Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.

Slides:



Advertisements
Similar presentations
Rail Transit Capacity.
Advertisements

Bus Capacity.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
CBTC from the start: 28 years of SkyTrain in Vancouver
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Network Design Unit 4: Service Planning & Network Design.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
10 December J/ESD.204J Lecture 13 Outline Real Time Control Strategies for Rail Transit Prior Research Shen/Wilson Model Formulation Model Application.
Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
CE 515x Train Acceleration, Deceleration, and Impact on Capacity Initial Instructions Work in teams of 2 - Get a new team mate (i.e., one who is not your.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
©David F. Thurston, 2012, All rights reserved Capacity Implications of PTC now and in the Future David Thurston, Ph.D., P.E., FIRSE Vice President – Rail.
Introduction to Transport
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Ch. 7 – Parallel Parking NY State DMV.
CE 515 Railroad Engineering
ANTI LOCK BRAKING SYSTEM
Material Transport Systems
Rail Related Research at IIT Madras
Transportation Engineering
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Stop/ Station Design & Access Unit 6: Station Design & Access.
Public Infrastructure Management Public Transit. What is public transit? Modes.
ANTI LOCK BRAKING SYSTEM
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Asst. Prof. Dr. Mongkut Piantanakulchai
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
TRB 88th Annual Meeting, Washington DC January, 2009 Huan Li and Robert L. Bertini Transportation Research Board 88th Annual Meeting Washington, DC January.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using.
Signalling: Convergence of needs
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Design of Technical Condition Monitoring System of Vehicle Based on CAN Bus Authors : Ruili Zeng, Yunkui Xiao Department of Automobile Engineering Academy.
ROLE OF SIGNALLING IN RAILWAYS
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
S.A.T.U.R.N. Simulation and Analysis Tools for Urban Automated Rapid Transit Networks.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
Summary and Wrap-up Discussion 8 July 2015
Bus Lane Capacity1 BUS LANE CAPACITY. Bus Lane Capacity2 passengers/hour/direction Bus Lane Tram / LRTMetro CAPACITY DEFAULTS 30 YEARS AGO.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
A new fail-safe principle for railway signaling
CE2303 Railway Engineering
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
16 TH S TREET M ALL RTD B OARD OF D IRECTORS S TUDY S ESSION M ARCH 31, 2015.
Adjusting to Urban Traffic Following & Meeting Traffic Managing Space in Urban Traffic Special Urban Situations.
MODULE 4, LESSON 5 Developing Service: Calculating Capacity.
Alternative ways to address growth
Simulation of mixed traffic on a railway section
Positive Train Control
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING
Red Line Customer Capacity Update
University of Colorado A Line and B Line Grade Crossing Update
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Red and Orange Future Reliability
HERO UNIT Training Module
Presentation transcript:

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Outline Fundamentals Train control and signaling Train operating

Materials developed by K. Watkins, J. LaMondia and C. Brakewood FUNDAMENTALS

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Main operational terms Capacity = how many people and buses can move past given location during given time Speed = how quickly people and buses can move from one location to another Reliability = how well the bus schedule can be maintained

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Sources of Delay

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Dwell Time = Passenger Service Time + Boarding Lost Time + Door Opening and Closing Time

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Line Capacity = Max # trains on track in given time Controlled by: Signaling system Longest dwell time Speed restrictions (curves or hills) Line crossings and merges Terminal station turn back time Shared tracks Light rail in mixed traffic Commuter rail with freight

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Person Capacity = Max # people carried in one direction over section in given time Depends on: Number of trains operated Length of trains Passenger loading standards Variations in passenger demand

Materials developed by K. Watkins, J. LaMondia and C. Brakewood TRAIN CONTROL AND SIGNALING

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Train Control and Signaling Signaling is to safely separate trains from each other Automatic train control stops train if signal ignored Early trains used line-of-sight basis Human element responsible for ¾ of incidents

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Train Control and Signaling Three (or four) types of signaling – Fixed-Block Systems – Cab Signaling – Moving-Block Systems – Hybrid Systems Automatic Train Operation Automatic Train Supervision

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Basic Signal Operation

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Fixed-block Systems Detected by the wheels and axles of a train shorting a low-voltage current inserted into the rails. Rails electrically divided into blocks – Short in stations – Longer between stations Block is simply occupied or not – Two blocks can be occupied simultaneously – Two-aspect (red/green) block system – Two empty blocks must separate trains Braking distance plus safety distance Maximum 24 trains per hour typical Up to 30 trains with shorter block lengths – Requires substantial training to operate

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Cab Signaling Electronic codes inserted into each track circuit detected by an antenna on each train. Code specifies max allowable speed for block Displayed in cab Speed is adjusted according to conditions Some signals remain at interlockings and station approach

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Moving-block Systems Similar to fixed-block system with very small blocks Continuously calculates safe distance ahead of each train and relays appropriate speed, braking, or acceleration rate – Requires continuous two-way communication) Computers that control moving-block signaling system can be on train, at a central control office, dispersed along the wayside, or a combination of these.

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Hybrid Shared track – No moving block possible Overlay systems – Allow unequipped trains

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Capacity vs Speed

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Automatic Train Operation & Supervision Originally automatic acceleration ATO links this to train control – Follows optimum speed closer – Increases line capacity 2 to 4% Simple ATS – Display location on central control board Advanced systems (ATS + ATO) – Algorithms correct lateness – Algorithms perfect performance at merges

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Preferential Treatments Transitways Transit Signal Priority Queue Jumps Curb Extensions

Materials developed by K. Watkins, J. LaMondia and C. Brakewood TRAIN OPERATIONS Another component to increase capacity, speed and reliability is

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Train Operations Operating Margins Speeding up Train Operations System Design – Disabled Trains – Maintenance – Special Events / Crowd Management

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Operating Margins

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Speeding up Train Operations Skip-Stop and Express Operation Fare Payment Station and Platform Design Doorway Flows Wheelchair Accommodations

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Disabled Trains and Maintenance

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Crowd Management

Materials developed by K. Watkins, J. LaMondia and C. Brakewood References All materials for this lecture were taken from: Chapter 8 of the TCRP “Transit Capacity and Quality of Service Manual, 3 rd edition”, Inventor Spot, Japan: Overcrowded from Cradle to Grave, Retrieved on 20 May 2014 from nes_overcrowded_6802