ESOC | Chris Watson | ESA/ESOC | Page 1 Mosaics Operational aspects CHRIS WATSON ESAC.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

EigenFaces and EigenPatches Useful model of variation in a region –Region must be fixed shape (eg rectangle) Developed for face recognition Generalised.
System Development Life Cycle (SDLC)
In Chan Song, Ph.D. Seoul National University Hospital
Phillip Dickens, Department of Computer Science, University of Maine. In collaboration with Jeremy Logan, Postdoctoral Research Associate, ORNL. Improving.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Software Development Methodologies Damian Gordon.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
File Processing - Indirect Address Translation MVNC1 Hashing Indirect Address Translation Chapter 11.
G. Alonso, D. Kossmann Systems Group
© Crown copyright Met Office ACRE working group 2: downscaling David Hein and Richard Jones Research funded by.
Generation of Virtual Image from Multiple View Point Image Database Haruki Kawanaka, Nobuaki Sado and Yuji Iwahori Nagoya Institute of Technology, Japan.
Electric Drives FEEDBACK LINEARIZED CONTROL Vector control was invented to produce separate flux and torque control as it is implicitely possible.
Robust Object Tracking via Sparsity-based Collaborative Model
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Chapter 5 Raster –based algorithms in CAC. 5.1 area filling algorithm 5.2 distance transformation graph and skeleton graph generation algorithm 5.3 convolution.
Time correlation CHRIS WATSON ESAC.
Dewarped Minds United. Progress Report from Bozeman: Simulator Estimating eye motion Dewarping Montaging Mosaicing.
Basics of discriminant analysis
Software Life Cycle Model
RF Drive Test (Testing) Engr. Mehran Mamonai. Introduction Every good RF design, after its implantation should be evaluated. There are few ways to do.
Principles of the Global Positioning System Lecture 11 Prof. Thomas Herring Room A;
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Single and Multiple Spell Discrete Time Hazards Models with Parametric and Non-Parametric Corrections for Unobserved Heterogeneity David K. Guilkey.
COMPGZ07 Project Management Presentations Graham Collins, UCL
System Planning- Preliminary investigation
JWST calibration requirements Harald Kuntschner. JWST - an overview NIRCam –0.6-5 microns –FoV: 2.16x4.4 arcmin (0.0317” for short band and ” for.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
Describing and Exploring Data Initial Data Analysis.
March 16 & 21, Csci 2111: Data and File Structures Week 9, Lectures 1 & 2 Indexed Sequential File Access and Prefix B+ Trees.
Low Latency Data Visualisation Solar Orbiter SOC SOWG #5, ESAC, 8-10 July 2014.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Sept COMP60611 Fundamentals of Concurrency Lab Exercise 2 Notes Notes on the finite difference performance model example – for the lab… Graham Riley,
Forward-Scan Sonar Tomographic Reconstruction PHD Filter Multiple Target Tracking Bayesian Multiple Target Tracking in Forward Scan Sonar.
Analysing Lunar Craters using data from the Liverpool Telescope.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
Applications of Spatial Statistics in Ecology Introduction.
December 9, 2014Computer Vision Lecture 23: Motion Analysis 1 Now we will talk about… Motion Analysis.
March 23 & 28, Csci 2111: Data and File Structures Week 10, Lectures 1 & 2 Hashing.
March 23 & 28, Hashing. 2 What is Hashing? A Hash function is a function h(K) which transforms a key K into an address. Hashing is like indexing.
Science Concept for Additional Functionality in the Mosaic Planning Tool Jeff Valenti.
2006/4/17Extended Image Co-alignment of Solar-B SOT/XRT/EIS Data T. Shimizu (ISAS/JAXA)
Correlation They go together like salt and pepper… like oil and vinegar… like bread and butter… etc.
ANOVA, Regression and Multiple Regression March
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
XRT SOT Alignment DeLuca With comments from Tarbell & Metcalf 21-Jan-2006.
 The same story, information, etc can be represented in different media  Text, images, sound, moving pictures  All media can be represented digitally.
ESAC | Chris Watson | ESA/ESAC | Page 1 “Day in the life” testing of LL VMs CHRIS WATSON ESAC.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
Chapter 3 REVIEW How Can You Measure the Impact of your Strategic Map Over Time?
GTC Commissioning (as of September 2008) Peter Hammersley (GTC)
The road to the first E2E tests
MECH 373 Instrumentation and Measurements
SOC-Produced Auxiliary data
Methodologies and Algorithms
Confidence Intervals.
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
External Memory.
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
IOR and E_FECS ICDs CHRIS WATSON ESAC.
Systems Analysis and Design
Instrument commanding VSTP (i-VSTP)
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Simple Linear Regression - Introduction
CHAPTER 10 Testing Introduction
CHAPTER 10 Testing Introduction
COMP60621 Designing for Parallelism
Presentation transcript:

