Overview TRUenergy Yallourn June 2008. Internal Unrestricted1 2 TRUenergy Tallawarra Site MW Yallourn Brown coal-fired base load station and mine 1,480.

Slides:



Advertisements
Similar presentations
Victorian Brown Coal Dale Seymour Deputy Secretary Energy, Resources and Major Projects Department of Primary Industries, Vic.
Advertisements

1 Transformation Presentation to the Public Sector Management Workshop June 1,
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
The New Technology Of Ultra-Clean Coal Presented By : Kaustubh Awade 3 rd Yr. [Electrical]
Installation of New CHP system at the Old Aberdeen Campus.
中 国 水力资源与开发概况 Overview of Hydropower Resources and Development in China Zhou Shangjie China Society for Hydropower Engineering.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
E&CS Overview & Major Construction Update Eddie Clayton.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Objectives: Understand importance of utility and maintenance system in industry/plant.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
COAL.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Simon Bunn – Derceto Inc
POWER GENERATION TECHNOLOGIES
Geothermal Energy By: Billy Simon.  Geothermal Energy: is thermal energy generated and stored in the earth  Thermal Energy: is energy that determines.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Andrew Scanlon Environment and Sustainability Manager Hydro Tasmania Drought and Climate Change.
Reducing energy waste Good for us, great for the environment.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Hydro electric power is the term used to describe the making of electricity utilising the gravitational force of falling or flowing water. Hydro electricity.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Energy & Electricity. History of Electricity/Grid Electricity “system” created in US 1881  Purpose was electricity for lights  1881 cost: $0.24/kWh!
Gas supply and infrastructure – New South Wales APA Group presentation – Energy Forum Armidale 17 th Aug 2012.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Biomass Energy and its future in Wisconsin David Donovan Manager, Regulatory Policy David Donovan Manager, Regulatory Policy.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
RENEWABLE ENERGY POTENTIALS Projections to 2050 BASED ON THE PRESENTATION of Mohamed El-Ashry Chairman REN 21 3rd Ministerial Meeting in Gleneagles Dialogue,
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
Energy Trends. 2 Trift bridge 560’ long 333’ high.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Ontario’s Future Energy Plan Abridged. Ontario’s Electricity Accomplishments Until 2003, ___% of electricity generation came from polluting.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
Energy, Power and Climate Change
Coal. What is coal Coal deposits come from many epochs, but the best and most abundant are from the forests in the warm, swampy river deltas of the Carboniferous.
California Energy Commission Drought Impacts on Electricity Generation Joint Workshop on California’s Drought Response Sylvia Bender, Deputy Director Energy.
Fossil Fuels/Non-Renewable Energy Sources Used to Generate Electricity
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Renewables and System Services Ann Scully.
Furnace/Burner Boiler High Pressure Steam Turbine Generator Electricity Cooler/Condenser Steam Ash and Smoke Coal is burned in a large Furnace/Burner to.
MGE ISSUES. 2 ENERGY 2015 MGE’s plan to meet the energy needs of our customers Solicit customer input Community Energy Conversations.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
Diagram from the publication
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
THERMAL POWER PLANT.
Smart Grid Schneider Electric Javier Orellana
Biomass Cogeneration Facility Savannah River Site Aiken, SC
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
North Coast Wind Farm Tolano Environmental Consulting.
2 October 2014 DECC Heat Networks Demonstrator UK Heat Networks Context.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
Central Markets – Raising the bar. Central Markets A long history Much tradition A significant future.
1 18/05/2006 Giancarlo Scorsoni Italy Country Situation.
Karratha, WA 3rd November 2016
 II THE ADVANTAGES OF ELECTRICITY
APTA Sustainability Workshop 2016
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
APTA Sustainability Workshop 2016
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Financial benefits of solar and wind power in South Africa in 2015
About Dominion: One of America’s Leading Energy Companies
Presentation transcript:

Overview TRUenergy Yallourn June 2008

Internal Unrestricted1 2 TRUenergy Tallawarra Site MW Yallourn Brown coal-fired base load station and mine 1,480 HallettGas-fired peaking station 180 Newport and Jeeralang Gas-fired power station966 – TallawarraStage A CCGT (construction) Stage B OCGT (development) Hallett Yallourn SEAGas Pipeline Retail assets Electricity assets Newport and Jeeralang Iona Gas Storage Brisbane Sydney Melbourne Adelaide Studland Bay wind farm Bluff Point wind farm Cathedral Rocks wind farm Iona Gas storage facility 12 PJ gas storage facility Gas assets Details SEAGas Pipeline 33% owner Mass marketElectricity - 700,000 customer accounts Gas – 500,000 customer accounts GreenPower Retail footprint Roaring 40’sManagement of wind assets in Australia, China and India 350 Industrial customer ~50,000 customer accounts 7 TWh AGILITY, ACHIEVEMENT TRUenergy – a major national integrated energy company

