Baird Government of Barbados Inter-American Development Bank Coastal Infrastructure Programme Addressing the Challenge of Coastal Erosion Prepared by Baird.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
Environmental Project Commitments The Alberta Experience
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
1 The Grain Drain Boston New York Washington, DC Miami Dune areas on the continental shelf caused by breaking waves are called sand bars. Waves pile up.
MARINE SCOTLAND Directorate of Scottish Government: Marine policy
DEVELOPMENT PLANNING FOR COASTAL HAZARDS JUNE 30, 2006 BY ENGINEERING SECTION COASTAL ZONE MANAGEMENT UNIT COASTAL ENGINEERING FOR NATURAL HAZARDS.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Lecture 4. Coastal Policy Overview. Coastal Management: Nested Scales Federal – Coastal Zone Management Act State – California Coastal Program Local.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Wind Power Development In South Dakota E-Week Presentation Rapid City, SD February 19, 2008.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
COASTAL EROSION How can we prevent our beaches from washing away?
Beach Erosion and Deposition
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Mouth of the Columbia River Jetties Major Rehabilitation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Write Up for CZMU Coastal pressures and Responses in Barbados.
17 October 2015www.CapeWind.org1 Project UPDATE March 25, 2009.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Connecticut Department of Energy and Environmental Protection.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Marine Planning update Steve Brooker Head of Marine Planning.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
Galveston coastal fieldwork Task question:. texas/houston/article/Sea-swallowing-Galveston-faster-than-
Coastal Flooding from Marine Sources
California Coastal Commission Permitting For Emergency Response to the 2010 El Nino Storm Event Department of Public Works July 2011.
Ethical and democratic issues that impact on rural communities Or
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Dr Gary MockeDr Gary Mocke. No interference with coastal processes No need for any expenditure Social impacts (relocation, loss of beach access and.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Improvement of the Integrated Coastal Zone Management in the Black Sea Region ICZM.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
Coasts : Coastal Management / Shoreline Management Plans Key Terms : Shoreline Management Plan Sediment Cell No Active Intervention Hold the Line Advance.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Chain Reaction- Who will be the weakest link? This lesson I will be able to: Pursue an investigation on coastal erosion at Walton-On-The-Naze. (Target.
Fostering Infrastructure in LAC IDB Infrastructure Fund Inter-American Development Bank Federico Basañes Infrastructure Fund Coordinator.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Agnes Water Desalination Project Preliminary Studies – Aquatic Ecology John Thorogood and Kylie McPherson.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.
Public-Private Partnerships in Climate Change:
Restructuring Roundtable June 16, 2017
Draft GEF-5 Adaptation Strategy GEF-NGO Consultations June 21, 2009
Managing Coastlines.
How successful are the coastal defences in Christchurch Bay?
Waves and the Shore.
Dublin Unified School District
California’s Plan to Deal With Once-Through Cooling At
The Grain Drain ME Dune areas on the continental shelf caused by breaking waves are called sand bars. Boston Waves pile up large deposits of ocean sand.
Hard Engineering Case Study
Controlling Project Cost and Schedule
MARINE ACTIVITIES REPORT
Ohio Department of Natural Resources Office of Coastal Management
Presentation transcript:

Baird Government of Barbados Inter-American Development Bank Coastal Infrastructure Programme Addressing the Challenge of Coastal Erosion Prepared by Baird and Associates and the Coastal Zone Management Unit Presented by Dr. Leo Brewster Director, CZMU

Baird The Locations  Rockley to Drill Hall  Crane Beach  Holetown Beach  Welches Beach  Woman’s Bay  Holetown Lagoon  Tent Bay  Walker’s Savannah

Baird This Presentation will feature two of these locations  Welches Beach  Rockley to Coconut Court