ESOC | Chris Watson | ESA/ESOC | Page 1 Mosaics Operational aspects CHRIS WATSON ESAC

ESOC | Chris Watson | ESA/ESOC | Page 2 Introduction Here we are only concerned with Spacecraft-actuated raster/mosaics as part of normal science planning Spacecraft points sequentially through a pattern of pointings to build a mosaic, to expand the area to be sampled with high resolution imagers Complicated for a mission built around parallel observing of all instruments Purpose of this discussion? Agree the proposed planning approach for Spacecraft mosaics. Understand foreseen science cases, including typical integration time. If possible, remove complicated unneeded cases from SOC development

ESOC | Chris Watson | ESA/ESOC | Page 3 Example diagram Example show is 3x3 raster on disk centre, at 0.28 AU. FoV used is the SPICE FoV for any slit size below 30” with full scanning. Relevant FOV depends on driving instrument. If combined science (e.g. SPICE+EUI+PHI) then co-alignment becomes relevant as well, since it is the intersection of the individual FoVs that matters. Overlap in planning to - allow for APE (*) - allow for differential rotation and SC movement between pointings - aid post-processing co-registration of acquisitions Actual overlap necessary is debatable. We don’t have firm numbers other than SC APE. (*) Strictly speaking the overlap - needs to allow for both SC + relevant instrument internal effects - does not need to be the full APE, but that part of this error that occurs for two pointings separated by some specific but short time- interval (kind-of a shorter term APE, often called “Spatial Relative Pointing Error”). We don’t have a firm number for this. Diagram simply shows 3.5 arcmin, equivalent to SC APE 16’ 11.1 ’ “Guaranteed” coverage in this example 41’ x 26.3’ 9 dwells and 8 internal slews within the raster 3.5’

ESOC | Chris Watson | ESA/ESOC | Page 4 Planning Approach Background The principal of the planning skeleton file (“E-FECS”) to be distributed from SOC to instrument teams prior to MTP is that it contains ALL information necessary for each instrument to do their planning Changes in pointing matter because Pointing performances are not met (e.g. image acquisitions will be blurred) Possibly other complications as well Planning Approach Any Raster/Mosaic operation will need to be agreed at LTP within SOWG Fix number of dwells and dwell-time at each (even if actual pointing of each not fixed at this stage). …Obviously integration-time at each dwell <= the dwell-time. Allows SOC to construct a robust planning skeleton with fixed times for the raster slews that then forms the basis of the individual instrument planning from MTP onwards. Slewtime baseline We foresee assigning a fixed “worse case” duration for every slew, regardless of slew size We expect duration to be order of 5 mins or less Depends on assumptions of SC coast rate and ramp acceleration/deceleraton E.g deg/sec coast plus ramp assumption => 4 mins E.g. 0.1 deg/sec coast plus ramp assumption => 40 sec Can we agree this approach via MoM?

ESOC | Chris Watson | ESA/ESOC | Page 5 Cruise phase and Remote Sensing Checkout Windows RSCWs will NOT support rasters/mosaic operations Not within scope of instrument checkout. Only exception are identified pointing patterns that are mandatory for instrument characterisation during RSCWs of which the only known examples are The standard pseudo-raster for EUI/PHI flat-fields. BTW Within nominal phase this pseudo-raster will be handled according to the planning approach described previously. METIS straylight (TBC) co-alignment campaign Can we agree this via MoM?

ESOC | Chris Watson | ESA/ESOC | Page 6 Timeline at LTP Contained within the planning skeleton: Identified windows with fixed times, during which the raster slews will occur Time Expected duration order of 5 mins or less

ESOC | Chris Watson | ESA/ESOC | Page 7 Aside: How is this different from slews during normal operations? It isn’t different in principle, but it is different in practice Yesterday we already discussed (simple) sequential pointing schemes through RSWs where perhaps we do pointing-X for e.g. 12 hours, then pointing-Y, then back to pointing-X During VSTP feature tracking, there will be a slew window once per day to allow the opportunity to make a proper motion correction Mosaics are thus special because They involve slews much more often that once-per-day, thus harder to work around. Often they will be driven by the needs of few (one to three) instruments

ESOC | Chris Watson | ESA/ESOC | Page 8 What do you really need? Various possibilities Square rasters, 2x2 3x3? 4x4? 5x5? Also superimposed on feature-tracking Linear raster (1 Dimensional) Packing across a pole Full-disk packing

ESOC | Chris Watson | ESA/ESOC | Page 9 Example non-rectangular case Packing round a pole, down to some specific lattitude

ESOC | Chris Watson | ESA/ESOC | Page 10 Example non-rectangular case Packing round the pole, down to some specific latitude, whilst the SC is rolled Example of how things can become complicated