Internal Unrestricted1 3 Divider / Section title Sub Title Line TRUenergy Yallourn

Internal Unrestricted1 4 Plant Statistics Brown Coal Fired Units – burning coal of 65% moisture 30 Year Old Plant Unit 1 and Unit 2 - Commissioned 1974 / 75 (Stage 1) John Thompson boiler – Traditional Drum 350MW Toshiba/GE derived turbines Design Thermal efficiency 32% Unit 3 and Unit 4 - Commissioned 1981 / 82 (Stage 2) International Combustion boilers – Semi Once Through 375MW Toshiba/GE derived turbines Design Thermal efficiency 34%

Internal Unrestricted1 5 Plant Data » Unit 1 Unit 2 Unit 3 Unit 4 Commissioned MCR (MW) Running Hours 240, , , ,000 (To End 07) Average starts/year Notional Design Life = 30 Years

Internal Unrestricted1 6 History Built for the State Electricity Commission of Victoria as part of utility fleet serving Victoria Generation as part of Government Instrumentality Station Privatised 1995/96 - POWERGEN China Light and Power Purchase 2001 Plan life mid 2020’s Coal Quality Low energy coal 7.3 MJ per kg LHV Low sulphur 0.23% dry basis Low ash 2% dry basis High moisture content 63% - 65%

Organisation Chart - Yallourn General Manager Yallourn Yallourn Site Asset Manager Power Station Maintenance Manager (Alliance Manager) Operations Manager Commercial Manager HR Manager Mine Manager Alliance Teams Mix of TRUenergy And Silcar Ops Teams Chemists Ops Performance Safety Health & Environmental Team Asset Management Team Commercial Team Estate Services Alliance RTL Alliance Operations And Maintenance Mine Infrastructure Group (TRUenergy) Mine Maintenance Silcar Sub-Alliance

Internal Unrestricted1 8 Alliances TRUenergy Yallourn – Alliance Contracts POWER STATION MAINTENANCE – Alliance With SILCAR - Teams combination of TRUenergy and SILCAR personnel MINE - Alliance with RTL - RTL Sub Alliance with Silcar for Mine Maintenance SECURITY & SUPPORT SERVICES - Alliance with Estate Services (Infraserve)

Internal Unrestricted1 9 Personnel Breakdown Total Site Including Mine = 493 People

Internal Unrestricted1 10 Plant Performance

Internal Unrestricted1 11 Operating Regime OPERATES IN NATIONAL ELECTRICITY MARKET Bids to generate on 5 minute basis with payment on half hour Base Load running Part of TRUenergy portfolio of Generation, Gas and Retail business Market can be volatile and unpredictable

Internal Unrestricted1 12 Yallourn Mine – Changed Mining Method

Internal Unrestricted1 13 Traditional Brown Coal Mining

Internal Unrestricted1 14 Dozer Technology

Internal Unrestricted1 15 Recent Major Activities Relocation of Morwell River to run through mine area Conversion of four units and common plant from analogue to digital controls Reblading of LP Turbine Last Stage Blades. Repack of RAH’s in Stage 1. Rewind of Unit 2 Generator New Condenser in Unit

Internal Unrestricted1 16 PROJECTS Two new HIP Turbines to be installed on Stage 2 Units. 3% Efficiency improvement. Refurbish of Cooling Tower 3 Internals Re-tube Condenser U

Internal Unrestricted1 17 Morwell River Diversion (MRD) Embankment geometry 3.5km clay lined channel 13 million cubic metres earth Channel designed for 1:10,000 year probability flood 70 m wide trapezoidal channel, 10 m deep Toe weights for stability on east and west sides of embankment Instrumentation and survey to monitor pressures and movements

Internal Unrestricted1 18 Major Challenges CARBON FOOTPRINT - BROWN COAL - High moisture (65%) results in low energy per kg and need to burn three times the amount compared to black coal - CO 2e produced approximately 1.3 tonnes per megawatt hour sent out - Low in ash and low in sulphur WATER SUPPLY - Low rainfall country - Focus on saving water - Competing demands for use of resource