Baird 1. INITIATE PROCESS CIP Project Manager submits Consultants Design Brief and conceptual sketches to CZMU. CZMU delivers project to Steering Committee. 2. STEERING COMMITTEE REVIEW  Committee comprised of senior technical members from the agencies that are involved in the T&CP review process  This is a review level intended to speed-up the approval process  Committee review and comment or, recommend to proceed 3. TOWN & COUNTRY PLANNING  Review project and final drawings for compliance with planning guidelines  HWM delineation required at this stage 4. MINISTER OF PLANNING  Approval/Permission or Rejection of works  Opportunity for Solicitor General Review Here 5. CHAIR of TENDERS REVIEW  Review contract and technical documents  Provide Tendering dates 6. IADB REVIEW  Ensure compliance with tendering policies for IADB funded projects and borrowing restrictions 7. IADB ADVERTISING  International Business News Advertising 9. TENDER CLOSE  Central Purchasing Review (tendering compliance)  Consultant/Engineers Review (technical/value compliance)  Steering Committee Review recommend or reject tenders 10. CABINET APPROVAL 11. SOLICITOR GENERAL  Notice of Award  Execute contract  Possibility of outside legal review is being considered here? 8. TENDER PERIOD  45 days for pre-qualification (combined pre-qual and bid – requires IADB special permission)  30 days for local bidding and pre-qualified projects  45 days for International Call For Bids (ICB) AWARD CZMU Permitting / Approvals Process

Baird Welches Beach Project Objectives  Minimize overtopping of roadway  Expand beach if possible

Baird Project Location Welches beach is located at Welches in Christ Church on the south side of Highway 7, approximately 0.5 km west of Oistins on the south side of Highway 7, approximately 0.5 km west of Oistins.

Baird Existing Conditions

Baird The Problem During high wave energy events, waves either: (1) run along the undercut sea cliff, increasing in height as they move inshore at the window to the sea at Cachel causing overtopping.

Baird (2) The second area susceptible to overtopping is located at the east end of the Welches “Window-to-the-Sea”. The seawall terminates immediately west of the problem area (the blue wall in the photo is located on the north side of Highway 7). The Problem

Baird ENVIRONMENTAL INVESTIGATIONSUNDERTAKEN ENVIRONMENTAL INVESTIGATIONS UNDERTAKEN  Benthic Surveys  Coastal Vegetation Surveys  Marine Water Quality  Turtle Nesting

Baird SOCIAL IMPACT CONSIDERATIONS  Stakeholder Meetings held pre, during and post construction  Social survey undertaken post construction.

Baird PROPOSED COMPONENTS OF PROJECT  Construct segmented Groyne to East of Site  5500 Cubic Meters of Sand west of Eastern Groyne  Construct Concrete Outlook  Refurbish Existing Groyne and extend by 10m  Construct 40m Groyne to West of Site  1500 Cubic Meters of Sand west of Eastern Groyne

Baird Final Design: Main Project

Baird Project Summary  Contract Award Price Bds. $2,590, VAT Inclusive  Actual Construction Cost Bds. $2,772, VAT Inclusive  Construction Time 10 months

Baird  Create a “signature project” for the Coastal Infrastructure program that is defined by:  Best public/tourist access to the shoreline on the island  Longest section of public walkway along the shore  Together improving the appreciation for the Barbados coast Project Vision Rockley to Coconut Court

Baird  Create continuous walkway / access  Expand beach where feasible  Preserve and enhance natural environment Project Objectives Rockley to Coconut Court

Baird Rockley Beach Project Activities  Physical Model & Coastal Analyses  Environmental Assessment  Stakeholder Consultation  Permit Applications  Design  Contract Documents  Town Planning Approval  IADB Washington Review  Bidding and Approvals Process  Construction and Construction Observation

Baird Rockley to Hastings Physical Model

Baird Selection of Headland/Beach  Headland/Beach prevents loss in most conditions  Beachfill only would experience rapid loss of sand and would not provide a reliable base for the walkway  Breakwaters would prevent natural supply from offshore (and result in increased wave setup)

Baird ENVIRONMENTAL INVESTIGATIONSUNDERTAKEN ENVIRONMENTAL INVESTIGATIONS UNDERTAKEN  Benthic Surveys  Coastal Vegetation Surveys  Marine Water Quality  Turtle Nesting

Baird SOCIAL IMPACT CONSIDERATIONS  Stakeholder Meetings held pre, during and post construction  Social survey undertaken pre construction.

Baird

Project Summary  Contract Award Price Bds. $18,398, VAT Inclusive  Actual Construction Cost (to date) Bds. $16,474, VAT Inclusive (Clean up and retention fee still outstanding)  Construction Time 18 months

Baird Coastal Infrastructure Project Benefits  Quality Shoreline Infrastructure  Greatly Improved Beaches and Public Access (Welches, Holetown and Rockley)  Environmental Improvements (turtle nesting, water filtration)  Generational Capacity (Quality, World Class, Maintained)

Baird Project Benefits  Protects Large Gov’t Investment  Significant Long Term Cost Savings  Maintains a Valuable Public Resource in excellent condition  Maintains Safety of Facility