ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer 14-15 June 2007.

Slides:



Advertisements
Similar presentations
Operations Management Maintenance and Reliability Chapter 17
Advertisements

1 Impact of Decisions Made to Systems Engineering: Cost vs. Reliability System David A. Ekker Stella B. Bondi and Resit Unal November 4-5, 2008 HRA INCOSE.
Operation & Maintenance Engineering Detailed activity description
Total Productive Maintenance
Five to Ten Year Vision for CBM by: John S. Mitchell for: ATP Fall Meeting -- Condition Based Maintenance Workshop November 17, 1998, Atlanta Georgia.
MAINTENANCE MANAGEMENT Module 9
Energy Service Fossil Product Portfolio
Q11: Describe how the effects of power supply failures on integrated luminosity will be mitigated. TESLA Response : –Mainly consider two types of magnet.
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
Design for Maintainability
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
Project Management. Maintenance and Reliability 14 Aug 2001.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
Fusion Development Path: A Roll-Back Approach Based on Conceptual Power Plant Studies Farrokh Najmabadi UC San Diego Fusion Power Associates Annual Meeting.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
1 Logistics Systems Engineering Availability NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Solutions for Industrial Services Maintenance is a topic for the top management: from reactive fault repair to a value adding factor Tobias Zaers.
Relex Reliability Software “the intuitive solution
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
CBM + Program Implementation
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
An Expanded View of RAMI Issues 02 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne Reiersen (PPPL),
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
Safety-Critical Systems T Ilkka Herttua. Safety Context Diagram HUMANPROCESS SYSTEM - Hardware - Software - Operating Rules.
Maintenance and Reliability Decisions MGMT3057 © 2011 Pearson Education.
Page 1 of 11 Progress developing an evaluation methodology for fusion R&D ARIES Project Meeting March 4, 2008 M. S. Tillack.
Life cycle services for automation products
RAMI Requirements for DEMO, Gaps, and Thrusts 03 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne.
Safety-Critical Systems 7 Summary T V - Lifecycle model System Acceptance System Integration & Test Module Integration & Test Requirements Analysis.
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
Page 1 HFP Workshop, RAMI Session, 2-4 Mar 2009k,UCLA Why Is Reliability, Availability, Maintainability, and Inspectability Important to the Future of.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting June 2007 M. S. Tillack and A. R. Raffray.
June 2015 Unrestricted © Siemens AG All rights reserved. Page 1siemens.com/asset-analytics Machine Tool Analytics Plant Data Services – Asset Analytics.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Summary of Plant Operations TWG L. Waganer December 2007 ARIES Project Meeting at GT.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Maintenance Management [14]
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Facilities Planning. Facility planning engages in supervising the planning, programming, designing, construction approach, operation and maintenance.
Parts Management Agreements
MAINTENANCE ENGINEERING
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Operations Technical Working Group
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Operations Management
Operations Management
TRL tables: power conversion and lifetime
Operations Management
DIMETRA™ EXPRESS SYSTEM SERVICES
TWG goals, approach and outputs
How To Save Big Bucks with Modeling and Simulation
Presentation transcript:

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007 ARIES Project Meeting at GA

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 2 ARIES Design Approach for High RAM ARIES-AT (and other tokamak predecessors) concentrated on faster maintainability to achieve higher availability - Power core design featured independent sectors that can be quickly removed - Individual vacuum ports allow access to individual sectors -Remove half or all core sectors during same maintenance action - Immediately replace used sector with refurbished sector -Refurbish sectors off line during operation

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 3 ARIES Approach for High Reliability System Reliability is based on several concepts Use high reliability components Have an aggressive testing program to validate component reliability Increase design margin to extend life and decrease likelihood of failure Employ sophisticated modeling and simulation to uncover potential life-limiting conditions and failure modes Implement failure mode and effects (and criticality) analysis Institute an initiative (program) to identify life-limiting or failure predictors Fusion has a very limited component reliability database -Initial database can be constructed from some experimental machines, but component applicability to larger machines may be questionable - Need to start a standard component procurement with extensive testing and reliability enhancement program.

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 4 ARIES Approach for High Maintainability ARIES has developed an approach to achieve a high degree of maintainability -All components including life of plant elements are removable remotely -All internal plumbing removed with sector - Removal sequences designed for fast removal - Unplanned failures can be isolated to a single sector that can be quickly replaced -Maximize standardization of parts, components, and subsystems -Maximize interchangeability of components -Implement a Reactor Health Management System to monitor reactor health and predict maintenance actions -Include Built In Test capabilities into critical components All replaceable power core components have equivalent full power lifetimes that allow all components to be replaced at the same time, thus minimizing maintenance times (maximizing availability) High degree of automation is utilized to reduce radiation exposure, high motion repeatability/precision (accuracy?), and faster operation

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 5 ARIES Approach for High Availability Availability is a combination of reliability and maintainability Avail = Operational Time (at full power)/Total Time Avail = (Total Time – Down Time)/Total Time Avail = (Total Time – Scheduled Down Time – Unscheduled Down Time)/Total Time Avail = (Total Time – Scheduled Down Time –  (MTBF x MTTR) ) / Total Time Scheduled maintenance is based on component wear-out and lifetime and preventative maintenance actions Blanket and Divertor lifetimes are matched to be replaced at same interval Scheduled Blanket and Divertor replacement schedule optimized for availability and capital cost of replacement sectors and maintenance equipment Remainder of scheduled Plant and BOP maintenance (including Turbine maintenance) are scheduled to coincide with FWBD replacement FWBD/BOP maintenance dominates scheduled maintenance as other maintenance can be done off line and redundancy of key components and systems keeps plant operational

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 6 ARIES Approach for High Availability Availability is a combination of reliability and maintainability Avail = Operational Time (at full power)/Total Time Avail = (Total Time – Down Time)/Total Time Avail = (Total Time – Scheduled Down Time – Unscheduled Down Time)/Total Time Avail = (Total Time – Scheduled Down Time –  (MTBF x MTTR))/Total Time Unscheduled maintenance is based on the Sum of Mean Time Between Failures times Mean Times To Repair These failures apply only to components that are necessary for operation Time to repair includes shutdown and startup Redundancy mitigates consequence of failure Ready supply of spares reduces consequence of failure IHMS can mitigate potential failure by scheduling replacement

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 7 Plan to Achieve HIGH RAM High reliability systems have been done before; space, electronics, and automobiles, but low quantity, high complexity applications require more high quality components and testing programs. Fully or highly automated maintenance has only been accomplished in a few instances, fission refueling, deep sea exploration, space, medical, and high cleanliness manufacturing. Modeling and simulation are the likely technologies, supplemented with large scale testing facilities. Achieving high and verifiable availability data will require both analytical simulation and physical testing in integrated prototypical maintenance facilities.