7.assemble back the station 8.pretest + test with cosmic rays... essentially all of BB5 ! The “refurbishing team”, Gabriele, Peppe, P. Giusti, Givi, Michele and R. Perrino thanks them all

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 5 Work done on each unit: Once the “naked” units were available (thanks to the heroic effort of the BB5 assembly team which added this work to the usual heavy load they have and to the Frascati technicians) we proceeded in the following way: 1. take a test-pulse run (we dropped this test after few weeks, as we realized we did not produce damage to the units) 2. open the unit (… how many rivets!) 3. apply c-shaped p.e.t. profile and aluminum tape 4. check strip panels for dead channels (RF test) 5. re-built the unit (put rivets in position) 6. take a test-pulse run to check for dead channels 7. if ok: “close/fix” the rivets 8. flush and test the unit at 9.6 kV to hunt for dead channels by single rates and to measure the gap and leak currents.

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 6 Criteria to accept an RPC unit We required:  in each strip panel: < 2 dead  strips and < 3 dead  strips  in each gas volume:gap current < 4  A/m 2 leakage current < 1  A The RPC unit was re-opened if these requirements were not met After we found all the small trapdoors preventing us from doing a high-quality job (special thanks go to R. Cardarelli), we managed to refurbish an average of two units/day with a team of 1-2 physicists and 2-3 technicians (top: 13/week) (although our Lecce + Bologna technicians rarely left BB5 before 8 p.m.)

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 7 Results: leakage currents Essentially consistent with zero, for most of the units, except for ~10 gaps with ~0.3  A 4 gaps with 0.5 < i leak <1  A acceptance limit of 1  A

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 8 Comparison before/after: Well within 1/10 of the first bin !

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 9 Dead strips:  Number of dead strips below 1%, both  and   Same level as before We checked ~40000 channels 3 times.

ATLAS muon week - June 19, 2006BMLD refurbishing - G. Iacobucci, G. Chiodini 10 Conclusions That’s all folks