December 6, 2007AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade1 AIP 67-2901/02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.

Slides:



Advertisements
Similar presentations
Hamid Shoaee Control System Installation 3/16/ Downtime Readiness Review Hamid Shoaee For LCLS Controls Group.
Advertisements

Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Data Acquisition and Control Systems HYTEC ELECTRONICS LIMITED Motor Control and Power Drive Support Graham Cross.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 Power Supply Hazard Analysis Summaries P. Bellomo,
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
LCLS Sector 24 QE Magnet Power Supplies January 12, LCLS Sector 24 Power Supplies For QE Magnet Splits Paul Bellomo, Antonio de Lira, Dave Mac Nair.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
LCLS Control Group Power Supply Control Power Supply System Cost Possible solutions Embedded micro IOC MacNair’s solution PSI solution SNS solution.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
ILC RTML Meeting EDR Planning for Magnet Power Systems
ATF2 Magnet Power Supplies
AIP /02 P Bellomo - QE Magnet Power System Upgrade
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
COntrol, Data Access and Communication System for ITER
LLRF Control System Outline Scope Requirements Design Considerations
Magnet PS Controls Hardware Status
Injector, Sector 21 and BC1 Bulk Power Supplies
Magnet Controls K. Luchini
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
Low Level RF Status Outline Overview showing hardware instances
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE Paul Bellomo / Serge Ratkovsky December 6, 2007

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade2 RESTATED SCOPE AND MOTIVATIONS Scope on October 31, 2007 Upgrade “QE” magnet power supplies and controllers in LINAC Sectors 22 and 23 Two new “bulk” power supplies and sixteen new “boost” supplies New Ethernet power supply controllers, new zero flux current transductors, new PPS chassis Motivations Equipment more than 20 years old and at end of useful life. Unreliable, lack of available parts will affect future LINAC operations Better short and long-term current stability Interface with new EPICS-based control system for better diagnostics Lower line harmonics, noise, power consumption

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade3 CHANGES SINCE 07/10/31 REVIEW Review Topics 1.Downtime length 2.Two to three bulk power supplies 3.Possible purchase of new rack 4.PPS elimination – use magnet covers 5.Commitment of Controls Department to support this effort

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade4 1. DOWNTIME LENGTH Original and Present Understandings and Plan IssueOctober 31, 2007 PlanDecember 6, 2007 Plan Downtime10 weeks – 10/1 through 12/15/08 4 weeks – 10/1 through 10/31/08 Build planRefurbish racks and assemble/test in field Purchase new racks and assemble / test in B15

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade5 2. TWO TO THREE BULK POWER SUPPLIES Mode / PS TypeSLCLCLS Bulk200A139V25A17V Boost20A17V20A3.7V Change in rating and use of 3 bulk PS: 1. Better match of rating to load (225A – 200A or 25A) in SLC and LCLS modes 2. Less expensive, smaller and COTS

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade6 THE EXISTING

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade7 THE REVISED BULK PS TOPOLOGY Bulk power supplies were identified as the critical path item if custom designed – COTS desired

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade8 CONTROL OF 3 PS DIAGRAM Black items are provided by power supply manufacturer\ Red items are provided by SLAC

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade9 3. POSSIBLE NEW RACK PURCHASE The issue is time! A 4 week downtime will not allow for field rack refurbishment, system assembly, and test Two new single bay racks – $4,000 * 2 = $8,000 Cost to refurbish existing racks = 2 racks * 2 techs * 9 days / rack * 1 month / 20 days *$8.5k / month = $15,300 + $500 materials = $15,800 Note: Costs are unburdened and are for comparison purposes only

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade10 4. PPS ELIMINATION - USE MAGNET COVERS PPS SystemMagnet Covers EDI: 1engr*0.5mon*$15.1k/mon + 1coord*0.5mon*$10.5k/mon + 1 tech * 0.5day/chassis * 4 chassis* 1mon/20days * $8.5k/mon = $13.7k EDI: Previously completed M & S: 4 chassis * $5k/chassis = $20kM & S: $300*16 = $4.8k Assembly/Install: 1tech*3 days/chassis *4 chassis *1mon/20days * $8.5k/mon = $4.8k Assembly/Install: 16manhours/cover *16 covers $77.50/hour = $19.8k Total cost: $38.5kTotal cost: $24.6k Notes: Costs are unburdened and are shown for comparison purposes Consistency with Sector 20, 21 and 24 magnets

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade11 5. CONTROLS COMMITMENT – LAST SLIDE Network switch purchase needed Soft IOCs exist Programming support to recognize new systems (operating programs, displays, etc already written)

Network Switch swh-li22-nw02 EPSC (Q22401) EPSC (Q22601) EPSC (Q22201) EPSC (Q22701) EPSC (Q22501) EPSC( Q22901) EPSC (Q22801) EPSC (Q22301) Terminal Server ts-li22-nw01 EPSC (bulk) EPICS IOC Optional MCOR Bulk Ethernet Linac Sector LI22 Network Block Diagram

Network Switch swh-li23-nw02 EPSC (Q23401) EPSC (Q23601) EPSC (Q23201) EPSC (Q23701) EPSC (Q23501) EPSC( Q23901) EPSC (Q23801) EPSC (Q23301) Terminal Server ts-li23-nw01 EPSC (bulk) EPICS IOC Optional MCOR Bulk Ethernet Linac Sector LI23 Network Block Diagram

Controls Phase I Soft IOC: Linux box dedicated to magnet ps control (optional) Software –Database –Displays –Software exists to control ps separate as first pass (P. Emma ok). Hardware –Ethernet:: 18 connections (9 per sector) –Terminal Server: 18 connections (9 per sector) –Intra-rack Cables Labor

Controls Phase II Software –Database –Displays Hardware –Ethernet: 4 Ethernet connections (2 per sector) –Terminal Server: 2 connections (1 per sector) –2U VME Crate$ –Evr pmc module$ –Acromag IP Carrier AVME9670 w/P0$ –Hytec ip-8413-adc, +/-10V, 16-bit, 16-chan adc$ –Acromag ip231-16E +/-10V, 16-bit,16-chan dac$ –Acromag Trans 200 Transition module$ –Intra-rack cables$ –Labor$ » Total:$