Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.

Slides:



Advertisements
Similar presentations
Science Operations Phil Edwards 11 June 2013 CSIRO ASTRONOMY & SPACE SCIENCE.
Advertisements

E-VLBI Progress with the LBA Chris Phillips, eVLBI Project Scientist November 2011.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Science Operations Phil Edwards Head of Science Operations CSIRO ATNF.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
ATNF Scientific Software – an overview Mark Wieringa – ATNF/Operations/SCA.
Mopra Operations Balt Indermuehle 13 June ATNF Mopra Operations What’s new at Mopra Telescope Operating Alerting Device Gotta love the TOAD! Mopra.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
Millimetre Astronomy with the Australia Telescope Max Voronkov Software Scientist – ASKAP 12 th June 2009.
The SOC Pilot Project: MALT-90 Jessica Chapman CASS Observatory Operations Research Program Leader 9 September 2010 MALT90 Project – Presented and edited.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
Blackboard Upgrade. RMIT Information Technology Services Blackboard Upgrade  Moving from version 6.2 through 6.3, 7.1 to 7.2  Major upgrade requiring.
LWA1 User Programs Report Y. Pihlström (UNM). Outline User Programs purpose and functions o Usefull webpages o Plans for a data base CFP1 report CFP2.
Science Operations Philip Edwards Head of Science Operations 26 May 2010.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Engineering Operations: Parkes Development Projects Erik Lensson, SMIEEE, mSMPTE Head, Engineering Operations 29 October 2009.
ATUC meeting Director’s Report Lewis Ball May 2009 GASS Image McClure-Griffiths & the GASS team.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
Science Operations Philip Edwards Head of Science Operations 29 October 2009.
Connected Classroom Program January 2009 Update. Connected Classroom Program February, FLN 2009 Update.
ATUC meeting Director’s Report Brian Boyle November 2007.
ATUC Meeting, 14 May 2009, Astro Issues Robert Braun.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
MALT Survey meeting / Masers at 7 and 3mm Max Voronkov Software Scientist – ASKAP 04 th June 2009.
Operations Philip Edwards Head of Science Operations 28 October 2008.
SBTeach Introduction School of Business Course Coordination System.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Graeme Carrad Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 28 June 2011 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
Legal Holds Department of State Division of Records Management Kevin Callaghan, Director.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
CABB support and ATCA flux calibration Jamie Stevens ATCA Senior System Scientist 26 May 2010.
Astro Report to ATUC – June 2013 Simon Johnston CSIRO ASTRONOMY & SPACE SCIENCE Head Astrophysics CASS.
Australia Telescope Users Committee - Technologies Report - May 2008.
Component D: Activity D.3: Surveys Department EU Twinning Project.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
The CSIRO ASKAP Science Data Archive Progress and Plans
Science Operations Phil Edwards 14 November 2016
Science Operations Phil Edwards | Head of Science Operations
Early indications of performance
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
Observatory Science Operations
Australia Telescope Users Committee Technologies Report – October 2011
Observatory Science Operations
DBBC Stutus Report November 2007
Presentation transcript:

Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations

Telescope Operations & Science Services Computer Infrastructure Scientific Computing & Archives Visitor services Receivers, LO & Conversion Digital & Servo Electronics Cryogenics Mechanical, Drives, & Electrical Science Operations Engineering Operations National Facility Operations ATNF Operations Structure CSIRO. ATUC report May 2010: ATNF Science Operations

Annual Performance Goals

Telescope Operations and Science Services TAC met in February Eight TAC members supported by 16 TAC readers TAC comments made available through OPAL, and allocated dates through schedule web pages Abstracts of scheduled proposals on ADS Revise proposal deadline time of day from next semester? 2011APR schedules released in early March Release notes added for ATCA, Mopra and Parkes New versions of ATCA, Parkes, Mopra User Guides ATCA forum now in-house: Increased awareness of how observers access information Trials of electronic logs underway ATCA calibrator database being enhanced Amplitude scale cross-checks with EVLA and Planck CSIRO. ATUC June 2011

Scientific computing and archives Updates to CABB scheduler and caobs as new CABB capabilities delivered CABB scheduler now able to be used without requiring an ATNF account (saves files to local disk) Can schedule in galactic coordinates Mosaic files now allow 2048 fields Review of CABB data reduction options  Dave McConnell presentation World Coordinate System implementation in miriad continuing New version of MoniCA rolled out Parkes polarisation software being tested and refined CSIRO. ATUC June 2011

Computer Infrastructure On-going work in upgrading servers and adding storage Oldest storage taken out of service Additional storage for expanded ATOA Network switch replacements at sites Partly in preparation for IP telephony Problems with network links to Narrabri Temporary fix implemented at worst affected areas Fibre to ASKAP installed CSIRO. ATUC June 2011

Visitor Services Group Vicki back in the Project Leader role Visitors now ed after their stay and asked to complete and on-line questionnaire form VSG staff from all three sites had their annual get- together last month Bathroom repairs in all rooms at the Marsfield lodge Observers reminded to make their accommodation bookings at least several days before they plan to arrive! CSIRO. ATUC June 2011

Around the Observatories

Mopra 3mm characterisation observations conducted earlier this semester Fast-mapping observations now routine Change of default cycle time to sec adopted Mopra all-sky webcam in place Balt Indermuehle relocated to Sydney Kate Brooks taken up a role with ASKAP Automated scheduling trials with mock Mopra data being made CSIRO. ATUC June 2011

Around the Observatories

Around the Observatories Parkes Open Day October 8 & 9 (with Opera at the Dish) Four week shutdown in March for MCP upgrade Three week shutdown in May/June to refurbish focus cabin translator rails Ongoing work on Parkes Control & Monitor project with possible remote observing trials later this year Increasing RFI seen over last year: observers asked to record onset, duration and characteristics as accurately as possible CSIRO. ATUC June 2011

Around the Observatories apod/ap html

ASKAP + Ww First fringes at 20cm between LBA and first ASKAP antenna and Warkworth 12m in New Zealand in April/May Observations made of Cen A and PKS Ww has formally joined LBA for observations at 1.4, 2.3 and 8.4 GHz. (See also apod/ap html)

Around the Observatories ATCA 20/13cm (“L/S”) receiver upgrade completed Continuing CABB enhancements Water Vapour Radiometers installed, algorithm development continuing Attempts to remedy instances of erratic azimuth tracking on some antennas continuing… First 6/3cm (“C/X”) prototype provisionally scheduled for installation later this year Increasing instances of 16cm RFI, approaches for mitigating under consideration CSIRO. ATUC June 2011

Around the Observatories Tidbinbilla Improved 22 GHz system and new spectrometer and filters being tested ATNF Vacation Student worked on on-the-fly mapping with Jimi Green and Shinji Horiuchi LBA LBA NAPA observations in May 2011 Warkworth 12m (AUT) formally part of LBA Hydrogen maser installed at ASKAP 8.4GHz receiver demonstrated at ASKAP eVLBI demonstrated between ASKAP & Ww CSIRO. ATUC June 2011

eVLBI success 27 June 2011

Thank you CSIRO/ATNF Philip Edwards CSIRO ATNF Head of Science Operations Web: Contact Us Phone: or Web: